1 Status of ECAL Mechanical and thermal R&D in Grenoble FJPPL’08 Denis Grondin Julien Giraud

Slides:



Advertisements
Similar presentations
Manchester 09/sept/2008A.Falou & P.Cornebise {LAL-Orsay}1 CALICE Meeting/ Manchester Sept 2008 SLAB Integration & Thermal Measurements.
Advertisements

CALICE Dave Bailey. Aims and Objectives Develop the technology to build a high- resolution tracking calorimeter for ILC experiments Main thrusts: –Testbeam.
WACH4 26/11/2002Julien Cogan CERN/EP/CMA-1- M0 COOLING IN H4 Cooling is a key issue : –APD gain : ~ -2.4 % /  C –XTAL response (scintillation) : ~ -1.9.
Mechanical Status of ECAL Marc Anduze – 30/10/06.
David Bailey Manchester. Summary of Current Activities UK Involvement DAQ for SiW ECAL (and beyond) “Generic” solution using fast serial links STFC (CALICE-UK)
IBL Mock Up IBL Mock Up MANUFACTURING 2011/04/29 François-Xavier NUIRY Maxence CURDY Andrea CATINACCIO CERN PH/DT/PO 1.
Marc Anduze – 09/09/2008 News on moulds and structures CALICE meeting - Manchester.
1 Denis Grondin – Sept.23 TH, 2010 Cooling & mechanics status CALICE Collaboration Casablanca at LPSC ECAL.
21/01/02 - ECAL Cooling - Arnaud Hormiere ST/CV 1 Development of ECAL COOLING PLANT Application to a Super Module.
Mickael Frotin– 07/06/2009 Demonstrator - Assembly ECAL meeting - London.
Anduze – 03/09/ Alveolar Structure - Towards ordering of pieces.
1 Denis Grondin / Julien Giraud – 01 December 2008 SLAB COOLING Denis Grondin Julien Giraud
ECAL silicon- tungsten status
Mickael Frotin– 15/01/2010 ECAL MACHANICAL R&D ECAL meeting - PARIS 1.
Bias Magnet for the Booster’s 2-nd Harmonic Cavity An attempt to evaluate the scope of work based of the existing RF design of the cavity 9/10/2015I. T.
CALICE Collaboration Meeting March 2014 Roman Pöschl LAL Orsay On behalf of: D. Grondin, J. Giraud J. Bonis, P. Cornebise, A. Thiebault, C. Bourgeois,
26 April 2013 Immanuel Gfall (HEPHY Vienna) Belle II SVD Overview.
ILC / ILD TPC Requirements of the support mechanics Volker Prahl ILD Workshop 2013 Cracow
Hcal Geometry and Assembly CLIC Meeting - LAPP December 2008, 15th.
ECAL EUDET MODULE progress & perspective EUDET annual meeting, oct, 18 st, Munich.
Marc Anduze – 09/09/2008 Report on EUDET Mechanics - Global Design and composite structures: Marc Anduze - Integration Slab and thermal measurements: Aboud.
09/03/2010 ADO-PO section meeting Beam Pipe Extraction/Insertion R. Vuillermet.
IPN Lyon ILD Mechanical structure April 2012 DHCAL Assembly, Tooling, Cooling J.C Ianigro - IPN Lyon -
1 Status of the CLIC two-beam module program A. Samochkine, G. Riddone Acknowledgements to the Module WG members 4 February 2014 CLIC Workshop 2014 (3-7.
Mechanical Status of EUDET Module Marc Anduze – 05/04/07.
VG1 i T i March 9, 2006 W. O. Miller ATLAS Silicon Tracker Upgrade Upgrade Stave Study Topics Current Analysis Tasks –Stave Stiffness, ability to resist.
EUDET JRA3 ECAL and FEE C. de La Taille (LAL-Orsay) EUDET status meeting DESY 10 sep 2006.
Physics requirement Radial envelope: 1265 mm to 1473 mm 12 wedges over 2  20 tungsten layers of 2.5 mm 10 tungsten layers of 5 mm Instrumented gap 1.25.
EUDET JRA3 ECAL in 2007 : towards “The EUDET module” C. de La Taille IN2P3/LAL Orsay.
Overview WG4 Meeting - 16th October 20121M. Gomez Marzoa, E. Da Riva Maximum ΔT admissible at cooling system T_1 T_2 T_1+0.5*ΔT Stave  If T_2 – T_1 =
Main features of PETS tank J. Calero, D. Carrillo, J.L. Gutiérrez, E. Rodríguez, F. Toral CERN, 17/10/2007 (I will review the present status of the PETS.
CALICE collaboration CALICE collaboration J-C BRIENT LCWS02 – Jeju Island The CALICE –ECAL Silicon - V. Vrba Very FE - S. Manen Readout/DAQ - P. Dauncey.
