Paolo Rumerio, University of Maryland On Behalf of the CMS Collaboration The LHC and Dark Matter Ann Arbor, Michigan, January 6 th -9 th, 2009 Status of.

Slides:



Advertisements
Similar presentations
Use of G EANT 4 in CMS AIHENP’99 Crete, April 1999 Véronique Lefébure CERN EP/CMC.
Advertisements

The CMS Detector Paoti Chang National Taiwan University
Guoming CHEN The Capability of CMS Detector Chen Guoming IHEP, CAS , Beijing.
First CMS Results with LHC BeamToyoko Orimoto, Caltech 1 First CMS Results with LHC Beam Toyoko Orimoto California Institute of Technology On behalf of.
LHCf: a LHC Detector for Astroparticle Physics LHCf: a LHC Detector for Astroparticle Physics Lorenzo Bonechi on behalf of the LHCf Collaboration * University.
Calorimeter1 Understanding the Performance of CMS Calorimeter Seema Sharma,TIFR (On behalf of CMS HCAL)
CMS ECAL Prompt Feedback Group Toyoko J. Orimoto, California Institute of Technology A Brief History: From GRUMM to First BeamThe Future of the ECAL PFG.
Status of the MICE SciFi Simulation Edward McKigney Imperial College London.
First CMS Results with LHC BeamToyoko Orimoto, Caltech 1 First CMS Results with LHC Beam Toyoko Orimoto California Institute of Technology On behalf of.
J. Leonard, U. Wisconsin 1 Commissioning the Trigger of the CMS Experiment at the CERN Large Hadron Collider Jessica L. Leonard Real-Time Conference Lisbon,
Introduction to Hadronic Final State Reconstruction in Collider Experiments Introduction to Hadronic Final State Reconstruction in Collider Experiments.
General Trigger Philosophy The definition of ROI’s is what allows, by transferring a moderate amount of information, to concentrate on improvements in.
ECAL TIMING. 20/04/092 Ratios’ Method Basics Position of pulse maximum parameterized using the ratio of two consecutive samples, i.e., R = A(t)/A(t+1)
Cosmic Rays Data Analysis with CMS-ECAL Mattia Fumagalli (Università di Milano Bicocca) CIAO!
1 CMS Tracker Alignment and Implications for Physics Performance Nhan Tran Johns Hopkins University CMS Collaboration SPLIT
Status of CMS and the road to first physics results Jordan Nash For the CMS Collaboration – ICFA Seminar – SLAC October 2008.
The Transverse detector is made of an array of 256 scintillating fibers coupled to Avalanche PhotoDiodes (APD). The small size of the fibers (5X5mm) results.
July CMS experiment at LHC Geoff Hall Imperial College London Geoff Hall.
Approved Plots from CMS First Beam Runs 2-October-2008.
Toward Assessing HF with Beam Halo Muons & Beam-Gas Events …tuning HF when beam returns excerpts from US-CMS presentation 9/26/08 Michael Schmitt, NWU.
1 Perspectives for quarkonium production in CMS Carlos Lourenço, on behalf of CMSQWG 2008, Nara, Japan, December 2008.
CHEP06, Mumbai-India, Feb 2006V. Daniel Elvira 1 The CMS Simulation Validation Suite V. Daniel Elvira (Fermilab) for the CMS Collaboration.
Operation of the CMS Tracker at the Large Hadron Collider
Calibration of the CMS Electromagnetic Calorimeter with first LHC data
Design and development of micro-strip stacked module prototypes for tracking at S-LHC Motivations Tracking detectors at future hadron colliders will operate.
The CMS detector as compared to ATLAS CMS Detector Description –Inner detector and comparison with ATLAS –EM detector and comparison with ATLAS –Calorimetric.
The Status of the ATLAS Experiment Dr Alan Watson University of Birmingham on behalf of the ATLAS Collaboration.
Сессия Ученого Совета ОФВЭ 25 декабря 2008 Проект CMS в 2008 В.В.Сулимов.
All CMS 30 May07 TSV1 All CMS 3 30 May 2007 LHC machine CMS Progress Overall Schedule.
The Compact Muon Solenoid. What does CMS do? The Compact Muon Solenoid is a general purpose particle detector installed at point 5 of the Large Hadron.
D0 Status: 04/01-04/08 u Week integrated luminosity –1.7pb -1 delivered –1.5pb -1 utilized (88%) –1.1pb -1 global runs u Data collection s global data.
