Tesla Meeting Frascati 27/05/03 C. Magne Cold BPM for TTF2 Tesla prototype - low beam impedance - cooling to 2K without strain - Low beam coupling impedance:

Slides:



Advertisements
Similar presentations
Stochastic cooling and 56 MHz SRF update for Run-14 W. Fischer 21 January 2014.
Advertisements

MICE RF and Coupling Coil Module Outstanding Issues Steve Virostek Lawrence Berkeley National Laboratory MICE Collaboration Meeting October 26, 2004.
Cavity BPM for Spectromety: progress and plans A. Lyapin.
1 KEK Cavity BPM Hitoshi Hayano Development of Cavity BPM for Q-magnet attachment, Aiming; compact design, 0.2µm resolution, BPM center error (between.
Integration of Cavities and Coupling Coil Modules Steve Virostek Lawrence Berkeley National Laboratory MICE Collaboration Meeting March 28 – April 1, 2004.
PEDM Review 12/7/091 Beam Position Monitors William Morse.
Bob Lill Undulator Systems – BPM April 20, 2006 Undulator Cavity BPM Status and Plans.
DESIGN OF A 7-CELLS, HOM DAMPED, SUPERCONDUCTING CAVITY FOR THE STRONG RF FOCUSING EXPERIMENT AT DANE David Alesini, Caterina Biscari, Roberto Boni, Alessandro.
SPIE Conference - Photonics Applications in Industry and Research, Warsaw, 30 August, The RF Power Coupler Development Program at LAL-Orsay and.
Status of vacuum & interconnections of the CLIC main linac modules C. Garion TE/VSC TBMWG, 9 th November 2009.
SRF Results and Requirements Internal MLC Review Matthias Liepe1.
ESS cavities interfaces
KEKB Crab Development K. Hosoyama (KEK) Crab Cavity for HER Crab Cavity for LER Crab Cavity for KEKB History of Crab Cavity R&D Characteristics of Crab.
BPMs and HOM-BPMs for the XFEL Linac N. Baboi for the BPM and the HOM teams (DESY, CEA-Saclay, SLAC, FNAL, Cockroft/Daresbury) XFEL Linac Review Meeting,
Summary of AWG7 SCRF technologies Eiji Kako Wolf-Dietrich Moeller Akira Yamamoto Hitoshi Hayano Tokyo, Nov
Experience on design, prototyping and testing of cavity BPM for the European-XFEL > Motivation > Introduction > Principle of CBPMs > Mechanical properties.
Summary of WG 2 - cavities W. Weingarten 15th SPL Collaboration Meeting CERN - 25/26 Nov Cavity WG.
Status of the Fermilab Cold BPM R&D Manfred Wendt Fermilab 10/1/20091LCWA09 Main Linac WG.
1 Status of the CLIC two-beam module program A. Samochkine, G. Riddone Acknowledgements to the Module WG members 4 February 2014 CLIC Workshop 2014 (3-7.
1 C. Simon CLIC Instrumentation workshop BPM C. Simon on behalf of the Saclay’s group CLIC Instrumentation workshop 2 nd - 3 rd June.
The Cavity Beam Position Monitor (BPM) Massimo Dal Forno Paolo Craievich, Raffaele De Monte, Thomas Borden, Andrea Borga, Mauro Predonzani, Mario Ferianis,
The beam-based alignment and feedback systems, essential operations of the future colliders, use high resolution Beam Position Monitors (BPM). In the framework.
1.3GHz Input Coupler for ILC
LCWS13, November 2013 At the University of Tokyo W.–D. Möller Status of the TTF3 RF Power Coupler.
Test plan for SPL short cryomodule O. Brunner, W. Weingarten WW 1SPL cryo-module meeting 19 October 2010.
Production and Installation Policy of IP-BPM ATF2 Project Meeting, 2006/12/18 Y. Honda, Y. Inoue, T. Hino, T. Nakamura.
CLIC09 Workshop October 2009Drive beam BPM’sLars Søby 1 Drive Beam BPM’s CLIC 09 work shop, CERN, of October 2009, Lars Søby.
High resolution cavity BPMs in the context of the European XFEL
Status of the Cold BPM Developments at CEA Saclay and Fermilab L-Band Cavity BPM: Nathan Eddy, Andrei Lunin, Eric Pirtle, Gennady Romanov, Nikolay Solyak,
Beam Test status and Plans of the ILC Main LINAC BPM
