WMO CIMO in 2014: Continuing to show joint leadership on WIGOS Bertrand Calpini ICG WIGOS co-chair ICG-WIGOS-4, 17-20 Feb 2015.

Slides:



Advertisements
Similar presentations
World Meteorological Organization Working together in weather, climate and water Review of relevant documents to the WMO capacity development activities.
Advertisements

WMO WIGOS Implementation & (WIP) RA I Sub-Regional Workshops for WIGOS and WIS for West / North Africa Nov 2013 Dr I. Zahumensky, WIGOS-PO.
WMO WMO Integrated Global Observing System (WIGOS) CBS EXPERT TEAM ON AIRCRAFT-BASED OBSERVING SYSTEMS 1st Session (Geneva, September, 2013) Dr I.
WMO WIGOS in support of DRR 2013 Coordination Meeting of DRR FP October 2013, Geneva Dr S. Barrell, Chair, ICG-WIGOS Dr I. Zahumensky, WIGOS-PO.
World Meteorological Organization Working together in weather, climate and water Pilot Project V Integration of marine meteorological and other appropriate.
19/5/2011 Cg-XVI, Doc. 3.1(4) World Meteorological Organization Working together in weather, climate and water WWW Programme Instruments and Methods of.
World Meteorological Organization Working together in weather, climate and water Other Cross-Cutting Matters WMO Polar Activities and Global Cryosphere.
World Meteorological Organization Working together in weather, climate and water WIGOS R-WIP-RA VI Jochen Dibbern, RA-VI Focal Point WMO Regional Association.
RA-VI WG-TDI-3 RA-VI WORKING GROUP ON TECHNOLOGY DEVELOPMENT AND IMPLEMENTATION Report of the Chairman Jochen Dibbern Prague, Czech Republic, February.
WMO WIGOS in support of DRR 2013 Coordination Meeting of DRR FP October 2013, Geneva Dr S. Barrell, Chair, ICG-WIGOS Dr I. Zahumensky, WIGOS-PO.
WMO INTEGRATED GLOBAL OBSERVING SYSTEM (WIGOS)
RAI WIGOS IMPLEMENTATION Situation Report as at 16 February 2015 Amos Makarau Chair of the RAI WIGOS Implementation Task Team.
World Meteorological Organization Working together in weather, climate and water WMO OMM WMO CAeM Report to ICG-WIGOS February 2015.
World Meteorological Organization Working together in weather, climate and water WIGOS R-WIP-RA III José Arimatéa de Sousa Brito, RA-III Focal Point WMO.
Surface Transport Service Delivery Dr Tang Xu Director, WDS WMO WMO; Name of Department (ND)
World Meteorological Organization Working together in weather, climate and water WIGOS IMPLEMENTATION IN RA III José Arimatéa de Sousa Brito, Focal Point.
World Meteorological Organization Working together in weather, climate and water WIGOS Implementation in Region VI WMO Jochen Dibbern, Chair CBS OPAG IOS.
WMO WMO INTEGRATED GLOBAL OBSERVING SYSTEM (WIGOS) Cg-17, Agenda Dr S. Barrell, Chair, ICG-WIGOS WMO; OBS.
World Meteorological Organization Working together in weather, climate and water EC WG-CD Terms of Reference and Review of Cg-XVI and EC-LXIII
STATUS OF RELEVANT CIMO EXPERT TEAMS ACTIVITIES CBS / OPAG-IOS / ET-SBO-1 / Doc. 5.4 Isabelle Rüedi Instruments and Methods of Observation Unit Observing.
World Meteorological Organization Working together in weather, climate and water WIGOS Implementation in Region VI WMO Dieter Schröder Chair WG-TDI Deutscher.
ICG-WIGOS-3 Status of the WIGOS Operational Information Resource (WIR) Etienne Charpentier (OBS/WIGOS/OSD) WMO; OBS.
WMO Collaboration with EUMETNET in WIGOS Implementation ICG-WIGOS-3 (Geneva, 14 February 2014) Miroslav Ondráš, Chief, WMO Observing Systems Division WMO;
World Meteorological Organization Working together in weather, climate and water WIGOS – WMO Foundation for Meeting the Observing needs of Weather, Climate,