Jessica Leonard, U. Wisconsin, December 19, 2006 Preliminary Exam - 1 H->  Jessica Leonard University of Wisconsin - Madison Preliminary Examination.
SiPM Readback Noise Tagging & HCAL Calibration Dayton Thorpe July 8, 2010.
First CMS Results with LHC Beam
5-9 June 2006Erika Garutti - CALOR CALICE scintillator HCAL commissioning experience and test beam program Erika Garutti On behalf of the CALICE.
Measurement of the Charge Ratio of Cosmic Muons using CMS Data M. Aldaya, P. García-Abia (CIEMAT-Madrid) On behalf of the CMS Collaboration Sector 10 Sector.
1 DT Local Reconstruction on CRAFT data Plots for approval CMS- Run meeting, 26/6/09 U.Gasparini, INFN & Univ.Padova on behalf of DT community [ n.b.:
CHIPP meeting Appenberg, 24 Aug 2009 Preparation for LHC beam, Jeroen van Tilburg 1/15 Jeroen van Tilburg (Universität Zürich) LHCb: Preparation for LHC.
The Detector Performance Study for the Barrel Section of the ATLAS Semiconductor Tracker (SCT) with Cosmic Rays Yoshikazu Nagai (Univ. of Tsukuba) For.
H C A L 11 th International Conference on Advanced Technology and Particle Physics Villa Olmo (Como - Italy), October 5 - 9, 2009 THE PERFORMANCE OF THE.
Geant4 Tutorial, Oct28 th 2003V. Daniel Elvira Geant4 Simulation of the CMS 2002 Hcal Test Beam V. Daniel Elvira Geant4 Tutorial.
LHCf Detectors Sampling Calorimeter W 44 r.l, 1.6λ I Scintilator x 16 Layers Position Detector Scifi x 4 (Arm#1) Scilicon Tracker x 4(Arm#2) Detector size.
TeV muons: from data handling to new physics phenomena Vladimir Palichik JINR, Dubna NEC’2009 Varna, September 07-14, 2009.
TeV Muon Reconstruction Vladimir Palichik JINR, Dubna NEC’2007 Varna, September 10-17, 2007.
AEM, Sept Frank Chlebana (Fermilab) Status of the LHC and CMS Frank Chlebana (Fermilab) All Experimenter’s Meeting Sept
Introduction to Hadronic Final State Reconstruction in Collider Experiments Introduction to Hadronic Final State Reconstruction in Collider Experiments.
CMS Status & Commissioning Menu: 1 Recent Progress Commissioning Prior to and After First Beam Commissioning with first LHC Events Outlook Wolfgang Funk.
E+/e- Backgrounds at BEPCII/BESIII JIN Dapeng Aug. 22, 2011.
Real data in the Muon Spectrometer Bernardo RESENDE and a lot of other people not named here NIKHEF Jamboree, December 2008.
A. Parenti 1 RT 2007, Batavia IL The CMS Muon System and its Performance in the Cosmic Challenge RT2007 conference, Batavia IL, USA May 03, 2007 Andrea.
EPS HEP 2007 Manchester -- Thilo Pauly July The ATLAS Level-1 Trigger Overview and Status Report including Cosmic-Ray Commissioning Thilo.
Operation, performance and upgrade of the CMS Resistive Plate Chamber system at LHC Marcello Abbrescia Physics Department - University of Bari & INFN,
Roberta Arcidiacono Universita' & INFN Torino on behalf of the CMS collaboration DIS09 – April 2009 Status of CMS.
Approved Plots from CRAFT
Approved Plots from CMS Cosmic Runs (mostly CRUZET, some earlier)
Preparation of LHCb for data taking
DT Local Reconstruction on CRAFT data
The Compact Muon Solenoid Detector
CMS Tracker Alignment with Cosmic Data and Strategy at the Startup
5% The CMS all silicon tracker simulation
Preparation of the CLAS12 First Experiment Status and Time-Line
Project Presentations August 5th, 2004
Bringing the ATLAS Muon Spectrometer to Life with Cosmic Rays
Backgrounds using v7 Mask in 9 Si Layers at a Muon Higgs Factory
The LHCb Level 1 trigger LHC Symposium, October 27, 2001
Resistive Plate Chambers performance with Cosmic Rays
The CMS muon system performance
Contents First section: pion and proton misidentification probabilities as Loose or Tight Muons. Measurements using Jet-triggered data (from run).
Installation, Commissioning and Startup of ATLAS & CMS Experiments
Clustering-based Studies on the upgraded ITS of the Alice Experiment
Presentation transcript:

