Max-Planck-Institut für Gravitationsphysik (Albert-Einstein-Institut) Institut für Atom- und Molekülphysik Detector Characterization of GEO 600 during.

Slides:



Advertisements
Similar presentations
Max-Planck-Institut für Gravitationsphysik (Albert-Einstein-Institut) HOMODYNE AND HETERODYNE READOUT OF A SIGNAL- RECYCLED GRAVITATIONAL WAVE DETECTOR.
Advertisements

Dual Recycling for GEO 600 Andreas Freise, Hartmut Grote Institut für Atom- und Molekülphysik Universität Hannover Max-Planck-Institut für Gravitationsphysik.
Stefan Hild S4 Data Workshop, Hannover, May 2005 Title 1 kHz Glitches in S4 Max-Planck-Institut für Gravitationsphysik (Albert-Einstein-Institut)
Stefan Hild Ilias WG1 meeting, Hannover, April 2005 Title Hot topic: 1 kHz Glitches in S4 Max-Planck-Institut für Gravitationsphysik (Albert-Einstein-Institut)
Status of the Virgo Commissioning G.Losurdo – INFN Firenze/Urbino for the Virgo Collaboration.
Laser Interferometer Gravitational-wave Detectors: Advancing toward a Global Network Stan Whitcomb LIGO/Caltech ICGC, Goa, 18 December 2011 LIGO-G v1.
Cascina, January 25th, Coupling of the IMC length noise into the recombined ITF output Raffaele Flaminio EGO and CNRS/IN2P3 Summary - Recombined.
Calibration of the gravitational wave signal in the LIGO detectors Gabriela Gonzalez (LSU), Mike Landry (LIGO-LHO), Patrick Sutton (PSU) with the calibration.
Cascina, January 24, 2005 Status of GEO600 Joshua Smith for the GEO600 team.
1 Virgo commissioning status M.Barsuglia LAL Orsay.
LIGO-G W Proposed LHO Commissioning Activities in May 02 Fred Raab 29 Apr 02.
1 Virgo Commissioning progress and plans ILIAS, Jan 23 rd 2007 Matteo Barsuglia on behalf of the Commissioning Team.
VSR1 summary - post VSR1 Commissioning plans E. Tournefier (LAPP-CNRS) LSC-Virgo meeting Oct 22 nd, 2007.
rd ILIAS-GW annual general meeting 1 VIRGO Commissioning progress J. Marque (EGO)
Stefan Hild S4 Data Workshop, Hannover, Mai 2005 Title MU3 glitches Max-Planck-Institut für Gravitationsphysik (Albert-Einstein-Institut)
Q09/2001 The GEO 600 Laser System LIGO-G Z V. Quetschke°, M. Kirchner°, I.Zawischa*, M. Brendel*, C. Fallnich*, S. Nagano +, B. Willke° +, K.
Towards dual recycling with the aid of time and frequency domain simulations M. Malec for the GEO 600 team Max-Planck-Institut für Gravitationsphysik Albert-Einstein-Institut.
GEO600 Harald Lück Ruthe, Worldwide Interferometer Network.
Stefan Hild 1ILIAS WG1 meeting, Cascina, November 2006 Comparison of tuned and detuned Signal-Recycling Stefan Hild for the GEO-team.
Stefan Hild 1Ilias WG1 meeting, Sep 2005, Perugia Title GEO 600 Commissioning progress Max-Planck-Institut für Gravitationsphysik (Albert-Einstein-Institut)
LIGO-G Z NSF Review LIGO Scientific Collaboration - University of Michigan 1 LSC Participation in Initial LIGO Detector Characterization.
LIGO-G Z Detector characterization for LIGO burst searches Shourov K. Chatterji for the LIGO Scientific Collaboration 10 th Gravitational Wave.
Joshua Smith December 2003 Detector Characterization of Dual-Recycled GEO600 Joshua Smith for the GEO600 team.
The GEO 600 Detector Andreas Freise for the GEO 600 Team Max-Planck-Institute for Gravitational Physics University of Hannover May 20, 2002.
Interferometer Control Matt Evans …talk mostly taken from…
March 17, 2008LSC-Virgo meeting1/12 Virgo Status B. Mours.
GEO‘s experience with Signal Recycling Harald Lück Perugia,
Virgo Commissioning update Gabriele Vajente for the Virgo Collaboration LSC/VIRGO Meeting – MIT 2007, July LIGO-G Z.
LIGO-G Z Peter Shawhan, for the LIGO Scientific Collaboration APS Meeting April 25, 2006 Search for Gravitational Wave Bursts in Data from the.
