Hydrologic Design and Design Storms Readings: Applied Hydrology Sections 13.1-13.2 04/18/2005.

Slides:



Advertisements
Similar presentations
Flood Risk Analysis – the USACE Approach
Advertisements

Hydrologic Statistics Reading: Chapter 11, Sections 12-1 and 12-2 of Applied Hydrology 04/04/2006.
Sensitivity Analysis In deterministic analysis, single fixed values (typically, mean values) of representative samples or strength parameters or slope.
DES 606 : Watershed Modeling with HEC-HMS Module 12 Theodore G. Cleveland, Ph.D., P.E 29 July 2011.
Hydrologic Statistics
Reading: Applied Hydrology Sections 14-5, 14-6
OKLAHOMA STATE UNIVERSITY Biosystems and Agricultural Engineering Department Hydrology 101 OKLAHOMA STATE UNIVERSITY Biosystems and Agricultural Engineering.
Water Resources Planning and Management
Design of Open Channels and Culverts
Engineering Economic Analysis Canadian Edition
International Workshop to Discuss the Science of Asset Management
Hydrologic Design and Design Storms Venkatesh Merwade, School of Civil Engineering, Purdue University Some slides are taken from Dr. David Maidment, University.
Surface Water Hydrology Summarized in one equation V = velocity, fps or m/s A = channel cross-sectional area, sf or m 2.
WFM 5201: Data Management and Statistical Analysis
HEC-RAS US Army Corps of Engineers Hydrologic Engineering Center
HEC-RAS.
Hydrologic Design and Design Storms
BUILDING STRONG ® Hydrologic Engineering Center Use of Information on Hydrologic Extremes: US Army Corps of Engineers Perspective Beth Faber, PhD, PE USACE,
Kansas City Industrial Council Hydrology and Hydraulics
HEC-FDA Flood Damage Reduction Analysis Pete Andrysiak Sources: HEC-FDA Users Manual Version 1.0 Jan 1998 Metropolitan region of Louisville, Kentucky Study.
Analyses of Rainfall Hydrology and Water Resources RG744
Flood Frequency Analysis
Water Resources Planning and Management Daene C. McKinney Simulating System Performance.
History and Evolution of the PMP/PMF
WinTR-20 Project Formulation Hydrology Computer Program Basic Input and Output Presented by: WinTR-20 Development Team.
WinTR-20 Project Formulation Hydrology Computer Program Basic Input and Output Presented by: WinTR-20 Development Team.
El Vado Dam Hydrologic Evaluation Joseph Wright, P.E. Bureau of Reclamation Technical Services Center Flood Hydrology and Meteorology Group.
Beargrass Creek Case Study Description of the Study Area Hydrology & Hydraulics Economic Analysis Project Planning Assessment of the Risk Based Analysis.
Hydrologic Design Reading: Applied Hydrology Sections 13-1, 13-2.
1 Flood Hazard Analysis Session 1 Dr. Heiko Apel Risk Analysis Flood Hazard Assessment.
WinTR-20 SensitivityMarch WinTR-20 Sensitivity to Input Parameters.
CE 3354 ENGINEERING HYDROLOGY Lecture 6: Probability Estimation Modeling.
Rush River Assessment Project Hydrologic Flow Study Sibley County SWCD Presentation to the Minnesota River Research Forum March 10, 2005.
IRP Approach to Water Supply Alternatives for Duck River Watershed: Presentation to XII TN Water Resources Symposium William W. Wade Energy and Water.
FREQUENCY ANALYSIS.
Frequency Analysis and Data Reading: Applied Hydrology Sections
Hydraulic and Hydrologic Considerations in Planning Course FLOOD RISK MANAGEMENT Chuck Shadie Mississippi Valley Division.
Engineering Economic Analysis Canadian Edition
Hydrologic Design Storms
Assessment of Economic Benefits of the North Carolina Floodplain Mapping Program Hydrologic and Hydraulic Case Studies Adapted from a Presentation to NRC.
Design Storms CE 365K Hydraulic Engineering Design Spring 2015.
WinTR-20 SensitivityFebruary WinTR-20 Sensitivity to Input Parameters.
Methodology for Risk-Based Flood Damage Assessment David R. Maidment CE 394K.2, Spring 1999.
Penny Coombes Sarah Wharton Gary Davies Simon White River Bee, Desing FLOOD ALLEVIATION FEASIBILITY.
Basic Hydrology & Hydraulics: DES 601
CE 3372 Water Systems Design Lecture 18: Storm sewers, inlets, conduits and related hydrology and hydraulics.
Basic Hydrology: Gauge Analysis. Gage Analysis Gage analysis is use of historical records to construct a frequency curve for a gauging station. This frequency.
Floodplain Management D Nagesh Kumar, IISc Water Resources Planning and Management: M8L5 Water Resources Systems Modeling.
Surface Water Surface runoff - Precipitation or snowmelt which moves across the land surface ultimately channelizing into streams or rivers or discharging.
CE 3354 ENGINEERING HYDROLOGY Lecture 6: Probability Estimation Modeling.
Uncertainty and Reliability Analysis D Nagesh Kumar, IISc Water Resources Planning and Management: M6L2 Stochastic Optimization.
Water Resources Planning and Management Daene C. McKinney System Performance Indicators.
Basic Hydraulics: Rating curve. Definition & terminology Rating curve, also known as stage–discharge curve, is a graph showing the relation between the.
March Urban Flood Risk Management. March Objectives Understand the Nature of Flooding & Flood Damage Alleviation Understand the Nature of.
Sanitary Engineering Lecture 4
UNIT – III FLOODS Types of floods Following are the various types of floods: 1.Probable Maximum Flood (PMF):This is the flood resulting from the most sever.
Regional to Engineering Scale HUC8 HUC12 Catchment Engineering Hydrology Engineering Hydraulics Personal – a flooded home.
Analyses of Rainfall Hydrology and Water Resources RG744 Institute of Space Technology October 09, 2015.
Hydrological Statistics
Basic Hydrology & Hydraulics: DES 601
CE 3372 Water Systems Design
Flood Frequency Analysis
Hazards Planning and Risk Management Flood Frequency Analysis
CEE 3430 – Engineering Hydrology David Rosenberg March 26, 2012
Precipitation Analysis
Hydrologic Statistics
Flood Frequency Analysis
Floods and Flood Routing
Love Field Modernization Program
HEC-RAS US Army Corps of Engineers Hydrologic Engineering Center
Presentation transcript:

Hydrologic Design and Design Storms Readings: Applied Hydrology Sections /18/2005

2 Hydrologic extremes Extreme events – Floods – Droughts Magnitude of extreme events is related to their frequency of occurrence The objective of frequency analysis is to relate the magnitude of events to their frequency of occurrence through probability distribution It is assumed the events (data) are independent and come from identical distribution

3 Hydrologic design Water control – Peak flows, erosion, pollution, etc. Water management – Domestic and industrial use, irrigation, instream flows, etc Tasks – Determine design inflow – Route the design inflow – Find the output check if it is sufficient to meet the demands (for management) Check if the outflow is at safe level (for control)

4 Hydrologic design scale Hydrologic design scale – range in magnitude of the design variable within which a value must be selected Design considerations – Safety – Cost Do not design small structures for large peak values (not cost effective) Do not design large structures for small peak values (unsafe) Balance between safety and cost.

5 Estimated Limiting Value (ELV) Lower limit on design value – 0 Upper limit on design value – ELV ELV – largest magnitude possible for a hydrologic event at a given location, based on the best available hydrologic information. – Length of record – Reliability of information – Accuracy of analysis Probable Maximum Precipitation (PMP) / Probable Maximum Flood (PMF)

6

7 TxDOT Recommendations

8 Hydrologic design level Hydrologic design level – magnitude of the hydrologic event to be considered for the design or a structure or project. Three approaches for determining design level – Empirical/probabilistic – Risk analysis – Hydroeconomic analysis

9 Empirical/Probabilitic P(most extreme event of last N years will be exceeded once in next n years) P(largest flood of last N years will be exceeded in n=N years) = 0.5 Drought lasting m years is worst in N year record. What is the probability that a worse drought will occur in next n years? – # sequences of length m in N years = N-m+1 – # sequences of length m in n years = n-m+1

10 Example If the critical drought of the record, as determined from 40 yrs of data, lasted 5 yrs, what is the chance that a more severe drought will occur during the next 20 yrs? Solution: N = 40, m = 5 and n = 20

11 Risk Analysis Uncertainty in hydrology – Inherent - stochastic nature of hydrologic phenomena – Model – approximations in equations – Parameter – estimation of coefficients in equations Consideration of Risk – Structure may fail if event exceeds T–year design magnitude – R = P(event occurs at least once in n years) Natural inherent risk of failure

12 Example Expected life of culvert = 10 yrs Acceptable risk of 10 % for the culvert capacity Find the design return period What is the chance that the culvert designed for an event of 95 yr return period will not have its capacity exceeded for 50 yrs? What is the chance that the culvert designed for an event of 95 yr return period will not have its capacity exceeded for 50 yrs? The risk associated with failure of culvert when the flow exceed 95 yr flood in the next 95 years is: The chance that the capacity will not be exceeded during the next 50 yrs is = 0.59

13 Hydroeconomic Analysis Probability distribution of hydrologic event and damage associated with its occurrence are known As the design period increases, capital cost increases, but the cost associated with expected damages decreases. In hydroeconomic analysis, find return period that has minimum total (capital + damage) cost.

14

Beargrass Creek Case Study Description of the Study Area Hydrology & Hydraulics Economic Analysis Project Planning Assessment of the Risk Based Analysis Methodology From “Risk Analysis and Uncertainty in Flood Damage Reduction Studies”, NRC Report:

Beargrass Creek Study Area North Fork Middle Fork South Fork Buechel Br Ohio River 61 mi 2 Drainage Area

Levee on the Ohio River

Pump Station at the Levee (Capacity 7800 cfs!)