Paolo Rumerio, University of Maryland On Behalf of the CMS Collaboration The LHC and Dark Matter Ann Arbor, Michigan, January 6 th -9 th, 2009 Status of the CMS Detector

Overview Page 2 Paolo Rumerio, MarylandLHCDM, Ann Arbor, Jan 6 th - 9 th, 2009  Installation and Commissioning  Beam Days  Cosmic Run at Four Tesla  Winter Shutdown Activities

The CMS Detector Page 3 Paolo Rumerio, MarylandLHCDM, Ann Arbor, Jan 6 th - 9 th, 2009 ECAL Si Tracker 3.8T solenoid Muon chambers HCAL Iron yoke Pixel YB0 YE-1 Some detector component acronyms: Pixel: Barrel (BPix) and Endcap disks (FPix) Tracker: Inner Barrel (TIB), Inner Disks (TID), Outer Barrel (TOB), Endcaps (TEC) Electromagnetic Calorimeter: ECAL Barrel (EB) and ECAL Endcaps (EE) Hadronic Calorimeter: HCAL Barrel (HB), HCAL Endcap (HE), HCAL Forward (HF), HCAL Outer (HO) Muon Chambers: Drift Tubes (DT) in the barrel (also Muon Barrel - MB), Cathode Strip Chambers (CSC) in the endcaps (also Muon Endcaps - ME), Resistive Plate Chambers (RPC) in barrel end endcaps Magnetic field return yoke: Yoke Barrel (YB) and Yoke Endcaps (YE)

Lowering Barrel Wheels and Endcap Disks Page 4 Paolo Rumerio, MarylandLHCDM, Ann Arbor, Jan 6 th - 9 th, 2009  ……………..  ………..  ……………. Barrel wheels: Jan. - Oct Endcap disks: Jan. 07 – Jan. 08

Installing Detectors Inside the Magnet Page 5 Paolo Rumerio, MarylandLHCDM, Ann Arbor, Jan 6 th - 9 th, 2009  ……………..  ………..  ……………. Inserting HCAL barrel: Mar. 07 Installing ECAL Barrel: ended July 07 Inserting Silicon Strip Tracker: Dec 08. Cabling completed Mar. 08 YB0 After Cabling Dec. 07

Latest Installed Components Page 6 Paolo Rumerio, MarylandLHCDM, Ann Arbor, Jan 6 th - 9 th, 2009  EE and Pixels were installed just before beam and worked quite well very soon Beam pipe: insertion and bakeout June 08 Pixels: inserted Aug. 08 ECAL endcaps: completed and fully installed Aug. 08

CMS Closed – 3 September 2008 Page 7 Paolo Rumerio, MarylandLHCDM, Ann Arbor, Jan 6 th - 9 th, 2009  ……………..  ………..  …………….

Commissioning Page 8 Paolo Rumerio, MarylandLHCDM, Ann Arbor, Jan 6 th - 9 th, 2009  Magnet Test and Cosmic Challenge (MTCC) took place in summer 2006 on the surface of the experiment location  Commissioning of the magnet and measuring of the field map  Test of a vertical slice of the detector and cosmic data taking  Since May 2007, three- to ten-day-long exercises took place underground with the installed detector components, electronics and services  Increasing size and number of participants, and scope of the exercises  Balancing with installation schedule and detector local commissioning Detector Participation versus Time