D. M. Lee, LANL 1 07/10/07 Forward Vertex Detector Overview Technical Design Overview Design status.
M. Sannino for S. Cuneo - I.N.F.N. Genova1 Rich2 MAPMT Housing & Cooling Outdated designs and what is needed to get a final executive design Imperial College.
– EUDET module – Report from Mechanics Brainstorming Marc Anduze – 30/06/2009 Laboratoire Leprince Ringuet Ecole polytechnique - Palaiseau.
Walter Sondheim 6/9/20081 DOE – Review of VTX upgrade detector for PHENIX Mechanics: Walter Sondheim - LANL.
18/02/20161 ASU Mechanical aspects Julien Bonis
Marc Anduze – CALICE Meeting – KOBE 10/05/07 Mechanical R&D for Technological EUDET ECAL Prototype.
SiD Hcal structure & 1m² Micromegas chamber prototype CALICE 2009 – LYON – 2009, septembre 17 th.
RICH2 support and cooling mechanics status update Massimo Benettoni July 30,
Monday June 8, 2009CALICE SiW ECAL Meeting ULC London EUDET prototype Thermal drain and plans for module assembly Julien Bonis CAD model.
Cooling of GEM detector CFD _GEM 2012/03/06 E. Da RivaCFD _GEM1.
EMC BWE Proto18 - Orsay Meeting 1 PANDA EMC BWE Proto18 Mikel Catania Goikoetxea, Javier Navarro Medrano, David Rodríguez Piñeiro, Yue Ma, Frank.
IPN Lyon ILD Mechanical structure February 2015 Design, Integration & Services J.C Ianigro - IPN Lyon -
Hcal Geometry and Assembly Videoconference January 2008, 24th.
ESS RFQ B. POTTIN and RFQ team CEA-IRFU. RFQ design Strategy 3 RF codes to validate calculations Consideration of machining and assembly possibilities.
HL-LHC-UK Thermal Shield Update Niklas Templeton 07/03/2016.
Third LPSC – 02 Nov 2014 Denis Grondin, Julien Giraud Si/W ECAL Endcap structures and cooling LPSC - Grenoble –nov Design of the.
High Granularity Calorimeters LLR – Feb 2-3 Denis Grondin, Julien Giraud Si/W ECAL Endcap structures and cooling 1.Design of the EM end-caps.
24 September 2012 Immanuel Gfall (HEPHY Vienna) SVD Status of Mechanics PXD-SVD Meeting Göttingen.
24 September 2012 Immanuel Gfall (HEPHY Vienna) Annekathrin Frankenberger (HEPHY Vienna) SVD Status of Mechanics PXD-SVD Meeting Göttingen.
SPS High Energy LSS5 Thermal contact & cooling aspects
SiW Electromagnetic Calorimeter - The EUDET Module Calorimeter R&D for the within the CALICE collaboration SiW Electromagnetic Calorimeter - The EUDET.
Marc Anduze first drawings of Ecal eudet module COPIED FROM : Marc Anduze PICTURES FROM : CALICE/EUDET electronic meeting – CERN – 12 July 07.
Marc Anduze – EUDET Meeting – PARIS 08/10/07 Mechanical R&D for EUDET module.
EUDET Extended SC SiW Ecal 1 SiW Ecal EUDET Module - General Schedule - Development of Different Components - (Towards) a working prototype Roman.
EUDET Annual Meeting SiW Ecal 1 SiW Ecal EUDET Module - General Schedule - Development of Different Components - (Towards) a working prototype Roman.
Mickael Frotin– 19/10/2009 ECAL MACHANICAL R&D CALICE meeting - Genève 1.
EUDET HCAL prototype; mechanics Felix Sefkow Work by K.Gadow, K.Kschioneck CALIC collaboration meeting Daegu, Korea, February 20, 2009.
Design of the thermosiphon Test Facilities 2nd Thermosiphon Workshop
Status of GASPARD mechanics
Hcal Geometry and Assembly
ECAL EUDET MODULE Summary talk
- STT LAYOUT - SECTOR F SECTOR A SECTOR B SECTOR E SECTOR D SECTOR C
A. Vande Craen, C. Eymin, M. Moretti, D. Ramos CERN
Mechanical aspects of SiW Ecal PCBs
LumiCal mechanical design, integration with LDC and laser alignment
Vertex Detector Mechanical R&D Design Questions and Issues
Requirements of the support mechanics
CALICE Collaboration Meeting at UT Arlington
Presentation transcript:

1 Status of ECAL Mechanical and thermal R&D in Grenoble FJPPL’08 Denis Grondin Julien Giraud André Béteille Denis Grondin / Julien Giraud – Paris – 15/05/2008

Denis Grondin / Julien Giraud – FJPPL’08 - PARIS – May 15 th ECAL - End-Caps design (1) Weight of each End-Cap : ~ 16 T The same principle than barrel with an alveolar composite/ tungsten structure, with different shapes and different sizes (end of slabs) Difficulty: getting shape for W plates 12 modules-3 distinct types (780 cells & detectors slab) Supporting rails 186 Design: g 1592 W : ~ kg Compared with barrel stave End-cap sector 4 columns 5 columns Configuration 0° 2 3 1

Denis Grondin / Julien Giraud – FJPPL’08 - PARIS – May 15 th ECAL - End-Caps design (2) Due to the possible crack in the geometry of design 1 (H.Videau-LLR) the same general shape could be saved with different size and position of modules Instead of 12 modules from 3 distinct types: 8 super-modules from 2 distinct types Difficulties: 800 Design: 2 W wire erosion cut test 1 2 ~2.40 m long ! Thermal (2.40m instead of 1.50m for longuest): T° dangerously rising in back-end of slabs Mechanical: >2.40m long thin alveoli maybe not feasible, Fastening system on HCAL /weight of module >3T ? Different shapes of slabs: cost increasing Alignment of slabs

Denis Grondin / Julien Giraud – FJPPL’08 - PARIS – May 15 th Thermal analysis of slab Influence of the FPGA dissipation (DIF) on current design of cooling system (Limit Condition of 20°C) : Simulation of heat conduction just by the heat copper shield :  = 0,27 W/layer (25 µW per channel)  FPGA = 3 W/layer Copper layer : λ = 400 W/m/K S = 180*0,4 mm2 ; L = 1,55 m LC of 20°C in the center of slab : ΔT = 7,95°C Network of contact areas / connector fixed on the 2 layers 25x15x6.2mm 1 copper layer LC of 20°C in the center of slab : ΔT = 12.3°C FPGA ΔT and size of cooling pipe increase (  T= 8.1 W to 98.1 W ) Cooling Pipe DIF

Denis Grondin / Julien Giraud – FJPPL’08 - PARIS – May 15 th Design of interface slab/DIF (from Maurice Goodrick, Bart Hommels) Current Module design compatible with proposal from Cambridge  Adapter board (size, thickness …)  Components size  Connectors size  Fastening devices / back-end system 78 mm 9.4 mm Copper plate on the PCB FPGA?

