INTEGRATED MANAGEMENT SYSTEMS (IMS) OCT 2011 R. Nahon.

Slides:



Advertisements
Similar presentations
Module 13 Oversight Assessment of Auditor Authentication Bodies
Advertisements

Standards and Certification Training Module B – Process B5AStandards & Certification Project Management.
U.S. Pretrial Services and Probation Office Northern District of Ohio.
Samuel Steel Safety Group Meeting Four November 14, 2013 Samuel Safety Systems.
1 Use and content of the RFP  Request for Proposals (RFP) is similar to bidding documents and include all information of the assignment, selection of.
Sustainable Energy Systems Overview of contractual obligations, procedures and practical matters KICK-OFF MEETING.
Surveyor's certification scheme
Role of Surveyor. 2 Role of Classification Societies ► The mission of Classification Societies is to contribute to the development and implementation.
DNS/KMD ISM Checklist – IACS PR 17 Annual class survey ISM checklist (mandatory if ASH or SSH in the job) Class survey ISM report (not mandatory,
© The Association of Independent Schools of NSW Preparing for the ASQA Audit.
D. Keane June Internal Quality Audits (4.14) -ISO Requirements for Internal Audits -The Audit Process -Templates for Meeting Requirements.
TS16949 requirements Subjects –Audit planning –Recertification audit requirements –Auditing Remote supporting functions.
FPSC Safety, LLC ISO AUDIT.
ASPEC Internal Auditor Training Version
ROAD ACCIDENT FUND COMPULSORY BRIEFING SESSION RAF/2014/00009 Date: 26 March 2014 Time: 11:00.
ROAD ACCIDENT FUND NON COMPULSORY BRIEFING SESSION RFP /2013/00021 Date: 22 July 2013 Time: 11:00.
Compliance Monitoring Audit Tutorial Version 1.0 April 2013.
Loss Control Program Compliance Audits An overview of the purpose and procedures of program auditing.
Company Confidential Registration Management Committee 1 AS9104/1 Certification Structures - Client and CB Agreement July 17, 2014 Tim Lee Chair - IAQG.
MARITIME LABOUR CONVENTION MLC, 2006
DNS Quality Plan. 2 Three main axes : Measures to improve the quality of our services Measures to improve the quality of our fleet Measures to enhance.
The role of ERE in Costumer Protection Eduard Elezi Albanian Regulatory Authority ERE Conference “Albanian Energy Sector, Challenges and Regulation” Tirana,
EARTO – working group on quality issues – 2 nd session Anneli Karttunen, Quality Manager VTT Technical Research Centre of Finland This presentation.
ROAD ACCIDENT FUND COMPULSORY BRIEFING SESSION RAF/2014/00008 Date: 24 March 2014 Time: 11:00.
INTRODUCTION TO AUDITING
EU-TURKEY CHAMBER FORUM PROJECT (ETCF) ETCF is funded by the European Union. 1 EU-TURKEY CHAMBER FORUM EU TURKEY CHAMBERS PARTNERSHİP GRANT SCHEME PROCUREMENT.
ISM Code 2010: Part B - Certification & Verification Malcolm Maclachlan.
GRANT MANAGEMENT SEMINARS MEMORANDUM OF UNDERSTANDING.
BIM Bridge Inspection and Maintenance Technical Standards Branch Class B Bridge Inspection Course Inspection Policies and Procedures INSPECTION POLICIES.
Contract Training Class I
Paul Hardiman and Rob Brown SMMT IF Planning and organising an audit.
Company Confidential Registration Management Committee (RMC) AS9104/2A Presentation San Diego, CA January 17, 2013 Tim Lee The Boeing Company 1 Other Party.
Other Party Management Team (OPMT) Status Briefing Americas Aerospace Quality Group (AAQG) Registration Management Committee (RMC) Tim Lee – Chair The.
QUALITY MANAGEMENT STATEMENT
 Definition of a quality Audit  Types of audit  Qualifications of quality auditors  The audit process.
1 UNC Modification 429 Customer Settlement Error Claims Process – Guidance Document.
RBIG WORKSHOP 1 Supply Chain and Asset Management.
Project Management Birutė Markevičiūtė Joint Technical Secretariat Lead Partner Seminar 13 October 2008, Riga.
organization – status 2015 – scheme – integrity program – strategy
Microsoft Dynamics ® NAV 2009 Service Management.
Company Confidential Registration Management Committee 1 AS9104/1 Certification Structures July 22, 2015 Tim Lee Chair - IAQG OPMT The Boeing Company RMC.
Internal Auditing ISO 9001:2015
Leading the way; making a difference NOx Tier III requirements 1. 1.The NOx Tier III enforcement date of 1 January 2016 is kept for already designated.
Webinar Auditor Qualification. “To be the world’s leading, independent, GFSI recognized, ISO based food safety and quality management system for the entire.
CABLING SYSTEM WARRANTY REGISTRATION. PURPOSE OF CABLING REGISTRATION.
Page  ASME 2013 Standards and Certification Training Module B – Process B7. The Appeals Process.
RMC Auditor Workshop Charleston, SC July 2015 Registration Management Committee Company Confidential RMC Auditor Workshop Charleston, SC
Concept Note Preparation CYPRIOT CIVIL SOCIETY IN ACTION IV.
DOCUMENT CONTROL BASICS. Less clutter Avoid missing files More professional look?
Learn Integrated Management System Documentation Process with Ready-to-use EQHSMS Documentation Kit
ISO 9001:2015/14001:2015 Certification Transition Process
Requirements of Documents for Quality Management System ISO 9001 Certification.
Welcome. Contents: 1.Organization’s Policies & Procedure 2.Internal Controls 3.Manager’s Financial Role 4.Procurement Process 5.Monthly Financial Report.
1 FP6 – Financial Management and Reporting 1 April 2006 Sofia, Bulgaria.
Quality Management Supplier Quality Requirements The Manufacturer, testing at works and supply of various distribution cut- outs for wires business on.
ROAD ACCIDENT FUND COMPULSORY BRIEFING SESSION RAF/2014/00009
ISO/IEC
The subcontract template
ROAD ACCIDENT FUND COMPULSORY BRIEFING SESSION RAF/2014/00008
IECEx 02 Audits according to OD 005 Theo Pijpker
ISO 9001:2015 Auditor / Registration Decision Lessons Learned
AAQG Registrar Management Committee (RMC) SAE AS9104/AIR5359 OVERSIGHT RMC Procedure 102 REV 5 Changes 15-Sep-18.
Registration Decision Criteria
AQMS 2016 Transition Training for AUDITORS and DECISION MAKERS
How to conduct Effective Stage-1 Audit
COGAIN Kick-Off 5-6 September, 2004 FINANCIAL GUIDELINES
Presentation transcript:

INTEGRATED MANAGEMENT SYSTEMS (IMS) OCT 2011 R. Nahon

2 Integrated Management Systems - IMS Possible combinations Possible combinations of integrated and harmonised schemes: ► ISM Code ► ISO 9001 : 2000 ► ISO : 2004 ► OHSAS : 2007 ► ISPS (Harmonised Management Systems) ► IPSEM (International Port Safety and Environmental Protection Management Scheme) ► ISO (Energy Management Systems)??????

3 Integrated Management Systems - IMS General ► The PNS 4910 “Qualification of auditors performing integrated systems” was revised in accordance with the agreement between BV and BV Certification. ► The operational procedures are described in the PNSs series 4000: 4030, 4071, 4151, 4450, 4513 and ► BV has developed an intensive training material (see the respective training brochure and training material for a 2 days training session in the Veristar Training Solution database)

INTEGRATED AUDITOR’S QUALIFICATION

5 Integrated Management Systems - IMS Qualified auditors on AUG11

6 Integrated Management Systems - IMS Qualified auditors on AUG11

7 Integrated Management Systems - IMS Integrated Auditor Qualification “Qualification of auditors performing Integrated Systems Audits” Detailed instructions found on PNS 4910 ► BV ISM Auditor (with some audits already performed) has to undertake, at least, 3 further initial or renewal audits (at least, one as a participating auditor and another as a lead auditor) on ISO 9001 and/or ISO and/or HSAS standards (BV Cert had simplified the process for ISM auditors) ► Those 3 audits must be carried out under the supervision of a registered BV Cert lead auditor and are not restricted to shipping companies and their ships ► The qualification of BV Cert auditors is registered on the BV Cert website

8 Integrated Management Systems - IMS Integrated Auditor Qualification ► The CSOM shall attach a Form Plan and Follow-Up Sheet (PNS008) in Qualif to DNS for review. ► BV Cert issue a certificate and send to the CSOM/auditor. ► The experience in “marine transportation”, or similar, shall be evidenced in the “technical code” of the BV Cert website. ► Each CSOM shall contact the BV Cert Local Technical Manager to ensure fully understanding of this process. The BV Cert management does not have the same geographical distribution as Marine (regions/countries/etc). ► In case of any problem in this issue contact: DNS_CTD

INTEGRATED SYSTEMS’ CONTRACT AND INVOICING

10 Integrated Management Systems - IMS Contracts IMS CONTRACTS PNS 4071 ► The Certification Conditions + the Form I* “Application & Quotation” shall be used). The Certification Conditions (with the last version of the Marine General Conditions) must be signed by the client. ► The Form S* “ISO Audit Sampling Plan” shall be agreed and attached to the contract. The company’s fleet shall be considered to define the auditing periodicity of the ISO audits during the ISM audits. Both forms are found in the PNS 4810 Copy of contract to be provided for BV Certification

11 Integrated Management Systems - IMS Contracts PROPOSED TIMING How many days to provide for integrated systems? ► Minimum time duration for ISO Standards are defined in the BV Cert intranet website in BV Portal/BMS ► The minimum audit duration shall be increased of 25% for integrated audits.

12 Integrated Management Systems - IMS Contracts ► Sufficient “Stop over time” to be clearly specified to owner when signing a contract. ► There shall be a clause in the contract considering the possibility of ISO standard audits separated from ISM audits in case of lack of auditor during scheduled call or insufficient stop over time. In this case it may be provided 0,5 day more than provided on previous slide.