Cosmic Runs Without Magnetic Field Page 9 Paolo Rumerio, MarylandLHCDM, Ann Arbor, Jan 6 th - 9 th, 2009 Sept.10: Beam CRUZET3: Strip tracker joins CRUZET4 : Pixel tracker and EE join (final CMS configuration) CRUZET2 CRUZET1 Events Collected Versus Time End March 08  Since March 2008, global runs saw an increasing focus on  stability of operations  cosmic ray data taking (hence named CRUZET - Cosmic RUns at ZEro Tesla)

First Beam Page 10 Paolo Rumerio, MarylandLHCDM, Ann Arbor, Jan 6 th - 9 th, 2009  Sun and Mon, Sept. 7 and 8  Beam 1 (clockwise) single “shots” onto a collimator 150 meters upstream of CMS (also called “splash” events)  Tue, Sept. 9  20 additional shots as above  Wed, Sept. 10  Circulating beams, beam 1 in the morning, beam 2 in the afternoon  Thu, Sept. 11  RF capture of beam Beam Pickup and CMS Beam Condition Monitors  Fri, Sept. 19 th  A faulty electrical connection between a dipole and a quadrupole failed, massive helium loss, and cryogenics and vacuum lost  Beam elements in the region are being extracted and replaced or repaired During all of these activities, CMS triggered and recorded data (without CMS magnetic field and with inner tracking systems kept off)

Event Display of a Beam-on-Collimator Event Page 11 Paolo Rumerio, MarylandLHCDM, Ann Arbor, Jan 6 th - 9 th, 2009  ……………..  ………..  ……………. 11 From 2x10^9 protons on a collimator 150 m upstream HCAL Energy ECAL Energy Drift Tube hits

Page 12 Paolo Rumerio, MarylandLHCDM, Ann Arbor, Jan 6 th - 9 th, 2009 ECAL vs. HCAL Energy Correlation in Beam-on-Collimator Events  Correlation between reconstructed energy in the CMS Hadron Barrel calorimeter (HB) and Electron Barrel Calorimeter (EB) for beam-on-collimator events in September  The large reconstructed energy values are the result of the hundreds of thousands of muons which passed through the detector during each event.

Muon Chamber Number of Hits in Beam-on-Collimator Events Page 13 Paolo Rumerio, MarylandLHCDM, Ann Arbor, Jan 6 th - 9 th, 2009  ……………..  ………..  …………….  Linearity of the number of hits in the third ring of DT chambers vs. total ECAL energy for beam-on-collimator events

Synchronization of HCAL from Beam-on-Collimator Events Page 14 Paolo Rumerio, MarylandLHCDM, Ann Arbor, Jan 6 th - 9 th, 2009  The pulse arrival time of beam-on-collimator events is predicted using geometry considerations  Left panel: difference between predicted and mean pulse arrival time  beam-on-collimator events of Sep. 10.  HCAL barrel uses tuned integration delays, while HCAL endcap, forward and outer use not tuned delays  Right panel: as above, with the following differences  beam-on-collimator events of Sep. 18  HCAL uses delays tuned from previous beam-on-collimator runs (except a small region of the Outer calorimeter, omitted here)

RF Capture of the LHC Beam seen in HCAL Endcap Energy and CMS Trigger Time Page 15 Paolo Rumerio, MarylandLHCDM, Ann Arbor, Jan 6 th - 9 th, 2009 Distribution of energy observed in the CMS Endcap Hadron Calorimeter. Before the capture of the LHC beam by the RF system, there is a high rate of energy deposit near the beam line. After the capture, the beam is quite clean. Distribution of the CMS trigger time versus bunch crossing (BX) number. Before the capture of the LHC beam by the RF system, the trigger timing is spread over a few BXs. After the capture, the trigger timing is sharply peaked at BX=831.

Evidence of Beam Gas Collisions Page 16 Paolo Rumerio, MarylandLHCDM, Ann Arbor, Jan 6 th - 9 th, 2009  Average energy as a function of eta in the CMS Forward Hadron Calorimeter (HF) for circulating beam events at LHC.  The events are triggered by the HF from LHC's Beam 2, which passes through the CMS Detector from negative to positive z.  The events are further selected to contain at least one deposit of 20 GeV in a tower which is registered by both the long and short fiber sections of the tower.  The long and short sections measure the total energy and the hadronic energy of a shower, respectively.  The peak in energy deposition towards positive pseudorapidity is a signature of beam-gas interactions near or within the detector, as the remnants of beam-gas interactions will have a small transverse momentum and a larger longitudinal momentum from the initiating proton.