Denis Grondin / Julien Giraud – FJPPL’08 - PARIS – May 15 th A column, (25 mm wide minimum) to ensure quick thermal system’s connection External cooling system … taking into account thermal analysis of slab Cold plates for slab wedge inter-slab Thermal pieces (faces of cold plate) Tighten Screw for whole column End of PCB (DIF) Cold plate for column Mini Heatpipe Wedge 2 types of cooling systems to test: copper pipe 4x6 mm copper bloc Thread rod M3 + screw + wedge Both to be tested on : EUDET and demonstrator Copper pipes brazed Heat pipes rail copper pipe 10x12 mm

Denis Grondin / Julien Giraud – FJPPL’08 - PARIS – May 15 th Performance/cooling system Length 1.5 m Length 2.4 m Limit Conditions: -Temperature imposed of 20°c or -Exchange coefficient in the pipes with fluid at 20°c (h = 3445 W/m².K) Depending on: - length of slab - type of cooling system

Denis Grondin / Julien Giraud – FJPPL’08 - PARIS – May 15 th Cooling: global circulation (1) Barrel End Cap QtQb Qec Chiller To End Cap 4 m A B D E et F 5 m C Barrel Taking into account length and diameter for study Dimension 22 x 6 x 1 Only feeding circuit represented E Line F Line (contact with slabs)

Denis Grondin / Julien Giraud – FJPPL’08 - PARIS – May 15 th Cooling: global circulation (2) Power results : 2 FPGA per SLAB, power: 3 W each, then : 3 x 2 = 6 W SKIROC : 0.54 W / slab Barrel : Global Power : W Power per module : 487 W Power per column : 97.4 W End Cap : Power per End Cap : 5060 W Average power per module : 420 W ( )/3 Average power moyenne per column : 97 W Global Power : W Rough estimate on fluid circulation: Global flow rate : 150 l/min Variation of fluid temperature : in-out => 3°c Fluid speed < 2 m/s Maximal pressure drop : 1.2 bar Barrel from LLR

Denis Grondin / Julien Giraud – FJPPL’08 - PARIS – May 15 th Fluid circulation /mounting Fluid circulation => passages for pipes toward exterior of detector => free space to find and to adapt:  Passage for pipes and cables under rails (machining on composite surface)  Connection of pipes according mounting procedure for modules (per 5 / 3 and 2 / 1 after each) Tube cuivre Dext : 12 mm Dint : 10 mm Tubes cuivre Dext : 6 mm Dint : 4 mm Cables Water circulation Copper pipe Passage under rails in 15mm thick plate for both pipes and cables

Denis Grondin / Julien Giraud – FJPPL’08 - PARIS – May 15 th Means for cooling tests Use : EUDET and demonstrator Mounting characteristics : - Flow rate : 0.5 l/min to 1 l/min - Power to drain off : 100 W (3 layers) to 300 W (EUDET) - Temperature of fluid control at 20°C ajustable parameters : temperature & flow rate EUDET (300 W) or prototype 3 layers Chiller with indication and tuning of flow rate and temperature 1 Copper pipes brazed cooling system for demonstrator 1 Copper pipes brazed + 1 heat pipe cooling system for EUDET module Test procedures and recalculating Point 1 Point 2 Point 3 Slab equipped for tests 2 types of cooling systems to test Localization of measurement points for temperature survey (PT100 probe): SLAB prototype to equip with:  Remote power to simulate a real detector  Copper shielding (drains) with specific geometry  3 measuring points inside ?

