LSWG day, Sept. 2, 2014, B. Auchmann for the BLMTWG Collaboration of many teams: OP, RF, BI, Collimation, LIBD, FLUKA, etc. T. Baer, M. Bednarek, G. Bellodi,

Slides:



Advertisements
Similar presentations
LHC Collimation Working Group – 19 December 2011 Modeling and Simulation of Beam Losses during Collimator Alignment (Preliminary Work) G. Valentino With.
Advertisements

Critical beam losses during Commissioning & Initial Operation Guillaume Robert-Demolaize (CERN and Univ. Joseph Fourier, Grenoble) with R. Assmann, S.
LHC Commissioning WG 27/03/ Commissioning of BLM system L. Ponce With the contribution of B. Dehning, E.B. Holzer, M. Sapinski, C. Zamantzas and.
LHC Beam Operation CommitteeJune, 14 th UFOs in the LHC Tobias Baer LBOC June, 14 th 2011 Acknowledgements: N. Garrel, B. Goddard, E.B. Holzer, S.
LHC progress Thursday 30 th April 2015 Coordination: Mike Lamont, Wolfgang Hofle.
1 Analysis of MD on IR1 and IR5 aperture at 3.5 TeV – progress report C. Alabau Pons, R. Assmann, R. Bruce, M. Giovannozzi, G. Müller, S. Redaelli F. Schmidt,
BLM thresholds for MQW magnets V. Raginel, B. Auchmann, D. Wollmann BLM Threshold Working Group meeting, 24/02/2015.
MD#2 News & Plan Tue – Wed (19. – 20.6.) DayTimeMDEiCMP Tue06: GeV  4 TeV: Ramp for chromaticity - missed A 08:00Ramp down 10: GeV: Large.
Lot’s of time lost due to cryo problem in IR8. Major impact, therefore review of MD program… Start discussion here, please let us know your input. Will.
Loss maps of RHIC Guillaume Robert-Demolaize, BNL CERN-GSI Meeting on Collective Effects, 2-3 October 2007 Beam losses, halo generation, and Collimation.
Eva Barbara Holzer IEEE NSS, Puerto Rico October 26, Beam Loss Monitoring System of the LHC Eva Barbara Holzer, CERN for the LHC BLM team IEEE Nuclear.
W. LHC Studies WG Day Review MDs Transverse Damper from Run1 to Run2 reported by W. Hofle for ADT & friends LHC MSWG Special Meeting.
BIQ Workshop, September 15 Collaboration of many teams: BLM, Collimation, FLUKA, LIBD, OP, RF, etc. B. Auchmann, T. Baer, M. Bednarek, G. Bellodi, C.
4 th BLMTWG Meeting, January 13, 2015 by B. Auchmann, A. Bertarelli, R. Bruce, F. Cerutti, B. Dehning, L. Esposito, E.B. Holzer, M. Kalliokoski, A. Lechner,
Off-momentum tail scraping for passive abort gap cleaning (MD 444) D. Mirarchi, R. Bruce, S. Redaelli On behalf of the LHC Collimation Team LHC Study Working.
2 nd BLMTWG meeting, B. Auchmann, O. Picha, with A. Lechner.
Beam-induced Quench Tests of LHC Magnets Beam-induced Quench Tests of LHC Magnets, B.Dehning 1 B. Auchmann, T. Baer, M. Bednarek, G. Bellodi, C. Bracco,
Status of halo excitation studies at CERN R. Bruce, D. Banfi, M. Buzio, J. Barranco, O. Bruning, X. Buffat, R. Chritin, R. de Maria, M. Fitterer, M. Giovannozzi,
LHC Studies Working Group – 03 July 2012 Beam Scraping and Diffusion + Asynchronous Dump MD G. Valentino, R. W. Assmann, F. Burkart, L. Lari, S. Redaelli,
Status of FLUKA Simulations for Collimation BLM Thresholds 6 th BLM Threshold Working Group 10/02/2015 E.Skordis On behalf of the FLUKA team Sixtrack input.
6 th QTAWG meeting, March 28, Overview 6 tests/events have been analyzed. RegimeMethodCERN namingMagnet typeTemperature shortkick750 µrad kick eventMB1.9.
Bus-Bar Quench Studies Summary of Available Calculations LMC Meeting August 5 th 2009 Bus-Bar Quench Studies Summary of Available Calculations LMC Meeting.
Mariusz Sapinski BI/BL Acknowledgements: 1 Planning of quench tests - LMC158 Draft planning of beam induced quench tests at the end of 2013 run LHC Machine.
Eva Barbara Holzer MPP, CERN Eva Barbara Holzer 1 Approval procedure for master threshold changes.
BSRT CALIBRATION MD SUMMARY LSWG #6-15/09/2015 BSRT TEAM.