Beam Halo vs. Cosmic Muons Page 17 Paolo Rumerio, MarylandLHCDM, Ann Arbor, Jan 6 th - 9 th, 2009  Distribution of the angles of reconstructed muon tracks with respect to the plane perpendicular to the beam.  Beam halo muons typically make a small angle (blue histogram).  Muons from cosmic rays pass through the cathode strip chambers at a more oblique angle, as seen when the beam is off (black histogram).  When the beam is on (orange-shaded histogram) the distribution consists of two pieces, one of which closely resembles cosmic rays, and the other which matches the beam halo simulation.  The normalization of the blue and black histograms are not based on any calculation; they are meant to guide the eye.  Beam Halo Muon in CSC and HCAL Beam Halo Muons Cosmic Muons

Beam Halo Hit Distribution Page 18 Paolo Rumerio, MarylandLHCDM, Ann Arbor, Jan 6 th - 9 th, 2009 ME  4ME  3ME  2ME  1 ME+1ME+2ME+3ME+4  Hit distribution in the Cathod Strip Chambers  Red arrows indicate the order beam traversed endcap disks  A few chambers are being fixed during the winter shutdown

Cosmic Run At Four Tesla - CRAFT Page 19 Paolo Rumerio, MarylandLHCDM, Ann Arbor, Jan 6 th - 9 th, 2009

CRAFT Page 20 Paolo Rumerio, MarylandLHCDM, Ann Arbor, Jan 6 th - 9 th, 2009  Four weeks of continuous running  19 days with magnet at the operational setting of B=3.8 T  Gained operational experience and put in evidence sources of inefficiency  Collected 370 M cosmic events, out of which 290 M with B = 3.8 T. Of those with magnetic field on:  87% have a muon track reconstructed in the chambers  3% have a muon track with strip tracker hits (~7.5 M tracks)  3 x have a track with pixel hits (~75K tracks)  Data operation performed satisfactorily  600 TB of data volume transferred  Prompt reconstruction at Tier 0 completed with a typical latency of 6h  Tier 0 to Tier 1 at average of 240 MB/s Number of cosmic events vs. time

Tracker Performance Page 21 Paolo Rumerio, MarylandLHCDM, Ann Arbor, Jan 6 th - 9 th, 2009  On track Strip clusters S/N ratio, corrected for the track angle  TOB thick sensors: S/N = 32  TIB/TID thin sensors: S/N = 27/25  TEC (mixed thickness): S/N = 30  Track hit finding efficiency  TIB and TOB layers  Muon momentum distribution  high quality tracks (8 hits, one in TIB layers 1-2, one in TOB layers 5-6)  Partial CRAFT statistics (expected >70K tracks at P T >100 GeV for full CRAFT) S/N Entries Layer

Tracker Alignment Page 22 Paolo Rumerio, MarylandLHCDM, Ann Arbor, Jan 6 th - 9 th, 2009  Chi Square distribution  Using 4M tracks for alignment and 1M for validation  “Unaligned” is the nominal geometry  “CRUZET” is the geometry obtained from the B=0T runs using the Hits and Impact Point method and survey constraints  “CRAFTHIP” is the geometry obtained from the Hits and Impact Point algorithm applied to CRAFT data, including survey constraints  “CRAFTMP” is the geometry obtained from the Millepede algorithm applied to CRAFT data  Mean of residual distributions (cm)  Only modules with >30 hits considered  TIB 96%, TID 98%, TOB 98%, TEC 94%  HIP algorithm : TIB RMS = 26  m TOB RMS = 28  m

Pixel Occupancy and Alignment Page 23 Paolo Rumerio, MarylandLHCDM, Ann Arbor, Jan 6 th - 9 th, 2009  Barrel aligned at module level ( hits, 89%)  Endcap aligned at half-disk level (8) RMS=47m RMS=112m

