The Ku-band Network Nara Institute of Science and Technology AI3 Nara NOC Team UMEDA Toshiyuki.

Slides:



Advertisements
Similar presentations
TWO STEP EQUATIONS 1. SOLVE FOR X 2. DO THE ADDITION STEP FIRST
Advertisements

Numbers Treasure Hunt Following each question, click on the answer. If correct, the next page will load with a graphic first – these can be used to check.
AP STUDY SESSION 2.
Advanced Piloting Cruise Plot.
1
Feichter_DPG-SYKL03_Bild-01. Feichter_DPG-SYKL03_Bild-02.
Copyright © 2003 Pearson Education, Inc. Slide 1 Computer Systems Organization & Architecture Chapters 8-12 John D. Carpinelli.
Chapter 1 The Study of Body Function Image PowerPoint
Copyright © 2011, Elsevier Inc. All rights reserved. Chapter 6 Author: Julia Richards and R. Scott Hawley.
1 Copyright © 2013 Elsevier Inc. All rights reserved. Appendix 01.
David Burdett May 11, 2004 Package Binding for WS CDL.
and 6.855J Spanning Tree Algorithms. 2 The Greedy Algorithm in Action
We need a common denominator to add these fractions.
1 RA I Sub-Regional Training Seminar on CLIMAT&CLIMAT TEMP Reporting Casablanca, Morocco, 20 – 22 December 2005 Status of observing programmes in RA I.
Jeopardy Q 1 Q 6 Q 11 Q 16 Q 21 Q 2 Q 7 Q 12 Q 17 Q 22 Q 3 Q 8 Q 13
Jeopardy Q 1 Q 6 Q 11 Q 16 Q 21 Q 2 Q 7 Q 12 Q 17 Q 22 Q 3 Q 8 Q 13
CALENDAR.
Reducing Fractions. Factor A number that is multiplied by another number to find a product. Factors of 24 are (1,2, 3, 4, 6, 8, 12, 24).
FACTORING ax2 + bx + c Think “unfoil” Work down, Show all steps.
Learning to show the remainder
1 Click here to End Presentation Software: Installation and Updates Internet Download CD release NACIS Updates.
Break Time Remaining 10:00.
PP Test Review Sections 6-1 to 6-6
Mental Math Math Team Skills Test 20-Question Sample.
Bright Futures Guidelines Priorities and Screening Tables
Bellwork Do the following problem on a ½ sheet of paper and turn in.
Exarte Bezoek aan de Mediacampus Bachelor in de grafische en digitale media April 2014.
VOORBLAD.
15. Oktober Oktober Oktober 2012.
Copyright © 2012, Elsevier Inc. All rights Reserved. 1 Chapter 7 Modeling Structure with Blocks.
1 RA III - Regional Training Seminar on CLIMAT&CLIMAT TEMP Reporting Buenos Aires, Argentina, 25 – 27 October 2006 Status of observing programmes in RA.
BIOLOGY AUGUST 2013 OPENING ASSIGNMENTS. AUGUST 7, 2013  Question goes here!
Basel-ICU-Journal Challenge18/20/ Basel-ICU-Journal Challenge8/20/2014.
1..
© 2012 National Heart Foundation of Australia. Slide 2.
Adding Up In Chunks.
MaK_Full ahead loaded 1 Alarm Page Directory (F11)
LO: Count up to 100 objects by grouping them and counting in 5s 10s and 2s. Mrs Criddle: Westfield Middle School.
Understanding Generalist Practice, 5e, Kirst-Ashman/Hull
Before Between After.
Addition 1’s to 20.
25 seconds left…...
Equal or Not. Equal or Not
: 3 00.
5 minutes.
Januar MDMDFSSMDMDFSSS
1 hi at no doifpi me be go we of at be do go hi if me no of pi we Inorder Traversal Inorder traversal. n Visit the left subtree. n Visit the node. n Visit.
Week 1.
Analyzing Genes and Genomes
We will resume in: 25 Minutes.
©Brooks/Cole, 2001 Chapter 12 Derived Types-- Enumerated, Structure and Union.
Essential Cell Biology
Converting a Fraction to %
Clock will move after 1 minute
Intracellular Compartments and Transport
PSSA Preparation.
Essential Cell Biology
Immunobiology: The Immune System in Health & Disease Sixth Edition
Physics for Scientists & Engineers, 3rd Edition
Energy Generation in Mitochondria and Chlorplasts
Select a time to count down from the clock above
Murach’s OS/390 and z/OS JCLChapter 16, Slide 1 © 2002, Mike Murach & Associates, Inc.
Copyright Tim Morris/St Stephen's School
Schutzvermerk nach DIN 34 beachten 05/04/15 Seite 1 Training EPAM and CANopen Basic Solution: Password * * Level 1 Level 2 * Level 3 Password2 IP-Adr.
Presentation transcript:

The Ku-band Network Nara Institute of Science and Technology AI3 Nara NOC Team UMEDA Toshiyuki

The state of Nara NOC s Aug 15-16, All equipment to the new room s Cold Dry and Clean room s All router and modem have few troubles s The new cables are introduced. s The receiving signal power is higher than before

The measurement of the receiving signal power s The signal power from ITB, AIT and NAIST (9/1 - 9/30) s From NAIST is a return signal power s We measured the network unavailable time. s The C/N of the receiving power is under 6dB

The receive signal power s ITB s 761min is under 6dB(C/N) s 98.24% is available s AIT s 250min is under 6dB(C/N) s 99.41% is available

The receive signal power (2) s NAIST s 54.5min is under 6dB(C/N) s 99.87% is available

The signal power chart

The problems s ITB s The receiving signal power is variable s AIT s The receiving signal power is very variable s The receiving signal power is a little low

How to solve the problems s Please ask Mr. Mizuno

s 1 1:13: :00:00 (406.5min) s 1 12:41: :48:00 (7min) s 1 13:05: :12:00 (6.5min) s 20 9:43: :39:30 (56.5min) s 20 17:14: :40:00 (26.5min) s 20 19:27: :28:00 (0.5min) s 22 15:27: :35:30 (8min) s : : 17: : 1min30sec s : : 06: : 30sec s : : : : 57min30sec s : : 16: : 5min s : : : : 163min30sec s : : 19: : 21min30sec