Denis Grondin / Julien Giraud – FJPPL’08 - PARIS – May 15 th Design of module … … based on mechanical simulations : Linear Analysis of “full scale” ECAL modules (barrel and End-caps) Global simulations : global displacements and localization of high stress zone for different solutions (dimensions) Local simulations : more precise simulations and study of different local parameters to design correctly each part of this structure (thickness of main composite sheets, fastener’s behaviour…) Check and validate simulation results by destructive tests for each issues End-Cap module Configuration 90° g OK

Denis Grondin / Julien Giraud – FJPPL’08 - PARIS – May 15 th Fastening system ECAL/HCAL Assembled structure : Each alveolar layer are done independently, cut to the right length (with 45°) and assembled alternatively with W plates in a second curing step. Composite plates cores Fastening system (inserts) W layer principle #2 : assembled structure : This principle allows to introduce metallic inserts before assembling in 15 mm thick composite plate. Inserts are glued into the plate (epoxy resin)  Ready : 4 composite plates (15mm and 2 mm) OK Insert Rail ECAL HCAL Uniform dispatch of 18 inserts on the 15mm thick plate « Alveolar layer » Composite plates 2mm&15 mm

Denis Grondin / Julien Giraud – FJPPL’08 - PARIS – May 15 th … including ECAL/HCAL interfaces (+ inlet/outlet) : Choice of fasteners : rails screwed through the medium of inserts. Non magnetic (B=4T !) Mechanical simulations of the ECAL/HCAL interface to take into account of its influence Design of connection system (power supply + cooling + outlets) and of DIF cards support Choices will have to comply with specificities of barrel and End-caps (size, wires, cooling...) Fastening system ECAL/HCAL HCAL ECAL ECAL/HCAL – End-Cap Configuration 0° - central module Only 3cm available … HCAL ECAL Rails fixed by the way of inserts directly on ECAL modules. EUDET 15mm thick plate with it’s rails; ready to be assembled with alveoli layers

Denis Grondin / Julien Giraud – FJPPL’08 - PARIS – May 15 th Interface ECAL/HCAL (1) tools for tensile tests Mechanical tests of interface (feb 2008): Destructive tests of fastening elements: until breaking of interface in order to evaluate constraints and elongations under different loading cases: - Tensile / Compression - Cutting / Bending Machine for destructive tests Test pieces (interface) tools for tensile and compression tests  Check and validate simulation results by destructive tests for each issues : OK  Similar type of tests to be performed for:  characterization and calculation of LLR inter- alveoli thin sheets of composite (soon)  Checking of full equiped demonstrator fastening system (soon)

Denis Grondin / Julien Giraud – FJPPL’08 - PARIS – May 15 th Fabrication and destructive tests of 15mm thick composite samples with inserts ( For Eudet & demonstrator) Winter ILC - ECAL Mechanical R&D 1 for loading test with rails - 1 for mechanical tests with inserts Next one in february 2008 for Eudet Interface ECAL/HCAL (2)

Denis Grondin / Julien Giraud – FJPPL’08 - PARIS – May 15 th Schedule Backend system ( DIF support ): Confirmation of FPGA consumption and position… Composite Structures : demonstrator (3 layers – 126mm) and EUDET module structures to be assembled and tested with fastening and cooling system. Detector slabs integration for thermal tests with tuned power, copper shields with specific geometry and 3 temperature probes. Modules : Tests Modules: studies Finite Element Model of end-cap modules to estimate the overall deflection, with new cells 180x8.6. Geometry confirmation on End-cap (max.length of slabs). Thermal simulations. Optimization of composite sheets : studies of best parameters for thick plates Fastening system design (rails, facilitated insertion of modules) and inserts drawings : OK Cooling system and technology: Thermal study - design of copper pipes & heat pipes Other studies & tests on going on Composite Structures & Services for CALICE (End-Caps) Metrology & Machining tests of tungsten plates: OK Cutting tests on demonstrator: Oct.08 Moulding of the composite parts 15mmm & 2mm thick with metal inserts: OK Destructive tests on composite samples with inserts: OK. On LLR « I » thin walls: june 08 Prototype of cooling system: 2 ≠solutions of connection kit for slabs: summer 2008… Fastening system ECAL/HCAL: destructive tests on the demonstrator: summer 2008 Collaboration: needs