Drift Tube Muon System Page 24 Paolo Rumerio, MarylandLHCDM, Ann Arbor, Jan 6 th - 9 th, 2009  Residual Distributions  Reasonable agreement between data and MC after cosmic muon arrival time fit  Sigma ~ 200 – 260  m  Sector 4 of wheel -2 is shown here  B field degrades MB1 distribution in wheels +/-2 DataMC MB4 MB3 MB2 MB1

Drift Tubes Drift Velocity Along z-Axis with/without Field Page 25 Paolo Rumerio, MarylandLHCDM, Ann Arbor, Jan 6 th - 9 th, 2009  Innermost stations on outer wheels have largest radial field  Maximum difference in drift velocity is 3%

HCAL Barrel Muon Response Page 26 Paolo Rumerio, MarylandLHCDM, Ann Arbor, Jan 6 th - 9 th, 2009 HB energy: signal from HB towers corrected for muon path length in HB  Event selection:  Muon track matching in DT and Tracker  20 GeV/c < P µ < 1000 GeV/c  CRAFT: 200 K events  MC: 15 K events Test Beam 2006 P µ = 150 GeV/c Mean signal = 2.8 GeV CRAFT data

ECAL Barrel Occupancy Page 27 Paolo Rumerio, MarylandLHCDM, Ann Arbor, Jan 6 th - 9 th, 2009  Higher occupancy in top and bottom regions (vertical flux of cosmic rays)  Top EB- is closer to the shaft of the CMS P5 pit  Other modulations are due to the cluster efficiency varying with crystal light yield.  EB+7 and EB+16 suffered from low voltage problems - being fixed.  Empty 5x5 crystal regions are trigger towers masked from the readout.  Occupancy map of clusters in cosmic muon runs during CRAFT  Avalanche photodiode gain set to x4 the LHC conditions.  Clusters are seeded either from a single crystal or a pair of adjacent crystals above threshold EB+7 EB+16

ECAL Stopping Power Page 28 Paolo Rumerio, MarylandLHCDM, Ann Arbor, Jan 6 th - 9 th, 2009  Stopping power for cosmic muons as a function of their momentum  Muon momentum is measured in the tracker  The ECAL energy deposit is measured by the cluster energy matched to the track  The track length in ECAL is estimated from track propagation inside ECAL crystals  Loose selection on the track distance of closest approach to the centre of CMS Blue dots: CRAFT experimental data Black line: dE/ρdx in PbWO 4 Red dashed line: collision loss Blue dashed line: bremsstrahlung radiation

Activities for and after winter shutdown Page 29 Paolo Rumerio, MarylandLHCDM, Ann Arbor, Jan 6 th - 9 th, 2009  Detector opening started on Nov 17 th  Started a selected list of interventions/repairs for problematic channels (order of the percent)  CMS cooling system maintenance (done)  Installation of Preshower detector in February  Continue the optimization of detector operations  Optimization of online system and procedures to eliminate possible sources of data taking inefficiency  Centralization and optimization of detector control system and monitoring  Consolidation of data quality monitor and certification  Aim to reduce the needed number of shifters and expertise to decrease long term manpower load  Schedule for Resuming Commissioning Activities  Global run sessions to be resumed mid-Feb  First CRUZET (Cosmic RUn at ZEro Tesla) in April  Detector closed around mid-May 2009  Extended CRAFT (Cosmic Run At Four Tesla) before LHC beam

Conclusions Page 30 Paolo Rumerio, MarylandLHCDM, Ann Arbor, Jan 6 th - 9 th, 2009  A long, intensive and challenging installation and commissioning campaign was carried out successfully  All major components of the detector have been installed and commissioned  Preshower detector will be installed in February  CMS was ready for beam  Collected and exploited at best the beam data delivered before the September 19 th incident  A one-month-long cosmic ray run with nominal magnetic field has been taken  Commissioned and verified stability of operations (detector, magnet and operators)  Pointed out inefficiencies and issues to be addressed  Some interventions on detector components are currently being carried out  none of the problems being worked on would have prevented efficient data taking if collisions had been delivered  Schedule for this year has been defined  It will evolve with time, depending on ongoing repair activities and progresses made  Commissioning activities will resume by the end of this month. The goal is to optimize performance, increase efficiency and reduce manpower and expertise needed in control room  CMS will be closed again with enough contingency for being ready for beam, allowing another extended cosmic ray run with magnetic field