Next Generation Internet in the Netherlands Kees Neggers Managing Director SURFnet NORDUnet2000 Helsinki 29 September 2000.

Slides:



Advertisements
Similar presentations
Regulation Policy in the Info- Communications Technology Spheres in Russia Vladimir Efimushkin, Ph.D. Director for R&D, ZNIIS, Moscow SOIS Meeting in Riga,
Advertisements

1 UNIT I (Contd..) High-Speed LANs. 2 Introduction Fast Ethernet and Gigabit Ethernet Fast Ethernet and Gigabit Ethernet Fibre Channel Fibre Channel High-speed.
Page 1 April Visions and business opportunities for wireless and mobile communications.
SURFnets connections to StarLight Erik-Jan Bos Manager Network Services SURFnet STAR TAP SM INET 2001 Annual Meeting Stockholm, Sweden - June 5th, 2001.
University of Illinois at Chicago The Future of STAR TAP: Enabling e-Science Research Thomas A. DeFanti Principal Investigator, STAR TAP Director, Electronic.
University of Illinois at Chicago Annual Update Thomas A. DeFanti Principal Investigator, STAR TAP Director, Electronic Visualization Laboratory.
Technology Directions for IP Infrastructure GH 3/7/00.
1 APAN-China update Contents l Research and Education Networks in China l CERNET Background and Update l Peer connectivity with other R+E.
IPv6 and CNGI in China Jianping WU July 6, Contents What is the next generation Internet we needed IPv6 and its development CERNET update Next Generation.
1 Optical network CERNET's experience and prospective Xing Li, Congxiao Bao
1 IPv6 Development in China Xing Li Outline l A brief history l Experience l CNGI project l CERNET2 design.
National Computerization Agency (NCA) Future of KOREN/APII October 31, 2003 Byun, Sang-Ick / NCA
Nordic Networks Peter Villemoes 20th NORDUnet Networking Conference April 2002 Copenhagen.
Nordic research networks Peter Villemoes NORDUnet A/S NORDUnet 2000 Helsinki September 2000.
© Otaverkko Oy 8/2000 MediaPoli - gigabit piloting environment Tuomo Karhapää Network Manager Otaverkko Oy
HD Networks in Europe and the World GÉANT Howard Davies DANTE NORDUnet 2000 Conference.
Nortel Proprietary Information 2 The Impact of the World Wide Web on Carrier Networks – an Historic Opportunity Geoff Hall Chief Technology Officer, EMEA.
Jorge Gasós Grid Technologies Unit European Commission The EU e Infrastructures Programme Workshop, Beijing, June 2005.
INFSO/F3 1 The TEN-Telecom Programme Jose Soler INFSO/F3, EC TEN-TELECOM Information Day.
1 Experiences in the Netherlands with Strategic Research Agendas ir. Willem J. Zwalve November 2005.
Current thinking. Subject to change. October 2011 BENEFITS OF BUILDING AN IN-HOUSE CONTENT DISTRIBUTION NETWORK (CDN)
Hoogwaardig internet voor hoger onderwijs en onderzoek WELKOM! SNE-master visit SURFnet Utrecht 5 april 2006.
1 ALL EPSRC VISITS EPSRC plans and priorities. 2 DIGITAL ECONOMY EPSRC lead AHRC ESRC MRC ENERGY EPSRC lead BBSRC ESRC NERC STFC NANOSCIENCE THROUGH ENGINEERING.
CNGI: China Next Generation Internet Jianping WU CERNET and Tsinghua Univ. Nov. 30, 2004.
1 Office of Electronic Communications Inventory of Telecommunications Infrastructure in Poland Article 29 of Broadband Act.
High Performance Internet Service at the University of Michigan December 1999 Internet2 These slides are available from the U-M I2 Web page:
ONE PLANET ONE NETWORK A MILLION POSSIBILITIES Barry Joseph Director, Offer and Product Management.
Presentation for TERENA Networking Conference 2000 Peter Valkenburg SURFnet High-Speed Access in GigaPort.
High Performance Internet Service at the University of Michigan April 2000 Internet2 These slides are available from the U-M I2 Web page:
1 In VINI Veritas: Realistic and Controlled Network Experimentation Jennifer Rexford with Andy Bavier, Nick Feamster, Mark Huang, and Larry Peterson
RIT Campus Data Network. General Network Statistics Over 23,000 wired outlets Over 14,500 active switched ethernet ports > 250 network closets > 1,000.
System Architecture for Billing of Multi- Player Games in a Wireless Environment using GSM/UMTS and WLAN Services Femi Adeyemo 11/21/02.
IT Broadband Connectivity Infrastructure Projects Projects Status.