Chromaticity dependence of the vertical effective impedance in the PS Chromaticity dependence of the vertical effective impedance in the PS S. Persichelli.
28-May-2008Non-linear Beam Dynamics WS1 On Injection Beam Loss at the SPring-8 Storage Ring Masaru TAKAO & J. Schimizu, K. Soutome, and H. Tanaka JASRI.
Simulation comparisons to BLM data E.Skordis On behalf of the FLUKA team Tracking for Collimation Workshop 30/10/2015 E. Skordis1.
AOB: Adjustments to BLM Thresholds in Light of Run-2 Experience with UFOs B. Auchmann, J. Ghini, L. Grob, A. Lechner, D. Wollmann. 118 th MPP,
Chamonix 2006, B.Dehning 1 Commissioning of Beam Loss Monitors B. Dehning CERN AB/BDI.
Beam Induced Quench Session 2: quench test at LHC B. Dehning, C. Bracco.
Draft MD Planning Thu (3.11.) DayTimeMDMP Thu05:00 Ramp down, cycle 07: GeV: Injection stability and losses – check steering constraints, define.
Case study: Energy deposition in superconducting magnets in IR7 AMT Workshop A.Ferrari, M.Magistris, M.Santana, V.Vlachoudis CERN Fri 4/3/2005.
1 Commissioning and Operation of the machine protection system L. Ponce Acknowledgements: M. Zerlauth, J. Wenninger, D. Wollmann, V. Chetvertkova, G. Valentino,
Β*-dependence on collimation R. Bruce, R.W. Assmann C. Alabau Pons, F. Burkart, M. Cauchi, D. Deboy, M. Giovannozzi, W. Herr, L. Lari, G. Muller, S. Redaelli,
Future Circular Collider Study Kickoff Meeting CERN ERL TEST FACILITY STAGES AND OPTICS 12–15 February 2014, University of Geneva Alessandra Valloni.
Cryo back at 17:30 Beam back at 19:00 IR2 aperture until ~03:00 Since then no beam from the SPS:  Connector problem on MKD  Connector eroded, needs to.
LHC Beam Operation CommitteeJuly, 24 th update on UFOs: 2012 Observations, Studies and Extrapolations LBOC Tobias Baer July, 24 th 2012 Acknowledgements:
Collimation design considerations at CERN (with some applications to LHC) R. Bruce on behalf of the CERN LHC collimation project R. Bruce,
E.B. Holzer BLM Meeting: Q & A March 20, Questions and Answers.
2 nd BLMTWG meeting, B. Auchmann, O. Picha, with A. Lechner.
1 st BLMTWG Meeting, , B. Auchmann, O. Picha with help from M. Sapinski, E.B. Holzer, A. Priebe.
Juan F. Esteban Müller P. Baudrenghien, T. Mastoridis, E. Shaposhnikova, D. Valuch IPAC’14 – Acknowledgements: T. Bohl, G. Iadarola, G. Rumolo,
Overview of LHC Beam Loss Measurements
Workshop on Beam Induced Quenches, Sept. 15, 2014
Friday Access in shadow of SPS interventions (RF, extraction septa power supply) Lead into problem on the cooling of the extraction septa in SPS Both beams.
BEAM LOSS MONITORING SYSTEM
MD Planning Fri – Sat (26. – 27.8.)
Tracking simulations of protons quench test
Cryo Problem MD Planning Tue (1.11.) C B Day Time MD MP Tue 01:00
Potential failure scenarios that can lead to very fast orbit changes and machine protection requirements for HL-LHC operation Daniel Wollmann with input.
MD2036: UFO dynamics studies and UFO fast detection
Saturday 21st April 00:33 Interlock during ramp on BLM HV
Progress in Collimation study
IP7 losses scaling and impact on forecast for HL-LHC era
BEAM LOSS MONITORING SYSTEM
The 4th International Particle Accelerator Conference, IPAC13
Verification of the Beam Loss studies at start-up
MD#2 News & Plan Tue – Wed (19. – 20.6.)
Commissioning of BLM system
Beam Loss Monitoring Eva Barbara Holzer, CERN
MD#2 News & Plan Tue – Wed (19. – 20.6.)
LHC progress report Week
1st HiLumi LHC / LARP Collaboration Meeting 2011 Nov 17th
Why do BLMs need to know the Quench Levels?
Collimation margins and *
Beam Loss Simulations LHC
MD#2 News & Plan Tue – Wed (19. – 20.6.)
FLUKA Energy deposition simulations for quench tests
Another Immortal Fill….
Presentation transcript:

LSWG day, Sept. 2, 2014, B. Auchmann for the BLMTWG Collaboration of many teams: OP, RF, BI, Collimation, LIBD, FLUKA, etc. T. Baer, M. Bednarek, G. Bellodi, C. Bracco, R. Bruce, F. Cerutti, V. Chetvertkova, B. Dehning, P. P. Granieri, W. Hofle, E. B. Holzer, A. Lechner, E. Nebot Del Busto, A.Priebe, S. Redaelli, B. Salvachua, M. Sapinski, R. Schmidt, N. Shetty, E. Skordis, B.M. Solfaroli, D. Valuch, A. Verweij, J. Wenninger, D. Wollmann, M. Zerlauth

Quench Test Analysis What is the energy deposition in the coil at the moment of quench? Particle Shower FCBM: loss rate QPS: moment of quench Particle tracking: spatial distribution BLM signals Validation Input Analysis Electro-Thermal Estimate (MQED) BLM: normalized time distribution P. shower: norm. space distribution Quench test QPS: moment of quench Subscale experiments Quench Level Upper bound or estimate Lower bound Particle Tracking Settings: bump amplitude etc. Beam parameter measurements: ε, Q, etc. BLM normalized time distribution BPM signals

Why quench tests? To obtain binary quench/no-quench data for realistic beam loss scenarios, e.g., collimation (see Stefano’s talk), and single-turn losses on collimators (see Jan’s talk). To validate electro-thermal and particle-shower models used to set BLM thresholds, used to define requirements for upgrades. To understand beam loss scenarios relevant for BLM threshold

Single-Turn Losses (LIBD) 2011 MD2: Quench tests (QT) on Q4/TCSG and Q6/TCLIB at 450 GeV. No quenches occurred for varying collimator settings, bunch intensities, and orbit bump. BLM Callibration studies performed. Documentation: CERN-ATS-Note MD, W. Bartmann, et al., Quench Margin at Injection. C. Bracco, et al., Experiments on the Margin of Beam Induced Quenches for LHC Superconducting Quadrupole Magnet in the LHC, IPAC End-of-Run QT Campaign: Q6/TCLIB QT, 450 GeV bunches, variable magnet currents. Q6 magnet was quenched. No FLUKA validation with BLM data due to saturation. Moderate consistency. Documentation: C. Bracco, et al. Test and Simulation Results for Quenches Induced by Fast Losses on a LHC Quadrupole, IPAC Run 2 tests: Q4/TCSG test (see LIBD talk). Improve diagnostics by LICs?

UFO Time-Scale Losses 2010: Wire-scanner quench test on D4 magnet D4 K) quenched. Uncertainties due to timing and loss maximum in coil ends End-of-Run QT Campaign: ADT quench test MQ quenched. Large uncertainty on moment of quench. Large uncertainties in electro-thermal model. Best approximation of UFO-type losses in 1.9 K magnets.

