PIPELINE FINANCING: LEGAL AND CONTRACTUAL ISSUES 9th Africa Oil and Gas, Trade and Finance Conference and Exhibition Héctor O. FARINA Lawyer Maputo, Mozambique.

Slides:



Advertisements
Similar presentations
+ African Legal Support Facility Negotiations of natural resource contracts : Role of ALSF 2013 African Legal Support Facility Stephen Karangizi Director,
Advertisements

2006 Pan American Health Organization.... Capacity of the National Health Authority to Regulate/Enforce Health Systems Strengthening Seminar Monitoring.
1 Public Economics South African research topics Andrew Donaldson National Treasury August 2009.
Cooperative Arrangements Among Capital Markets Presented to South Asian Federation of Exchanges Conference in Dhaka, Bangladesh February 1, 2008 © 2008.
The new LIFE Programme INFO Day Brussels 12/5/2014 Antongiulio Marin Policy officer – DG CLIMA.
DnB and Brazil Seminar 15 September Why Brazil Vast natural resources and familiar industries Oil and Gas Shipping and ship building Energy Pulp.
EDC’s Approach to Municipal and Regional Government Risk: A Central & Eastern Europe Perspective Lorne Cutler, P.Eng September 2004.
Simon Par Keeling, Société Générale Paris
FINANCING LNG PROJECTS. Contracting for and financing LNG assets April 2006.
1 Fiscal Federalism in Iraq: OIL and GAS. The oil situation: a snapshot.
3 November 2005 GIE Conference Gas Market Developments in SEE Balázs SÁNDOR Chairman GIE ECSEE Study Group Athens - 3 November 2005.
Framework for Port Reform
CEDA Presentation Role of PPPs, JV Partnerships, in fast tracking FDI attraction and growth of exports by Botswana as well as financing and JV Partnerships.
Guido Pier Paolo Bortoni President of Italian Regulatory Authority for Electricity Gas and Water (AEEGSI) UNIVERSAL ENERGY ACCESS A Focus on Universal.
The World Bank Group Instruments. The World Bank World Bank Group financing and risk mitigation instruments IBRD/IDA MIGAIFC IBRD Loan for middle income.
Overview Summary from Africa and ASEAN assistance Dr. Peter Pembleton, UNIDO.
1 Georgian National Energy and Water Supply Regulatory Commission Tariff Regulation Gocha Shonia Department of Methodology and informational provision.
“Why do business in Panama?” A Survey of Certain Legal Aspects David M. Mizrachi This document is not meant to be relied upon in place of seeking independent.
The economic regulation of gas processing services Key issues and initial thoughts Ofgem presentation 18 June 2007.
International Conference on Enhancing the Effectiveness of Deposit Insurance Operation, Hanoi March, 2007 The Legal Architecture of Deposit Insurance Systems.
NIGERIA’S FINANCIAL SYSTEM STRATEGY 2020 PERSPECTIVES ON BUILDING AN INTERNATIONAL FINANCIAL CENTRE: EXPERIENCE OF SINGAPORE.
Financing Urban Public Infrastructure
23/08/20151 European Investment Bank EUROPEAN INVESTMENT BANK Urban Development Projects 29 th May 2009 Barbara Lemke Urban Planner Projects Directorate.
1 The Regulatory Approach to Fostering Investment David Halldearn Ofgem 28 September 2006.
The comparison of financial institutions, markets & instruments in China & US and the possibility to set up a deposit insurance system in China Fang Ji.
MAY 2015 CORPORATE OVERVIEW Supporting the International Development Sector.
Chapter 14 Public Sector and Policy
BEHIND THE BORDER ACTIONS AND APEC THE CASE OF INDONESIA Presented by Pos Hutabarat, PhD Ministry of Trade Republic of Indonesia.
ENHANCING THE POLICY FRAMEWORK FOR SUSTAINABLE ENERGY INVESTMENT Guidance from the OECD to developing and emerging economies Karim Dahou, Investment Division,
Why are economic and financial instruments needed? A presentation made by Noma Neseni, IWSD.
1 International Conference on Enhancing the Effectiveness of Deposit Insurance Operation, Hanoi March, 2007 ENHANCING THE LEGAL FOUNDATION FOR DEPOSIT.
Promoting indigenous entrepreneurs in the upstream sector: policies and practices Lamon Rutten Chief, Finance and Energy UNCTAD 9 th African Oil&Gas Trade.
OVERVIEW OF CAPITAL MARKET DEVELOPMENT IN THE LAC REGION Carolin A. Crabbe Infrastructure and Financial Markets Division INTER-AMERICAN DEVELOPMENT BANK.