Summery of the power coupler session at the LCWS13 workshop E. Kako W.-D. Möller H. Hayano A. Yamamoto All members of SCRF WG November 14, 2013.
1 Cold L-Band Cavity BPM: Design Status July 2006 Gennady Romanov Linda Valerio Manfred Wendt Fermilab July 21, 2006.
BPM for FF test (ATF2) Vladimir Vogel KEK 2nd Nano Workshop, KEK, December 12, 2004.
CARE Steering Committee, Paris, 5 septembre 2005O. Napoly, CEA/Saclay 1 SRF Work Packages 2 Improved Standard Cavity Fabrication 2.1 Reliability analysis.
A New Stripline BPM Design for the ILC IR Fast Feedback (?!) – For discussion: A metal/ceramic brazed BPM pickup – 9/19/2007ILC IR Engineering Design Workshop,
Fermilab BPM R&D Activities Nikolay Solyak, Manfred Wendt Fermilab Nicolas Chritin, Lars Soby CERN Nobuhiro Terunuma, Junji Urakawa KEK March 26-30, 20101LCWS10.
DaMon: a resonator to observe bunch charge/length and dark current. > Principle of detecting weakly charged bunches > Setup of resonator and electronics.
A. Faus-Golfe, J.V. Civera, C. Blanch and J.J. García-Garrigós whit the help of the CTF3 Collaboration 1 CTF3 meeting Jan-09.
MLI Summary Chris Adolphsen SLAC. Summary of MLI Talks Quadrupoles (V. Kashikhin) –Expect test of a SLAC/CIEMAT and FNAL cos(2phi), ~ 60 T/m, SC Quads.
Cold BPM development in KEK H. Hayano, March 2011 Jung Keun Ahn (PNU), Sun young Ryu (PNU), Eun San Kim (KNU), Young Im Kim (KNU), Jin yeong Ryu (KNU),
Cavity BPM Simulations A. Liapine. Analysis of the Existing BPMs BINP KEK.
Development of a High Resolution Cavity BPM for the CLIC Main Beam
The Superconducting cavities of the European Spallation Source Superconducting Technologies Workshop CERN – 4 & 5 December 2012 Sébastien Bousson (CNRS/IN2P3/IPN.
16/01/12DITANET Topical Workshop on Beam Position Monitors Reentrant Beam Position Monitors DITANET Topical Workshop on Beam Position Monitors 16 th –
D. Lipka DESY Hamburg Dark current Monitor for the European XFEL, tests at PITZ and FLASH.
LCLS-II Button-type BPM (Review) Nikolay Solyak Review, FNAL, Dec. 12, 2014.
Preparation procedure and RF processining of cERL-ML power coupler at KEK Hiroshi Sakai, Takaaki Furuya, Masato Sato, Kenji Shinoe, Kensei Umemori, Kazuhiro.
Power couplers Timergali Khabiboulline (FNAL) FNAL-LBNL meeting on NGLS April 13, 2012.
MLI Update Chris Adolphsen SLAC. CAVITY VESSEL T4CM QUAD T4CM BPM QUADS LEADS 80K BLOCK 4K BLOCK Quadrupole Package.
1CEA/ Saclay/ SACM CARE/SRF/WP11 Development of a new Beam Position Monitor for FLASH, XFEL and ILC Cryomodules Claire Simon, Michel Luong, Stéphane Chel,
Two-beam module layout
Cavity BPM for CALIFES C. Simon, M. Luong, D. Bogard, W. Farabolini, J
Re-entrant BPM R&D for ILC Main Linac
XFEL beamline loads and HOM coupler for CW
CAVITY BPM FOR CALIFES Claire Simon, Michel Luong, D. Bogard, P
Wakefield & Cavity based Monitors: Fermilab BPM Development Plans
For Discussion Possible Beam Dynamics Issues in ILC downstream of Damping Ring LCWS2015 K. Kubo.
CLIC Workshop 2016: Main Beam Cavity BPM
Part2: Cavities and Structures
    BEAM POSITION MONITORS USING A RE-ENTRANT CAVITY C. Simon1, S. Chel1, M. Luong1, P. Contrepois1, P. Girardot1, N. Baboi2 and N. Rouvière3.
Summary on WG 2 LINAC Technology.
ERL BPM System Mike Billing, Mark Palmer
Bunch Tiltmeter Steve Smith SLAC Snowmass July 16, 2001 Update date
IHEP Cryomodule Status
Fabrication of KEK-ATF2 Q-BPM
Status of HOMS Spectra Measurements in 1.3 GHz Cavities for LCLS-II
Beam Position Measurements in TTF Cavities
Part2: Cavities and Structures
Double-Spoke Cavities
Breakout Session SC3 – Undulator
Presentation transcript:

Tesla Meeting Frascati 27/05/03 C. Magne Cold BPM for TTF2 Tesla prototype - low beam impedance - cooling to 2K without strain - Low beam coupling impedance: reduces the beam break-up forces and minimizes the cryogenic heat-load due to resonances. - The (axial) geometry is favorable to cooling to 2K without strain. - The dimensions are small. - The design is adapted to UHV dust- free conditions. - The mechanics is relatively simple to machine (lathe  precision of axial sym.) Ability to measure sum signal and dark current

Tesla Meeting Frascati 27/05/03 C. Magne WIDE-BAND MEASUREMENT Antennae mechanically and electrically connected to opposite wall of the cavity very low external Q 1 : antennae fully pushed ~100 MHz bandwidth 2 : antennae withdrawn Then the BPM bandwidth is determined by the Bessel filter downstream : filter mono dipole on TTF: 4 or 8 MHz

Tesla Meeting Frascati 27/05/03 C. Magne  78 beam pipe 8 mm gap 50 mm cavity length 140 mm total length with flanges 650 MHz demountable Severe tolerances were applied on R1, R2, and the perpendicularity of the assembling surface (2/100). Concentricity actually measured : better than 20  m. When cooling down to 2K: - the cylindrical shape of the cavity, and the outer position of the antennae, are perfectly preserved - the room t° calibration is still valid (out of resonance measurement). TTF1

Tesla Meeting Frascati 27/05/03 C. Magne RESULTS ON TTF1 5 reentrant BPM installed on BPM, one at 2K inside the capture cavity cryostat. 1COL1 : BW = 8 MW measurement range : +/- 3 mm detected signal: FWHM = 130 ns 1: Delta signal 2: Sum signal From noise (15 mV) and sensitivity (1.5 V/mm) levels: estimated 0.8 nC = 10 µm Extrapolations (caution !) : - resolution ~ beam charge - resolution ~ sqrt ( BW ) Only valid if isolation S/D < 50 dB over whole bandwidth

Tesla Meeting Frascati 27/05/03 C. Magne 22/01/02 Reentrant BPM for TTF2 Fabrication and mounting procedure Reentrant BPM for TTF2 Fabrication and mounting procedure Fabrication of the BPM cavity The 2 parts of the cavity are assembled by EB welding Leak test Fabrication of the feedthroughs. At Saclay Fabrication of the part: flange with bellow. (Shorten the bellow) Firing of the flange+bellowAt DESY Cu coating of the flange+bellow Firing (900  C) of the BPM cavity Welding of the flange+bellow to the BPM cavity.At DESY RF calibration.At Saclay Welding to quadrupole beam tube, (TIG welding from inside, with tool providing centering and azimuthal positioning). At DESY Cleaning of the BPM cavity. Cleaning of the feedthroughs.At DESY Mounting onto quadrupole, (Centering of the BPM w.r.t. the quad is made with an external part, which is fixed by a few TIG welding points)At DESY