UFO Time-Scale Losses 2013 End-of-Run QT Campaign: ADT quench test Preparatory MDs: 2012 MD 1/2/3, 2013 test Documentation CERN-ATS-Note MD, A. Priebe, et al., ADT fast losses MD M. Sapinski, et al., Generation of Controlled Losses in Milisecond Timescale with Transverse Damper in LHC, IPAC V. Chetvertkova, et al., MadX Tracking Simulations to Determine the Beam loss Distributions for the LHC Quench Tests with ADT Excitation, IPAC N. V. Shetty, et al., Energy Deposition and Quench Level Calculations for Millisecond and Steady-state Quench Tests of LHC Arc Quadrupoles at 4 TeV, IPAC2014. C. Bracco, et al. Test and Simulation Results for Quenches Induced by Fast Losses on a LHC Quadrupole, IPAC M. Sapinski, et al., Beam-induced Quench Tests of LHC Magnets, IPAC PRSTAB paper to be submitted in autumn A. Priebe, CERN-THESIS Run 2 tests: Repeat ADT quench test with improvements: better instrumentation (oscilloscope), complete set of beam-parameter measurements just before the test, good understanding of ADT settings, even faster losses. In parallel we aim at improving the electro-thermal model; see BIQ workshop, Sept , (

UFO Time-Scale Losses Run 2 tests continued: Study losses induced by fast current-change in RD1.L/R1 (B. Dehning): Based on CERN-THESIS , Andres Gomez Alonso Retreat collimators and create orbit bump in MQ. Lose pilot bunch within ~10 turns due to orbit distortion. Detailed study needed.

Steady-State Losses 2010 Dynamic orbit bump quench tests at injection and 3.5 TeV Quenches in MQ at 450 GeV and 3.5 TeV. Analysis results will be used to se low-energy arc and DS thresholds. Documentation: A. Priebe, et al., Beam-induced Quench Test of a LHC Main Quadrupole, IPAC A. Priebe, et al., Investigation of Quench Limits of the LHC Superconducting Magnets, IEEE Trans. On Appl. SC, Vol 23, No 3, June A. Priebe, CERN-THESIS PRSTAB paper to be submitted in autumn Collimation quench tests (see Collimation talk) No quenches occurred! 2013 End-of-Run QT Campaign ADT quench test MQ quenched after 20 s of steady losses. FLUKA/BLM discrepancy. Modest (30 µm) step in surface roughness could produce a better fit to BLM data. No full validation of electro-thermal model.

Steady-State Losses 2013 End-of-Run QT Campaign ADT quench test continued. Documentation: V. Chetvertkova, et al., MadX Tracking Simulations to Determine the Beam loss Distributions for the LHC Quench Tests with ADT Excitation, IPAC N. V. Shetty, et al., Energy Deposition and Quench Level Calculations for Millisecond and Steady-state Quench Tests of LHC Arc Quadrupoles at 4 TeV, IPAC2014. M. Sapinski, et al., Beam-induced Quench Tests of LHC Magnets, IPAC PRSTAB paper to be submitted in autumn A. Priebe, CERN-THESIS Run 2 tests: Repeat ADT quench test with improvements: complete set of beam-parameter measurements just before the test, good understanding of ADT settings, in a different aperture or magnet. In parallel we aim at improving the electro-thermal model; see BIQ workshop, Sept , (

Summary Series of successful quench tests help to improve and validate the electro-thermal model, set BLM thresholds for Run 2. Additional tests are required to validate the steady-state quench levels, Improve knowledge on UFO time-scale losses.

Wire Scanner Installation of a wire scanner to produce losses in Q7 or further downstream. Affected magnets at 1.9 K (in contrast to installed WS). Considerable cost (B. Dehning rough estimate 200 kCHF). Installation during long stop for vacuum issues. Requires pre-study: Losses in magnet ends lead to large error margins in the analysis. See if losses can be generated in the longitudinal center of the magnet. Could provide “UFO factory” – if needed.