Concrete-Lined Channel

Detention Pond Inlet Weir

Beargrass Creek at the Detention Pond Pond Outlet Pipe

Buechel Branch (2.2 miles) South Fork Beargrass Creek (12 miles) Damage Reaches 9 Example Reach SF-9

Beargrass Creek Case Study Description of the Study Area Hydrology & Hydraulics Economic Analysis Project Planning Assessment of the Risk Based Analysis Methodology

Flood Frequency Curve (SF-9) Separate curve for each reach and each plan

Uncertainty in Frequency Curve Reach SF-9, Without Plan Conditions ProbMean (cfs) Mean +2 SD Mean -2 SD Log 10 (SD)

Buechel Branch (61 cross-sects) South Fork Beargrass Creek (202 cross-sects) Water Surface Profiles 9

Uncertainty in Stage-Discharge SD= 0.5 ft at 100 yr flow Constant Reduces prop. to depth

Beargrass Creek Case Study Description of the Study Area Hydrology & Hydraulics Economic Analysis Project Planning Assessment of the Risk Based Analysis Methodology

Computation of Expected Annual Damage (EAD) Stage (H) Discharge (Q) Exceedance Probability (p) Discharge (Q) Stage (H) Damage (D) Exceedance Probability (p) Damage (D)

Damage Categories Single-family residential Multi-family residential Commercial buildings Public buildings Automobiles Cemeteries Traffic disruption Utilities

p=0.999 p=0.1 p=0.01 p=0.002 Structures

Index Location Each damage reach has an index location All structures are assumed to exist there First floor elevation adjusted to reflect the change in location within the reach Rm Rm Rm Index for SF-9 Invert p=0.01 p=0.1 p=0.5

Building Damage Value of the structure, V Value of the contents, C = kV k=V/C, contents to value ratio (~40%) Damage is a function of depth of flooding, expressed as ratio,r(h), of value First Floor Elevation h Depth, hr 1 (h)r 2 (h) 3ft27%35% 6ft40%45%

Uncertainty in Building Damage Value of structure, – SD=10% of V for residential – Commercial distribution described by Value of contents (SD of k in C=kV) Uncertainty in first floor elevation, SD=0.2ft Uncertainty in damage ratios, r(h) First Floor Elevation h

Stage-Damage Curve Multi-family Residential, Reach SF-9

Stage-Damage Curves Each structure is treated individually Stage-damage curve with uncertainty is produced for each damage category for each reach Added together to give the total stage- damage curve for the reach(?)

Beargrass Creek Case Study Description of the Study Area Hydrology & Hydraulics Economic Analysis Project Planning Assessment of the Risk Based Analysis Methodology

Planning Team Three key people: – Planner: formulates project alternatives, works with local sponsor – Hydraulic Engineer: determines discharge and stage data – Economist: estimates damage, costs, benefits and does the risk analysis

Planning Methodology Identify potential project components (detention ponds, levees, …) – 22 initially proposed, 11 on Beargrass Creek, and 11 on Buechel Branch Evaluate them all individually to see if net benefits are positive – 8 components on Buechel Branch eliminated Combine components into plans, incrementally – 10 components in NED plan: 8 detention ponds, 1 floodwall, 1 channel improvement

Buechel Branch Three Plan Development Reaches

Risk of Flooding Establish a target stage at each damage reach index point Find annual probability of exceeding that stage Find reliability of passing design floods Target Stage

Assessment of Engineering Risk Conditional probability – Assumes a particular flood severity Annual probability – Integrates over all flood severities Risk measures actually used – Annual exceedance probability – Conditional nonexceedance probability Target Stage H F(h) 0 1 Nonexceedance probability Exceedance probability

Computation of Engineering Risk Measures from the Stage-Frequency Curve Annual exceedance probability – Find p e for target stage at each Monte Carlo replicate – Get expected value and median of p e values over all simulations – Get long term risk as 1-(1-p e ) n Conditional nonexceedance probability –Find H* for given p* at each replicate –Find % of replicates for which H* < Target stage Q Q* f 2 (H|Q) H* p f 1 (Q|p) p* Q* H p f 3 (H|p) p* H* H pepe Target Stage Q

Beargrass Creek Case Study Description of the Study Area Hydrology & Hydraulics Economic Analysis Project Planning Assessment of the Risk Based Analysis Methodology

Overall Assessment The core methodology is solid and is an advance in engineering practice of flood risk assessment Focus is completely on damage reaches considered as statistically independent entities Whole project risk and 25%,50%,75% damage values cannot be built up this way Can specification of standard deviations of analysis variables be improved?

Beargrass Creek 100 year Flood Plain Map Middle Fork South Fork

Spatial Subdivision of the Region Spatial UnitUsed for Whole River Expected Annual Damage (EAD), Benefit-Cost analysis 3 Main River ReachesIncremental analysis to get NED plan 22 Damage Reaches Basic unit for analysis using HEC-FDA 263 Hydraulic Cross- sections Water surface elevation profile computation 2150 Structures Structure inventory

Whole Project Risk Assessment Take a flood of severity, p, and integrate the damage along the reach – Without any plan (o) – With a plan (w) – Benefit of plan is B = D o - D w Randomize the flood discharge and stage for the whole project rather than for each reach Compute project-based damage values for each randomization and use them to get B 25, B 75 values