GEO600 Detector Status Harald Lück Max-Planck Institut für Gravitationsphysik Institut für Atom- und Molekülphysik, Uni Hannover.
Squeezed light and GEO600 Simon Chelkowski LSC Meeting, Hannover.
1 Virgo commissioning: Next steps December 12 st 2005 Hannover, ILIAS-GWA WG1 Matteo Barsuglia, LAL/CNRS.
Stefan Hild 1GWDAW 10, Brownsville, December 2005 Status of GEO 600 Stefan Hild, AEI Hannover for the GEO-team.
Harald Lückfor the GEO600 Comissioning team 1ILIAS Meeting, Palma, Oct Title GEO 600 Commissioning Status Based on a talk of Stefan Hild for the.
G D Commissioning Progress and Plans Hanford Observatory LSC Meeting, March 21, 2005 Stefan Ballmer.
GWDAW11, Postdam 18th-21th December 2006 E. Cuoco, on behalf of Virgo collaboration 1 “Data quality studies for burst analysis of Virgo data acquired during.
1 The Virgo noise budget Romain Gouaty For the Virgo collaboration GWADW 2006, Isola d’Elba.
Status of GEO600 Benno Willke for the GEO600 team Aspen Meeting Aspen CO, January 2005 LIGO-G Z.
GEO600 Status Update Harald Lück Hannover, April 2005.
Abstract The Hannover Thermal Noise Experiment V. Leonhardt, L. Ribichini, H. Lück and K. Danzmann Max-Planck- Institut für Gravitationsphysik We measure.
Status of coalescing binaries search activities in Virgo GWDAW 11 Status of coalescing binaries search activities in Virgo GWDAW Dec 2006 Leone.
Preparing GEO600 for Gravitational Wave astronomy (A status report) Martin Hewitson, AEI Hannover for GEO600.
1 LESSONS FROM VIRGO+ May 17th 2010 E. Calloni for the Virgo collaboration.
LIGO-G D 1 Status of Detector Commissioning LSC Meeting, March 2001 Nergis Mavalvala California Institute of Technology.
Dual Recycling in GEO 600 H. Grote, A. Freise, M. Malec for the GEO600 team Institut für Atom- und Molekülphysik University of Hannover Max-Planck-Institut.
1 Virgo Commissioning Status WG1 meeting Potsdam, 21 st July 2006.
Stefan Hild 111th WG1 meeting, Hannover, January 2007 DC-Readout for GEO Stefan Hild for the GEO-team.
Joshua Smith, Elba, Italy Elba, Italy Joshua Smith for the GEO 600 team Picture of GEO in stormy weather?? Or pics of tractors with.
May 29, 2006 GWADW, Elba, May 27 - June 21 LIGO-G0200XX-00-M Data Quality Monitoring at LIGO John Zweizig LIGO / Caltech.
Status of Virgo GWDAW12 Status of Virgo GWDAW Dec Leone B. Bosi INFN and University of Perugia (Italy) On behalf of the Virgo Collaboration.
1 Locking in Virgo Matteo Barsuglia ILIAS, Cascina, July 7 th 2004.
LIGO-G D Commissioning at Hanford Stan Whitcomb Program Advisory Committee 12 December 2000 LIGO Livingston Observatory.
Caltech, February 12th1 Virgo central interferometer: commissioning and engineering runs Matteo Barsuglia Laboratoire de l’Accelerateur Lineaire, Orsay.
Joshua Smith August Identifying and eliminating limiting noise sources of GEO600 LSC Meeting, Hanford WA, August `04 Joshua Smith for the GEO team.
Status of GEO600 Benno Willke for the GEO600 team ESF Exploratory Workshop Perugia, September 2005.
LIGO-G Z Report on E3/E4 Lock Losses K. Riles - University of Michigan 1 Report on E3/E4 Lock Losses David Chin, Dick Gustafson Keith.
Stefan Hild 1GWADW, Elba, May 2006 Experience with Signal- Recycling in GEO 600 Stefan Hild, AEI Hannover for the GEO-team.
The Proposed Holographic Noise Experiment Rainer Weiss, MIT On behalf of the proposing group Fermi Lab Proposal Review November 3, 2009.
Edwige Tournefier for the Virgo Collaboration The status of Virgo.
Martin Hewitson and the GEO team Measuring gravitational waves with GEO600.
Summary of iKAGRA Test Run Apr 11-25, 2016
Status of Virgo GWDAW Dec 13-16
Homodyne readout of an interferometer with Signal Recycling
Commissioning progress Stefan Hild Ilias WG1 meeting, Sep 2005
Summary of iKAGRA Test Run Mar 25-31, 2016
Preparing GEO600 for Gravitational Wave astronomy (A status report)
Status at the Prague meeting
LIGO Scientific Collaboration - University of Michigan
Talk prepared by Stefan Hild AEI Hannover for the GEO-team
Homodyne detection: understanding the laser noise amplitude transfer function Jérôme Degallaix Ilias meeting – June 2007.