Dutch Tier 1 SARA/NIKHEF & SURFnet Erik-Jan Bos Director of Network Services SURFnet, The Netherlands To/T1 networking meeting, Geneva, Switzerland July.
SURFnet5, experiences in building the next generation Internet in The Netherlands Erik-Jan Bos Washington, DC, October 2000.
GLIF Engineering (TEC) Working Group & SURFnet6 Blue Print Erik-Jan Bos Director of Network Services, SURFnet I2 Fall meeting, Austin, TX, USA September.
1 © EJB SURFnet 1999 Next Generation Internet in The Netherlands Erik-Jan Bos SURFnet bv Eugene, OR - NANOG16.
Connect. Communicate. Collaborate Alcatel’s GÉANT2 Partnership The Convergent Solution in Practice Stefano Lorenzi Senior Vice President, Alcatel Optical.
1. 2 Telecommunication networks and technologies INTERNATIONAL AND BACKBONE NETWORKS Transmission Networks Fiber optic communication lines – PDH,SDH,
June 4, 2004 Telecities Ronneby Kenniswijk Learning experiences from a broadband experiment Robert Elbrink City of Eindhoven.
MikroTik Experience Overview - Wireless ISP Solutions
United Telecommunication Services Michael Gaari Manager Network Provisioning UTS
The need for further standards and technical developments Brian Moore ITU-T Study Group 13 Chairman Lucent Technologies.
Frank Biemans February GigaPort-Applications Ambition Organisation GigaPort-Network GigaPort-Applications –Knowledge acquisition –Pilots –Knowledge.
The new website of SURFnet TF-PR meeting Vienna, 17 September 2004 Paulien Rinsema Communication, Information and Support.
LambdaGRID the NREN (r)Evolution Kees Neggers Managing Director SURFnet Reykjavik, 26 August 2003.
Kees Neggers SURFnet SC2003 Phoenix, 20 November 2003.
1 for students and employees Tom Koppen director computing center TERENA Networking Conference 2000 Lisbon, May.
High-quality Internet for higher education and research GigaPort  Overview SURFnet6 Niels den Otter SURFnet EVN-NREN Meeting Amsterdam October 12, 2005.
The Jordanian Universities Network Yousef Torman Executive Director TNC th May, 2006 Catania, Italy.
GigaPort NG Network SURFnet6 and NetherLight Kees Neggers SURFnet Amsterdam October 12, 2004.
GLIF Infrastructure Kees Neggers SURFnet SC2004 Pittsburgh, PA 12 November 2004.
SURFnet6 Hybrid Optical and Packet Switching Infrastructure Kees Neggers Internet2 International Task Force Arlington, 19 April 2004.
SURFnet. We make innovation work0. 1 State-of-the-art Network IT InnovationLicensing.
October 2000 © The JNT Association JISC / UKERNA Initiative Internet2 Collaborative Programme in the UK Rina Samani.
Erik Radius Manager Network Services SURFnet, The Netherlands Joint Techs Workshop Columbus, OH - July 20, 2004 GigaPort Next Generation Network & SURFnet6.
Illinois Century Network Illinois Broadband Opportunity Partnership – East Central Project.
1 © 2004 Cisco Systems, Inc. All rights reserved. Cisco Research & Development and China 2 December 2004 Christopher Buja, Deputy Director Academic Research.
GigaPort NG Network SURFnet6 and NetherLight Erik-Jan Bos Director of Network Services, SURFnet GDB Meeting, SARA&NIKHEF, Amsterdam October 13, 2004.
VeriFone Connect. VeriFone Connect – Fixed and Wireless VeriFone Connect powered by Europacom provides secure managed connectivity for your transactions.
October 2000GRNET GRNET Greek Research & Technology Network Tryfon K. Chiotis Dimitrios K. Kalogeras.
Sectoral Operational Programme “INCREASE OF ECONOMIC COMPETITIVENESS” October 2005 MINISTRY OF ECONOMY AND TRADE.
DutchGrid KNMI KUN Delft Leiden VU ASTRON WCW Utrecht Telin Amsterdam Many organizations in the Netherlands are very active in Grid usage and development,
SURFnet6: the Dutch hybrid network initiative
Module 2: Configure Network Intrusion Detection and Prevention
The SURFnet Project Bram Peeters, Manager Network Services
The Role of Europe in Developing Future Internet Technologies, EC Initiatives
SURFnet6 Hybrid Optical and Packet Switching Infrastructure
Computer Networking A computer network, often simply referred to as a network, is a collection of computers and devices connected by communications channels.
Presentation transcript:

Next Generation Internet in the Netherlands Kees Neggers Managing Director SURFnet NORDUnet2000 Helsinki 29 September 2000

Topics Introduction GigaPort SURFnet5 International Connectivity Access Projects Applications Closing remarks

SURFnet Provides the Dutch National Research Network Not for profit company 200 connected organisations, users Turnover (1999): 20 M Infrastructure services: –innovation paid for by the government –cost effective exploitation for higher education and research

SURFnet Network - evolution Access capacity

Start of GigaPort initiative SURFnet realised that a new infrastructure project was needed the required funds couldnt be delivered solely by the Ministry of Education, Culture and Science Higher Education and Research are drivers for network innovation the project would have a broader economic value

Opinion article in newspaper (August) Parliament motion: Invest also in knowledge infrastructure (November) Submission of request for grant (June) Submission of business plan (September) Grant of 71 M (October) Start of the project (April) History of the GigaPort initiative 1999

GigaPort objectives Accelerate innovation using NGI technologies for: – Business – Research and Education – Healthcare Offer: – State-of-the-art research network as testbed – Know-how regarding NGI applications – Access to innovative user group (students) – Contacts to form consortia

GigaPort funding Source Ministry for Economic Affairs 62 9 International connectivity Destination 100% = 71 mln Ministry for Education, Science and Culture Management Applications knowledge generation Access projects Research network

GigaPort projects and organisation

SURFnet AUP Full service for Research and Higher Education Institutes All others, including industry, test and development activities for advanced applications

GigaPort-Network target for 2002 National Research Network100 times faster than SURFnet4 (partnership)20 Gbit/s access, minimum 15 PoPs IP over optical transmission infrastructure New IP features, e.g. QoS Access projectsPilots for wired and wireless access (multiple partnerships)(GPRS, xDSL, Fiber to the Dormitory, Gigabit Ethernet Cable modems, UMTS, ) International connectivityAMS-IX: 5 Gbit/s (procurement)Europe: 2,5 Gbit/s Rest of world: 2.5 Gbit/s

External Connectivity Organisations Users Intercontinental National Research Infrastructure SURFnet4 / SURFnet5 Access IP over wireless LAN Access IP over GSM, UMTS Access IP over cable, xDSL,Fiber Europe Amsterdam Internet Exchange Amsterdam Internet Exchange Overview GigaPort Network

SURFnet4 topology

Specifications of SURFnet5 100 times as fast as SURFnet4 IP over optical transmission infrastructure 80 Gbit/s backbone - 20 Gbit/s access Introduction of new IP features, e.g. –Authentication and Classes of Service –IPsec, Multicasting and IPv6 –MPLS, VPN and Traffic Engineering In partnership with industry