13 Integrated Management Systems - IMS Invoicing GUIDE B (next version will specify) B14 ISM / ISO Integrated Systems (IMS) B14.19 ISM / ISO Audits ► When an integrated scheme is contracted a specific criteria of repartition of incomes was agreed between BV and BV Cert., considering: One ISM certification and one ISO certification (ISO 9001 or 14001) One ISM certification and two ISO certifications (ISO 9001 & 14001) ► Additional time, travelling time, overtime and additional audits refers to Guide B to

14 Integrated Management Systems - IMS Invoicing ► One single invoice shall be issued by BV to the client. BV Cert will send an internal invoice to the CSOM of the ship’s Connecting District (CD) for its share, which already considers report, contract reviews, ISO certificate issuance and any additional service required for completion of the process. ► The invoice shall be issued considering the product code of ISM (SM2). No particular disposition provided in SM2 to date. The integrated system shall be mentioned in the invoice. ► An workflow is described in the Guide B with all detail steps to be followed in case of local jobs and international jobs.

INTEGRATED SYSTEMS’ AUDIT

16 Integrated Management Systems - IMS IMS Audits “How to perform an ISM/ISO audit in an IMS” Detailed instructions found on PNS 4151 ► Report forms for ISO audits may be downloaded from BV Cert website (BV considered as a subcontractor from BV cert) - PNS 4810 Rev. 1 - and attached to the ASMS report. The information about an IMS audit shall be mentioned in the “report comment”; ► The ISO reports shall include the: “Surveillance Visit Planning” (SF17) “Audit Plan” (PNS 4151 item 9) “ISO Audit Sampling Plan” (see PNS 4071 and 4810) The report check list found in the BV Cert website

17 Integrated Management Systems - IMS IMS Audits – Audit Plan ► The audit plan in the ASMS shall be used for both audits and must reflect the considered ISO standard (s). The audit plan created in the ASMS by default, allows as much new lines to be inserted as required by the auditor. ► The audit plan shall be communicated in advance

18 Integrated Management Systems - IMS IMS Audits – Company audits ► The “ISO Audit Sampling Plan” (Form S* – PNS 4810) must be updated imperatively during periodical Company audits and annexed to BV Cert. report. ► Company branch offices: ► ISO certification only for the HO - same criteria as for ISM companies’ audits, a sampling program to be established. ► ISO certification for the HO and BOs - a sampling program based on the square root process has to be established If not annexed, the time for the BV Cert. review will be increased until this plan is received, the issuance of the correspondent ISO certificate will be delayed and client complains may be expected.

19 Integrated Management Systems - IMS IMS Certificates “How to issue Integrated System Certificates” Detailed instructions found on PNS 4450 ISM CERTIFICATES ► BV auditors issues SMC/DOC definitive or limited and CM issues definitive after monitoring (same for simple ISM audits).

20 Integrated Management Systems - IMS IMS Certificates ISO CERTIFICATES ► ISO certificates are issued by BV Cert. after satisfactory review of the complete file and report by BV Cert. committee (Company + ship audits) in an average delay of 1 to 2 months if no NC issued and 4 to 5 months when NCs are issued. ► ISO certificates are renewed at each 3 years (after evidence of a minimum of 20 days of audit and 45 hrs of self-study). ► Report shall be submitted to BV Cert. after satisfactory review of corrective action by auditor or the CSOM of the CD (maximum 3 month). ► BV Cert. process requires its specific full report that can be downloaded from the INTERNATIONAL DATA BASE : WebAACS ->

21 Integrated Management Systems - IMS ISO Sampling Process “How to sample ships for ISO audits on an IMS” Detailed instructions found on PNS 4513 ► To cope with the differences in BV and BV Cert schemes in relation to the quantity of ships to be sampled. ► It is of the CSOM responsibility to prepare a plan to be attached to the contract. This plan shall be documented in the “ISO Audit Sampling Plan” (PNS4810) and may be adjusted according with fleet and auditors’ availabilities. ► New ship to the company shall be ISO audited during next ISM audit.

22 Integrated Management Systems - IMS IMS Audits Details in the PNS 4153

23 Integrated Management Systems - IMS IMS Audits General scheme for the first period of certification of a Company (for reference)

INTEGRATED MANAGEMENT SYSTEMS’ REPORT

25 Integrated Management Systems - IMS Integrated Management Systems Reports FINDINGS The NCs are reported in the Form K found in the ASMS. The NCs related to the ISO standards shall be referred on the right side named “Other ref” (§7 PNS 4151). NC/MNC only related to ISO – use ref of the ISM Code. For a MNC only related to the ISO Std, besides a warning will appear in the ASMS reminding about an additional audit to be requested, it is not mandatory but recommended by BV Cert.

INTEGRATED SYSTEMS FROM BV CERTIFICATION

27 Integrated Management Systems - IMS Bv Cert database

28 Integrated Management Systems - IMS Bv Cert database