Budget measures: EDC’s implementation BCAP Committee meeting Toronto, April 2 nd, 2009.
BG Group Managing Risks and Seizing Opportunities for Local Companies in the Oil & Gas Sector pre-UNCTAD XI Perspectives for the Gas Sector in Brazil Luiz.
The Draft SADC Annex on Trade in Services UNCTAD Secretariat Sub-regional Conference on Improving Industrial Performance and Promoting Employment in SADC.
E P D K 1 Turkish Electricity Market and Recent Developments Cemal Çelik Energy Expert EMRA-TURKEY March ANTALYA.
Dr. Ion LUNGU AFEER President. DRIVERS FOR INVESTMENTS Demand; Fuel availability; Market signals; Production costs; Energy mix; Environmental concerns;
Doing Business With OPIC. OPIC’s Mission Statement “To mobilize and facilitate the participation of the United States capital and skills in the economic.
Regulatory Institutions in Turkey. Regulatory Institutions Central Bank of Turkey Banking Supervision and Regulatory Institutions Capital Markets Board.
International Seminar on Energy Cooperation in Northeast Asia : Directions and Implementation Korea Energy Economics Institute Financing of Energy Infrastructure.
1. Main types: 1. Formal International and Supranational Organizations -WTO: the world trade agreements provide for binding obligations of the Member.
The Role of Peer Review in a Multilateral Framework on Competition Policy Andrea Bruce Investment Trade Policy UNCTAD Regional Seminar for Latin America.
1 10th African Oil & Gas Trade & Finance Conference Algiers, Algeria 2-5 April 2006 Theodore Ahlers Director, Maghreb Department World Bank Middle East.
IFC’s Financing Instruments. IFC’s Mission To promote sustainable private sector investment in developing countries, helping to reduce poverty and improve.
1 Belarus CEM Discussions Energy Sector Stable sector structure and governance over the past decade together with recent macro economic performance of.
PPP Legal & Regulatory Framework. PPP Policy In July 2008 GOK approved the PPP policy directive through which: PPPs are identified as a method for investing.
Challenges in WTO Accession —The case of Vietnam By Cristina Hernandez (UNDP-MPI Project VIE/02/009) World Bank Training Course “ Trade in Services and.
International Banking. Description Cross border cross country facet of banking business May not necessarily own or hold a physical presence offshore Traditional.
PRESENTATION TO PORTFOLIO COMMITTEE ON WATER AFFAIRS AND FORESTRY Cindy Damons 28 May 2008 The role of municipalities in managing and giving effect to.
Welcome To Invest in Timor-Leste
CORPORATE GOVERNANCE Corporate Governance. What is Corporate Governance ? Corporate Governance refers to the structures & processes for the efficient.
Paola Lucantoni Economic and Financial Market Law.
INTERNATIONAL FINANCE Lecture 6. Balance of Payment (Accounting of transactions) – Current Account – Capital Account Current Account (Purchase Summary)
MEDEF MEETING March 7, 2012 A.T. Shaukat Chief Engineer Global Infrastructure & Natural Resources.
Обдуманные ходы Эффективные решения PPP as a mechanism for infrastructure formation in Kazakhstan: legal aspects
ROMANIA NATIONAL NATURAL GAS REGULATORY AUTHORITY Public Service Obligations in Romanian Gas Sector Ligia Medrea General Manager – Authorizing, Licensing,
Office of Legal Affairs
UNCITRALThird International Colloquium on Public-Private Partnerships (PPPs) October 2017, Vienna Experts for Chapter IV October 2017.
Module 8 : Implementing Port Reform
Overview of the New Mexican Energy Model
ASEAN PPP Summit The Public-Private Partnership Model and
Chapter 5 The International Financial, Political, and Legal Environment.
The Changing Landscape for Renewable Energy Financing and Support
progress of the water reform in bulgaria
The Government Role in BOT
a. Financing b. Designing c. Construction d. Operating
Developing the power sector in Federal Nepal Main lessons from international experience Kathmandu, November 06, 2018.
Summary from Africa and ASEAN assistance Dr. Peter Pembleton, UNIDO
FAR part 1.
Presentation transcript:

PIPELINE FINANCING: LEGAL AND CONTRACTUAL ISSUES 9th Africa Oil and Gas, Trade and Finance Conference and Exhibition Héctor O. FARINA Lawyer Maputo, Mozambique June 1 st, 2005 NOT AN OFFICIAL UNCTAD RECORD

2 © Haarmann Hemmelrath Oil & Gas: Market Segments  Exploration and production  Treatment and processing  Storage  Transport (pipelines, ships and wires)  Oil & Gas to power  Oil & Gas retail (industrial, commercial and residential)  Export

3 © Haarmann Hemmelrath Pipeline Market Opportunities (I) Oil and Gas Pipeline Production City gate/ Oil & Gas Terminal PIPELINE Negociated access Regulated access Pipeline Destination

4 © Haarmann Hemmelrath Pipelines Market Opportunities (II) (Gas Sector)

5 © Haarmann Hemmelrath Cross-Border Pipeline Challenges (I) Institutional Issues  Different and possibly conflicting laws and regulations among countries could impact the viability of the project  Subject to changes in the relations between the countries  Cross ownership on the various parts of the pipeline requires strategic and operational coordination to operate the pipeline as a single integrated facility  Risk of lack of coordination of objectives between host countries  Compatible institutional, legal, and regulatory framework for the management of cross-border pipelines in various countries

6 © Haarmann Hemmelrath Cross-Border Pipeline Challenges (II) Economic Issues  Assets in various countries vs cash flows generation in one country  Differences between oil and gas pipelines because the gas market does not have the flexibility and efficiencies of the oil market and requires a distribution network for wholesale clients such as power generators or industrial clients  The base-load revenue driver for the cross border gas pipeline in Africa is the power sector. Therefore the domestic electricity infrastructure and regulation of the electricity sector in the “downstream” markets should be well developed

7 © Haarmann Hemmelrath Cross-Border Pipeline Challenges (III) Financial Issues  Lenders must be ensured that as long as the pipeline is operating properly, revenue will be available to make debt service payments even if the natural gas market do not develop as expected through a long term ship or pay contract  Special attention to all factors that can affect the cash flow in particular upstream (sufficient gas proven reserve) and downstream (gas distribution network,electricity gas generator)  Competition from other pipes and other gas reserves  Competitivity of gas with other sources of energy in the downstream market

8 © Haarmann Hemmelrath Pipelines: Developing Projects  Projects: Supported by a modern legislation and, where appropriate, adopted regulation.  Contractual arrangements: tailored to fit the project.  Financing: Structuring the financing around the project’s cash flows  Operations: Highly qualified operators regulated in a transparent way for the benefit of the consumers and the economy.

9 © Haarmann Hemmelrath Roles of the Participants in Pipeline Projects Development Governments (National, Regional and Local Authorities) Policy maker for Energy sector Enacts laws and decrees Regulatory Authorities (Dedicated Agency, Multisectoral Agency) Enacts regulations Conducts the bidding process Private and Public Companies (Sponsors, Banks and financial Institutions) Participates in tenders Operates  Economic Context  Market Maturity and Organization  Number of Operators  Existing Alternatives  Regional situation and constrains  Backdrop  Appropriate Legal Framework  Regulations in place  Market Analysis  Procedures for Bidding process  Contractual Documentation  Needs  Capital  Financial Support  Technical and Legal Support  Guarantees against Commercial and Political Risks

