1 Orange Harvester Red B Mockup Presentation October 20, 2005.

Slides:



Advertisements
Similar presentations
The Adventure of Wallie the Watermelon (a childrens story) By Amanda Mastrangelo.
Advertisements

 1  Outline  putaway  pallet storage and retrieval  case retrieval  project.
ENERGY SAVING Product Offering COMPRESSOR MARKETING OPPORTUNITIES.
Design of an Efficient Drying System
Section Red A Mock-up Review 10/20/05 Banana Grabber.
3. 7 MBPF. Orange Juice Inc. produces and markets fruit juice
LAYCO EQUIPMENT BY YARGUS MANUFACTURING
LAYCO EQUIPMENT BY YARGUS MANUFACTURING
Benefits of an Environmental Management System Andrew Frisbie Wabash National Corporation.
Preventing Overexertion Injuries. In this Slide Show  What are overexertion injuries?  How do overexertion injuries occur?  What are the causes of.
Waste Collection. Lesson Objectives  Understand problems and concerns associated with MSW collection.  Compare and contrast privately and publicly operated.
Oranges: crates & labels. History In the late 1800s, the baskets and barrels were used to ship fruit were unsatisfactory for sending oranges by railroad.
NTU-Earthlink Solar Innovations 2004 : Re.Fuse The Challenge: Design a mechanism that is able to separate waste into different categories (paper,metal,glass.
One Rung at a Time Take Ladder Safety One Rung at a Time.
P09713 – FRESH BREAD AND ROLL SCALING ROOM Customer Needs and Product Specifications Senior Design I: Winter Cecilia Enestrom, Kate Gleason,
Fresh Bread and Roll Scaling Room MSD II Final Presentation Erik Webster, Cecilia Enestrom, Kate Gleason, Grant Garbach, Andrew Tsai May 15 th, 2009.
Harvesting and Handling Citrus. Harvesting Methods Manual –Min. Maturity standards (refer Table 1. in MLA’s paper) –Ladders and picking containers –Pulled.
STATUS of 6m ANTENNA BASE Matt Fleming 8/24/04 Note 6m = BIMA.
NGfL CYMRU GCaD ACCESS EQUIPMENT.
Material Transport Systems
INCREASED SAFETY AND PRODUCTIVITY BUTT FUSING HDPE PIPE Jim Craig, P.E. Industry Relations Manager McElroy Manufacturing, Inc.
Answer to Mechanical Advantage Worksheet
Material Handling Material handling is the function of moving the right material to the right place in the right time, in the right amount, in sequence,
Lifting Hazards and some ideas on how to reduce your risk of lifting injury.
Course of MT- 362 Material Handling Lecture # 8.
State of Israel Ministry of Agriculture and Rural Development Plant Protection & Inspection Services (PPIS)
© Business & Legal Reports, Inc Alabama Retail is committed to partnering with our members to create and keep safe workplaces. Be sure to check out.
Ergonomics and Workstation Design Space Requirements
Outline to this Presentation: 1)Description, Features and Benefits 2)Product Info 3)Custom Projects.
Flat Glass Logistics Council May 1, 2003Chicago Council Meeting 1 Flat Glass Logistics Council Issues Chicago, May 1, 2003.
SCLS DELIVERY 2014 Report to the SCLS Board of Trustees Prepared by: Corey Baumann – Delivery Coordinator 12/19/14.
Christina Ferraiuolo KSC Dietetic Intern. BACK PAIN IS THE MOST COMMON HEALTH COMPLAINT  Performing the same improper movements daily may not cause.
Overexertion Injuries What they are How they happen How they can be prevented.
Connecting. The Sending Acts 13:1-3 (p. 1714). The point of worship is not just to experience God in a special time it is to learn to experience God in.
Striving For Safety Excellence HunterDouglas Corporate Environmental, Safety, Risk Management Material Handling July 2011.
DEFINED AS TRANSPORTING OR SUPPORTING OF A LOAD BY HANDS OR BODILY FORCE. Manual Handling.
Infrastructure that Supports the Construction Industry In order for the construction industry to function effectively there is a large amount of infrastructure.
Paper Towels and Hand Dryers BY: Christina Vang, Selina Lor, Ka Houa Xiong, and Chane Chang VS.
Team Red A. Market 500,000 people a year are injured by ladders Approximately 300 ladder related deaths a year In 2006, there were 732,175 construction.
Sketch Model Review Small scale agriculture Tree Trolley.
10/5/ Sketch Models - Red B1 Citrus Picker.
Adoption of efficient waste collection logistic solutions Chris Liebenberg Pr Eng CJLConsult.
Session 1: Initial Steps: Initial Steps: Getting your program off the ground Getting your program off the ground Community Benefits Community Benefits.
MANUAL HANDLING AWARENESS TRAINING COURSE FOR STAFF.
Chapter 8  Work, Power, and Machines. Work  Work- A force acting through a distance.  The distance that the object moves must be in the same direction.
I N T HE N AME OF G OD. T IME T O M ARKET (TTM) W HAT IS TTM ? time to market ( TTM ) is the length of time it takes from a product being conceived until.
Data Management Alternatives. Available Options Online data collection tool (available in August) Data management system formerly known as AFI 2 Other.
FOOD WASTE Alexander Onate. RESEARCH OBJECTIVES Find causes and effects of food waste. Find possible solutions created at the local and nationwide level.
Constraints Space Load Capacity Costs Operating hours.
Physics with Technology
Material handling Defined as the art and science of moving, packing and storing of substances in any form. Creation of time and place utility Movement.
Raymond 4-D Reach-Fork® Truck 7310
Insert Gaia Picture Here
Getting the roller coaster car onto the display in the museum.
Supermarkets ESL Lesson Beginning Level
Book Truck Training Assembled for UTEP Library Technical Services
GOOD HABITS, BAD HABITS? 1- Go through the slides. Are the habits good or bad? 2- Colour the boxes green or red in order to classify the habits into good.
Gleaning in Klamath Falls
High Pressure Water Jetting
Warehousing - A Quick Overview
Mechanical Advantage and Efficiency
The three-point system
Answer to Mechanical Advantage Worksheet
Warm-Up Explain why a mover carrying a box is not doing any work by the physics definition of work.
ACCESS EQUIPMENT.
Preventing Back Injuries Safe Lifting Techniques
Red Team Section A Bunch Muncher.
12.1 Notes, Continued I. Power A. The rate at which work is done.
Fact #1 As the article said the $32 million, 100,000-square- foot recycling center that opened last fall is accepting about five times more rubbish than.
A blimp is flying 500 ft above the ground
Presentation transcript:

1 Orange Harvester Red B Mockup Presentation October 20, 2005

2 U.S. Orange Market Fresh: 2.5 Million Tons (20%) Processed: 10 Million Tons (80%)

3 Baseline Harvesting o Hand picked o Carry bag o Fiberglass ladders o Dump into 1,000 pound box o Fork lift and truck collect box

4 Grove Layout Hedgerow 8’ 15’

5 Product Proposition To assist hand pickers & be faster, more efficient and safer

6 Key Issues 1. Platform and Chute Design 2. System/Process Design 3. Harvesting Rate Improvements

7 Technical Analysis Customer NeedsProduct AttributesEngineering Specs Faster picker than humans alone Eliminate time wasting steps (moving ladders, emptying bag, etc) Develop chute: oranges per hour per person All oranges can be reached Allows workers to climb up into tree and lean out from platform 5 ft pivoting ladder Orange QualityOranges must get to bin without damage Compliant chute used to deliver oranges to bin CleanlinessCan be sterilizedRemovable chute

8 Platform Design

9 Our Mockup  Why did we build it? Spatial understanding of the product Key issues: design and operation  What did we learn? Scale and human interaction Chute tests

10 Mockup

11 Chute Test CanvasFoil Duct

12 Canvas/Duct Chute Foil: Broke apart Canvas: Not rigid Duct: Too fast Solution: Canvas in Duct

13 System Process  Connect platforms into a short train  1 Platform ~ 5 trees  “Quick change” operated by pickers  Reload with empty boxes

Pivoting Stage Wheels Sliding Ramp Rollers Full Field Box on Cart

Wheels Elevated Container Trap Doors on both sides Wheels Open Trap Door Empty Stationary Field Box

21 Rate Improvement CURRENT method PROPOSED method Picking fruit from tree >2 fruit/secSame Getting to FruitClimbing ladderStand on platform Transporting fruit Carry 45lb bag down ladder to stationary field box Fruit sent down chute into field box Overall Productivity ~810 lbs/hourUp to 900lbs/hr ~10% improvement

22 Cost Estimation  Decrease tree height 6 ft = 10% speed improvement  $900 savings/worker/year  Cost/platform < $3500 (pay off in 2 years)

23 Next Steps o Test mechanism for quick change o Increased chute compliance o Pick materials o Wheel size and alignment o Linkage details o Testing

24 Acknowledgments Arizona State University Julian W. Sauls, Ph. D. Donald L. Peterson