Tesla Meeting Frascati 27/05/03 C. Magne - Firing 1200°C Cu coated bellow (Fluhman) RF calibration on testbench (rod simulates beam) Chemistry TIG welded (from inside) to quad beam pipe Will be installed in ACC1 Cold bpm for ttf2 - status X (mm) Y (mm) RF calibration - mapping

Tesla Meeting Frascati 27/05/03 C. Magne CALIBRATION 50   HP8510A Network analyser

Tesla Meeting Frascati 27/05/03 C. Magne HP8510A Network analyser 50  CHECK AFTER MOUNTING rlu l dB -41.6°deg. u ° ° d ° ° °

Tesla Meeting Frascati 27/05/03 C. Magne PROPOSED PARAMETERS FOR A TESLA to be discussed The ratio (meas. range)/resolution cannot exceed a few To be studied: - isolation of the hybrid coupler - digitized processing after frequency downconversion to 200 MHz. measurement frequency900 MHz Bessel filter bandwidth50 MHz detected signal FWHM20 ns position 4nC/bunch1 µm time resolution20 ns working at 2K

Tesla Meeting Frascati 27/05/03 C. Magne “R and D on rf-cavity BPM inside a cryomodule” in the SRFTECH Joint Research Activity. (SRFTECH, Superconducting Radio-frequency Technology, Co-ordinator : T. Garvey ) testing of one such BPM in a TTF2 module, and possibly the design of a new electronics. Milestones: Mid-2004 (As soon as TTF2 commisionning with beam is started): results of the prototype installed in the cold module: performance with analog electronics and cryogenic losses. Beg-2006 Commissionning of BPM with new digital electronics. If approved this program will start beg. of 2004.

Tesla Meeting Frascati 27/05/03 C. Magne Possible program for a new R & D An improvement in the resolution, flexibility and cost of the BPM is needed to meet the TESLA requirements. The goals for the new R & D are: - To increase the resolution to 10 µm while keeping a fast time response. This will will be obtained by 2 improvements: - optimization of the rf cavity shape to have a better common mode rejection, - design and fabrication of a high isolation hybrid coupler. The parameters required for TESLA are a 10 µm resolution and a time response as low as possible. - To adapt the cavity mechanics to the adjacent new superconducting quadrupole developed by CIEMAT/DFFPE, Madrid. The alignment tolerance is 100 µm. - To provide a more flexible operation. This will be obtained with the design and fabrication of a new electronics based on digital signal processing. It will benefit from the low cost components developed by the telecommunication industry. outlook BPM based on a cylindrical reentrant RF cavity equipped with 4 weakly coupled antennae. The associated wideband electronics allows 100 ns time-domain response without too much degradation of the resolution (in the case of the very short TESLA bunches).

Tesla Meeting Frascati 27/05/03 C. Magne Transparency D. Nölle

Tesla Meeting Frascati 27/05/03 C. Magne Dark Current Monitor - design Optimised to measure the monopole mode signal at 1.3GHz. However we keep the 4-antenna design for 2 reasons: - the sensitivity and homogeneity of the dark current measurement is increased - it can be used as a BPM later, by adding adequate electronics. Dipole mode frequency = 2.6 GHz. antenna

Tesla Meeting Frascati 27/05/03 C. Magne Dark Current Monitor – laboratory test F mono = 1.3 GHz F dip = 2.6 GHz Alu prototype An aluminium prototype has been fabricated to study the optimum antenna design. - Network analyser - testbench Electronics (analog): - One unit (refurbished) is avalaible - Need to build 1 (or 2?) more