10 © Haarmann Hemmelrath Legal Aspects (I) The interest of Energy Sector Framework Laws for the Development of Pipeline Systems THE OIL & GAS UPSTREAM ACTIVITIES THE ELECTRICITY ACTIVITIES THE PIPELINE ACTIVITIES THE OIL DOWNSTREAM ACTIVITIES THE GAS DOWNSTREAM ACTIVITIES THE ENERGY FRAMEWORK LAWS COVERS:

11 © Haarmann Hemmelrath Legal Aspects (II) The Pipeline Law GENERAL PROVISIONS FINAL PROVISIONS AUTHORIZATION FOR THE CONSTRUCTION AND OPERATION OF PIPELINES RIGHTS AND OBLIGATIONS OF COMPANY OPERATION OF PIPELINES:CONTROL AND SANCTIONS FINANCIAL, TAX AND CUSTOMS PROVISIONS The principle of authorization The procedure for granting authorizations The renewal modification, transfer abandonment, suspension, withdrawal of authorizations Financial regulations Temporary importation Controlling of pipelines Operation of pipelines Powers of the authorization holder Occupancy of national and municipal domain Accounting Tax regime Occupancy and acquisition of private lands General obligations of companies Environment, public health, safety, security THE PIPELINE LAW CONTAINS

12 © Haarmann Hemmelrath Legal Aspects (III) Pipeline Access Regulation Stages of market maturity EMERGINGDEVELOPEDMATUREACHIEVED DEVELOPMENT Main policy objectivesProject Development Infrastructure Development Industry Regulation Industry Segmentation RegulationAims at creating interest for investors Aims at developing networks Aims at opening the access and reducing costs to the benefit of consumers Aims at performing competition Country examplesCentral America Peru Cameroon Brazil Venezuela Argentina South Africa Canada New Zealand United Kingdom USA

13 © Haarmann Hemmelrath Contractual Issues (I)  Intergovernmental treaty Sets out relationship between states Sets out rights to be granted to investors  IGA ratified by law in host states

14 © Haarmann Hemmelrath Contractual Issues (II)  Host government agreements Set out detailed rights of investors Set out applicable tax regime for pipeline Set out obligations of state and investors Set out uniform standards to be applied for project  HGAs ratified by states, creating prevailing legal regime

15 © Haarmann Hemmelrath Contractual Issues (III) Sound Contractual Arrangements  Firm transportation contracts during the life time of financing  Payment in hard currency for firm capacity must represent most of the long term cash flow of the project  Additional investment to increase the capacity will be made once secured by related transportation agreements  Creditworthiness of the shippers  Direct agreements of host Governments when possible

16 © Haarmann Hemmelrath Financial Issues (I) Lenders Requirements  Assured Completion with EPC contract  Adequate Security Package  Offshore accounts  Cash Water Falls  Avoidance of currency and interest rate risks

17 © Haarmann Hemmelrath Financial Issues (II) Risk Prevention RESIDUAL RISK FINANCIAL RISK POLITICAL RISK OPERATION AL RISK GUARANTEES / INSURANCES PERFORMANCE BONDS MARKET RISK LONG TERM CONTRACTS DUE DILIGENCES CONSTRUCTION & TECHNICAL RISK/DELAYS TURN-KEY CONTRACTS GUARANTEES AND FINANCIAL/MULTILATERAL AGENCIES AND GOVERNMENT LEGAL AND REGULATORY RISK PROJECT FINANCING (Local Financing)

18 © Haarmann Hemmelrath Legal Regulatory Framework and Contractual Arrangements LEGISLATION Modern, and covering the main issues to facilitate the smooth realization of projects in the gas sector Adapted to market maturity Taking into account local laws and institutions, even in the case of the application of foreign laws and jurisdictions REGULATION CONTRACTUAL ARRANGEMENTS

19 © Haarmann Hemmelrath Conclusion  Stable political environment  Sound economic environment  Committed policy of liberalization  Absence of Civil unrest  Appropriate investor protection policies  Established legal framework  Clear institutional organization  Modernization of legislation to facilitate the contractual arrangements Are the prerequisites for

20 © Haarmann Hemmelrath Conclusion A Good Flow of Projects