Presentation transcript:

Max-Planck-Institut für Gravitationsphysik (Albert-Einstein-Institut) Institut für Atom- und Molekülphysik Detector Characterization of GEO 600 during the S4 science run S. Hild for the GEO 600 team Introduction  GEO 600 participated in the LSC S4 science run, which took place between February 22 nd and March 24 th  During these 708 hours a duty cycle in nominal science mode of 96.6 % was achieved.  Many monitors for detector characterization were developed and used for commissioning before S4 as well as for online detector characterization during the science run. Typical sensitivity Detector Characterization Tools Lock-loss investigations Data Quality Every loss of lock during S4 was analysed ! Signals used for lock-loss investigations: Logitudinal error points and feedback points of modecleaners, Power Recycling, Signal Recycling and differential Michelson. (whitened and unwhitened signals) Autoalignment error points and feedback points of modecleaners, Power Recycling, Signal Recycling and differential Michelson. Laser power stabilisation loop Light powers at various points of the interferometer Environmental monitors For future: Monitoring of important RF-modulation signals Instrumental duty cycle = % Longest lock > 52 hours Instrumental duty cycle for locks longer than 10 hours = % Usually used for Burst analysis: lock segments > 300 seconds Usually used for Inspiral analysis: lock segments > 2048 seconds h(t): derived from two quadratures of MI diff. EP diff. calibration: estimation of optical gain + MID loop gain (for online calibration) noise proj.: calibration lines for various online noise projections violin mode: fiber modes from the monolithic suspension stage MC turbo: turbo pump frequency (822 Hz) Mains: 50 Hz and multiples from mains The signal recycling mirror was tuned for a peak response at 1 kHz. Sensitivity corresponds to range of about 0.4 MPc for BH-BH inspirals (about 0.25 MPc for BH-NS and NS-NS). Duty Cycle Reason for locklossquantity Tractor passing east or north building35 High frequency glitches in power-stab loop25 Maintenance Hz oscillation in MID-AA-Tilt16 Stormy weather14 Earthquakes5 12 Hz oscillation in MID-long-loop5 Coupled ringing in SR-AA and MID-long3 Modecleaner 1 oscillation 30 Hz2 Horse galloping along north building2 End of range1 Unlear4 Total134 Exemplary lock loss investigation: 2.5 Hz oscillation MID-AA-Tilt 1 kHz SeismoMon IFOMonHspecmon Online h(t), with min/max per frequency bin Spectra of seismic (9 degrees of freedom) IFO channels potentially coupling to h(t) There was one stormy day in S4: Wind shakes the walls of the buildings  causes acoustic noise inside the buildings  movement of walls couples via foundation to vacuum system Large misalignment (Michelson auto- alignment is gain pendulum resonance frequencies) Non-optimal spatial overlap of beams at the beamsplitter Increased light level at the dark port and on detection photodiode Saturation of MI diff EP in electronics Windy conditions 2 Volts = Saturation Found a perfect correlation between BLRMS (989 to 999 Hz) of h(t) and the rate of glitches with a central frequency between 700 and 2000 Hz. Some properties of the glitches (derived from HACRmon): glitches cause excess noise between 400 and 1300 Hz average duration of about 20 ms average bandwidth of about 200 Hz Glitch rate varies from nearly 0 to 4000 glitches per 15 minutes GEO REPORTS Min/max spectrum of h(t) 15 BLRMS of h(t) Inspiral monitor Spectrogram of h(t) Data quality Chi 2 Calibration parameters Bursts (HACRmon): Lines (Linemon): Sensitivity: Calibration Time frequency distribution SNR distribution Duration Bandwidth Line cataloguing Harmonic identification Sideband identification Data Quality Flags: 1. Chi 2 Derived from calibration process (compares model and measurement of the optical gain at calibration line frequencies) Used to flag MU3-Glitches 2. Saturation of detection signal Used to flag bad times due to stormy weather 3. Seismic flag (planned) Flag for high level of local seismic noise (tractors passing buildings) MU3-Glitches Windy day Tractor activities Chi 2 cut HACRmon 1kHz chi 2 Example: MU3-Glitches (Problem was fixed during S4) Glitchrate (HACRmon) Strain RMS Glitchrate (HACRmon) Chi 2 : derived from calibration process a.u. Voltage [V] [m/s]