SURFnet5 rollout 31 December 1999, contract signed with Telfort and Cisco Systems Summer 2000 start pilot network 4 GSR+ nodes, 2.5 Gbit/s links January 2001 start (pre)production network 15 GSR+ nodes, DWDM, 10 Gbit/s links January 2001, Collapsed backbone, 4 GSR Upgrade collapsed backbone

SURFnet5: Pilot network Four-node GSR+ POS-framing Status: up-and-running Available until November 2000 for testing: –Performance tests using GIGAcluster –MPLS Traffic Engineering plus Fast ReRoute –New multicast features –IPv6

SURFnet5: Pilot network (schematic) SURFnet4 Enschede Delft Eindhoven Amsterdam POS framing 2.5 Gbit/s

SURFnet5: Pre-production network Collapsed backbone with: –2 core sites (each 2 GSR+s interconnected at 10G POS) –15 concentrator sites (each 1 GSR+ connected to both core sites at 10G POS) Status: Currently being built Available end of 4Q 2000 (except one concentrator) Selected customers connected to SURFnet4 *and* SURFnet5

Hempoint SP (SARA) Concentrator (15x) FRR POS framing at 10 Gbit/s Telforts DWDM Network: Always two separate routes SURFnet5: Pre-prod network (schematic) POS framing at 10 Gbit/s

SURFnet5 Production network Putting the pre-production network into production Planning: Summer 2001 Start migrating all 200+ customers to SURFnet5 Upgrade of the 4 core routers to ? Available until the end of 2005

SURFnet5 PoPs

SURFnet5 access capacity Access capacity 100 Gbit/s 1 Gbit/s 10 Mbit/s 100 Mbit/s 10 Gbit/s Mbit/s 2,5 Gbit/s 20 Gbit/s SURFnet5 10 Gbit/s 1.0 Gbit/s SURFnet4

GigaPort External connectivity Global Internet Connectivity 622 Mbit/s –two 155 Mbit/s connections from Teleglobe in New York –two 155 Mbit/s connections from Level 3 in Amsterdam 155 Mbit/s to Abilene in NY, 155 Mbit/s to STAR TAP 155 Mbit/s to TEN-155, 622 Mbit/s in October Gigabit Ethernet connection with the AMS-IX CfP in preparation for: 2.5 Gbps Global Internet Connectivity in Amsterdam Partnership for Trans-Atlantic Lambdas

GigaPort Network Access Broadband access anytime anywere target 2002: 20% of students >2 Mbit/s at home Pilots with access technologies GPRS pilot with Libertel (Vodafone) and Ericsson. Two xDSL pilots with four Universities –Eager Telecom in Twente –Cistron in Amsterdam and Delft Technology Assesment Cable TV, no pilot yet Fiber to the Dormitory, Evaluation of bids Gigabit Ethernet, Call in preparation

Example Students University Twente

GigaPort-Applications programme Pilot projects with partners, e.g. (financed by partners) Video over IP (IBM, NOB, SURFnet) Online services platform (Lucent, KPN, TNO) Billing and security (Ericsson, KPN) Teleconsulting (Rotterdam hospital, Lucent, Siemens) Virtual Port (Rotterdam Port, ABN AMRO, CMG, ECT) Knowledge generation (financed by GP-A) Working apart together Multimedia management Electronic transactions Mobile services Middleware Technology push Market pull

Generic Services Authentication (chipcards, TTP) LDAP and Directory Enabled networking Encryption (IPsec) Real-time multimedia conferencing Multiparty virtual reality communication

SURFworks Conferencing Streaming Video Chipcard based transaction environment SURFnet Video Portal

Conclusion: essential elements High ambition level, use of leading edge technology, not just copying the USA Broadbased commitment from several Ministries and the Business Community Armslength Project Organisation with flying start based on existing organisations Communicate: internationally, nationaly and per stakeholders group

Main challenges Address high costs of last mile access to network Reinforce role of universities and research institutes as accelerators Accelerate rate of experimentation by business Achieve shared sense of urgency and opportunity