WMO WMO INTEGRATED GLOBAL OBSERVING SYSTEM (WIGOS) Dr L. P. Riishojgaard, WIGOS Project Manager WMO Secretariat, Geneva WMO; OBS.
WMO WMO INTEGRATED GLOBAL OBSERVING SYSTEM (WIGOS) TT-PWPP-2 Chair's Opening Remarks WMO; OBS.
WE Surface-based Global Observing System for Weather.
Instruments and Methods of Observation Programme.
World Meteorological Organization Working together in weather, climate and water WMO OMM WMO Report of CAeM-XIV EC-LXII Geneva, Switzerland.
WE Surface-based GOS for Weather January 2008 Up-date.
WMO WIGOS Regulatory Material - WRM Report to ET-SBO-1, 9-12 July 2013 Russell Stringer Chair, Task Team on WIGOS Regulatory Material (TT-WRM) Co-chair,
WMO Moving from the WIGOS Framework towards the Pre-operational Phase A. Makarau President of RA I.
WMO WMO INTEGRATED GLOBAL OBSERVING SYSTEM (WIGOS) STATUS OF IMPLEMENTATION (Dr S. Barrell, Chair, ICG-WIGOS) WMO; OBS.
Overview of WIGOS activities in RA-IV Curaçao 2 December 2015.
WMO CAS 2016 Report to WIGOS Sandro Fuzzi National Research Council Bologna, Italy ICG-WIGOS Fifth Session, January 2016.
WMO RESPONSES OF WMO TECHNICAL COMMISIONS TO WIGOS IMPLEMENTATION Progress of WIGOS activities within Technical Commissions (Bertrand Calpini, co-Chair,
REVIEW OF WIGOS ACTIVITIES Outcomes from the Joint RA II/RA V WIGOS Workshop on DRR ICG-WIGOS-5 WMO; OBS/WIGOS.
World Meteorological Organization Working together in weather, climate and water ICG-WIGOS 5 Progress on WIGOS activities within CBS WMO Dr. Jochen Dibbern.
WMO ICG-WIGOS-5 GENEVA, SWITZERLAND, JANUARY 2016 Bertrand Calpini, Co-Chair ICG-WIGOS, CIMO President ICG-WIGOS >>> Our next challenges.
WMO WMO INTEGRATED GLOBAL OBSERVING SYSTEM (WIGOS) ICG-WIGOS-5 Opening Remarks Sue Barrell, Co-Chair ICG-WIGOS WMO; OBS.
WMO CIMO and WIGOS Bertrand Calpini ICG WIGOS co-chair ICG-WIGOS-3, Feb 2014.
WMO WIGOS Pre-operational Phase Regional & National Perspectives Tyrone W. SUTHERLAND (BCT, EC FP for WIGOS)
D R I V I N G F O R R E S U L T S : S T R E N G T H E N I N G T H E S C I E N C E B A S I S A N D C A T A L Y T I C R O L E O F U N E P UNECE Working Group.
WMO INTEGRATED GLOBAL OBSERVING SYSTEM (WIGOS)
Yoshiro TANAKA Japan Meteorological Agency
“from TECO 2016 Madrid to WIGOS Visions 2040” Bertrand Calpini
WIGOS Data Quality Monitoring System (WDQMS)
Regional WIGOS Centres
The Jakarta Declaration
ET-SBO Report to ICT-IOS-9
5th Session of the Task Team on WIGOS Metadata
Regional Basic Observing Network Concept
WMO Integrated Global Observing System (WIGOS) 16-RA VI Side Event Helsinki, Finland, 11 September 2013 Dr Miroslav Ondráš, Dr Wenjian Zhang (WMO) Dr.
WIGOS Pre-operational Phase
WIGOS Pre-operational Phase
5. STATUS OF THE PRIORITY AREAS IMPLEMENTATION OF THE PLAN FOR THE WIGOS PRE-OPERATIONAL PHASE (PWPP) 5.2 WIGOS Regulatory Material complemented with necessary.
4.2(2) WIGOS Editorial Board (WEdB)
Overview of the WMO Integrated Global Observing System (WIGOS)
Dr Sue Barrell, Australia
REPORT on RWCs in RA VI Ivan Čačić President RA VI ICG-WIGOS-7
Decisions and Recommendations for the
Workshop (… 2016) WIGOS Project Office
WIGOS Pre-Operational Phase;
Regional WIGOS Centre Tokyo
WIGOS Implementation in Region IV
The WIGOS Pre-Operational Phase
The status and Plan in 2019 for the WIGOS centers in RA II
Inter-Commission Coordination Group On WIGOS
Commission on Instruments and Methods of Observation
4. STATUS OF THE PRIORITY AREAS IMPLEMENTATION OF THE PLAN FOR THE WIGOS PRE-OPERATIONAL PHASE (PWPP)   4.4 Development and implementation of the WIGOS.
Presentation transcript:

WMO CIMO in 2014: Continuing to show joint leadership on WIGOS Bertrand Calpini ICG WIGOS co-chair ICG-WIGOS-4, Feb 2015

WMO CIMO Activities and WIGOS, CIMO-16 2.WMO/ISO Common Standards 3.CIMO/WIGOS Standardization Workshop 4.International Cloud Atlas 5.Capacity Development 6.Instrument Intercomparisons ICG-WIGOS-4, Feb 2015

WMO CIMO 16  St Petersburg, Russian Federation, July 2014  Latest version of CIMO Guide approved:  New Satellite Obs Part (CBS, 7 chapters)  New Lightning Chapter  New Radar chapter  New Upper Air chapter  New Atmospheric Composition chapter (CAS)  Most other chapters updated  Commission structure adjusted and now fully aligned with WIGOS ICG-WIGOS-4, Feb 2015

WMO WMO/ISO Common Standards  Siting: publication imminent  Doppler Wind Lidar: drafted, undergoing approval process  Radar Wind Profiler: about to get underway  Weather Radar: getting underway (cautious aproach required)  Rainfall Intensity: to be pursued  Others? (As required, Stay tuned)…….. ICG-WIGOS-4, Feb 2015

WMO CIMO/WIGOS Standardization Workshop  Langen, Germany, 3-5 December 2014  Focus on surface-based remote-sensing  Broad representation from RICs and remote sensing observations community  11 Recommendations (the following of particular relevance to ICG-WIGOS): ICG-WIGOS-4, Feb 2015

WMO CIMO/WIGOS Standardization Workshop  Recommendation 1: Strengthening the RICS  Regional Associations ensure that the Regional Instrument Centre activities defined in each Regional WIGOS Implementation Plan are implemented with priority.  Recommendation 4: Metrology assistance to remote sensing community  Regional Instrument Centres should provide support to the surface-based remote sensing community in its efforts to develop traceability of measurements made by existing and emerging remote sensing technologies. ICG-WIGOS-4, Feb 2015

WMO CIMO/WIGOS Standardization Workshop  Recommendation 5: Weather Radars  CIMO and CBS Management Groups seek the support of the Inter Commission Coordination Group on WIGOS to establish a CIMO/CBS-led international coordination mechanism for weather radar systems and their data and products, which involves the participation of nations operating large weather radar networks, capitalizes on the positive experience achieved within regional cooperation mechanisms, such as OPERA and BALTRAD in Europe, and includes a strong focus on capacity development. ICG-WIGOS-4, Feb 2015

WMO CIMO/WIGOS Standardization Workshop  Recommendation 10: Integration (compositing) of observations  That CIMO Management Group review relevant workplans to include investigations, guidance and the use of Observations Systems Capability Analysis and Review (OSCAR) Tool to increase the utility of, and benefits from, observational products derived from the integration or compositing of measurements from multiple technologies. ICG-WIGOS-4, Feb 2015

WMO Revision of the International Cloud Atlas  Text being rewritten (30% complete)  Decision Aid redesigned (95% complete)  Replacement imagery:  Image submission website almost ready.  Letter to PRs requesting candidate images and metadata imminent  Web design to follow.  Still lacking financial resources to build the web- based atlas: voluntary member contributions sought via CIMO Trust Fund. ICG-WIGOS-4, Feb 2015

CIMO in WIGOS Capacity Development: 2014 ICG-WIGOS-4, Feb 2015  TECO 2014 St Petersburg  5 keynote addresses  36 orals  ~80 posters  3 discussion sessions (standardization, centennial stations, future intercomparisons)  Collaboration with ETR and RTCs on content of (numerous) Regional Wkshops on calibration and traceability  Survey conducted on use of mercury and obsolete instruments  Mercury still widely used  Autographic instrument still widely used  Minamata convention (UNEP): Ban on production, import and export of instruments containing Hg from 2020

CIMO in WIGOS Capacity Development: 2015 ICG-WIGOS-4, Feb 2015  Collaboration with ETR and RTCs on content of (numerous) Regional Wkshops on calibration and traceability  Calibration and Maintenance Course (Spanish), Argentina, Q4  Conference on Measurements in harsh environment (icing), in collaboration with RA VI (Europe)  WIGOS AWS Workshops  Further updates to CIMO Guide on use of alternatives to Hg-based instrumentation

CIMO Intercomparisons ICG-WIGOS-4, Feb 2015 SPICE (approaching the finish, final data collection underway, report due end 2015) RQQI (in need of restart) IPC 2015 Radiosondes (feasibility study underway) Aerosol and Volcanic Ash (feasibility study underway)

Thank you for your attention