Operational Experience with machine backgrounds at KEKB 23 September 2003 T.Tsuboyama (KEK)

Slides:



Advertisements
Similar presentations
Proposal for a new design of LumiCal R. Ingbir, P. Ruzicka, V. Vrba October 07 Malá Skála.
Advertisements

Beam-plug and shielding studies related to HCAL and M2 Robert Paluch, Burkhard Schmidt November 25,
H1 SILICON DETECTORS PRESENT STATUS By Wolfgang Lange, DESY Zeuthen.
December 10, 2008 TJRParticle Refrigerator1 The Particle Refrigerator Tom Roberts Muons, Inc. A promising approach to using frictional cooling for reducing.
Upgrade Plan of KEKB Vacuum system Pre-kickoff KEK1 Y. Suetsugu KEKB Vacuum Group Contents Challenges for vacuum system Designs for.
Background issues in the KEKB
Interaction region design and construction for BEPCII C. H. Yu IHEP Feb.4, 2007.
Super-B Factory Workshop April 20-23, 2005 Super-B IR design M. Sullivan 1 Status on an IR Design for a Super-B Factory M. Sullivan for the Super-B Factory.
Current BG Status at Belle Osamu Tajima ( Tohoku univ ) Assumption in this talk 100days-operation / yr 1nTorr CO pressure in simulation HER / LER = 1.1.
PEP-II B Factory Machine Status and Upgrades John T. Seeman for the PEP-II Staff SLAC DOE Site Review April 9, 2003.
Super-B Factory Workshop January 19-22, 2004 Beam pipes M. Sullivan 1 Detector Beam Pipe Diameter Discussion M. Sullivan Super-B Factory Workshop Hawaii.
June 2-4, 2004 DOE HEP Program Review 1 M. Sullivan for the PEP-II Team DOE High Energy Physics Program Review June 2-4, 2004 PEP-II Status and Plans.
Super-B Factory Workshop January 19-22, 2004 IR Upgrade M. Sullivan 1 PEP-II Interaction Region Upgrade M. Sullivan for the Super-B Factory Workshop Hawaii.
Striplet option of Super Belle Silicon Vertex Detector Talk at Joint Super B factory workshop, Honolulu 20 April 2005 T.Tsuboyama.
F.Brinker, DESY, July 17 st 2008 Injection to Doris and Petra Fitting the detector in the IP-region Radiation issues Beam optic, Target cell Polarisation.
Super-B Factory Workshop January 19-22, 2004 Accelerator Backgrounds M. Sullivan 1 Accelerator Generated Backgrounds for e  e  B-Factories M. Sullivan.
Prepare DORIS for particle physics again F.Brinker, DESY, March 31 st 2008 Injector chain to Doris and Petra Situation at the IP-region Beam optic Work.
The Belle SVD Trigger  Tom Ziegler  Vertex 2002  Kailua-Kona, Hawaii, 4-8 th nov The Belle SVD Trigger Tom Ziegler on behalf of the Belle SVD.
Super-B Factory Workshop January 19-22, 2004 Super-B IR design M. Sullivan 1 Interaction Region Design for a Super-B Factory M. Sullivan for the Super-B.
Synchrotron Radiation (SR) in Super-KEKB / Belle Osamu Tajima ( Tohoku univ )
13 Dec MAC Review – Future IR Heating Issues 1 Future IR Heating Issues 13 December 2004 Stan Ecklund.
Vacuum Pressures at IR Contents Y.Suetsugu KEKB Vac. Group 1.Outline of Vacuum System at IR 2.Behavior of Pressures 3.Remedies for Heating of Vacuum Components.
Radiation-protection experience at Belle / summary of beam abort system 22 September, 2003 T.Tsuboyama (KEK)
SuperKEKB to search for new sources of flavor mixing and CP violation - Introduction - Introduction - Motivation for L= Motivation for L=
Background Issues: Real Time Radiation Measurement S.M.Yang EPC.IHEP Mini-Workshop on BEPCII Background Study March 2008 Institute of High Energy.
Karsten Büßer Beam Induced Backgrounds at TESLA for Different Mask Geometries with and w/o a 2*10 mrad Crossing Angle HH-Zeuthen-LC-Meeting Zeuthen September.
Detector Backgrounds in the HERA ep-Colldider F. Willeke, BNL October 9, 2012.
Design of electrostatic septum for slow extraction from J-PARC main ring 2005, March 2nd ICFA septa workshop 2005 Acc. Lab., KEK M. Tomizawa, Y. Arakaki,
SHMS Optics and Background Studies Tanja Horn Hall C Summer Meeting 5 August 2008.
1/18 The Distribution of Synchrotron Radiation Power in the IR C. H. Yu IR Overview SR Distribution in the IR The Protection of SR Power.
Scintillation hodoscope with SiPM readout for the CLAS detector S. Stepanyan (JLAB) IEEE conference, Dresden, October 21, 2008.
Xiao-Yan Zhao Beam Instrumentation Group Accelerator Center, IHEP BEPCII Background Issues: Beam Loss Measurement.
Super-Belle Vertexing Talk at Super B Factory Workshop Jan T. Tsuboyama (KEK) Super B factory Vertex group Please visit
PID for super Belle (design consideration) K. Inami (Nagoya-u) - Barrel (TOP counter) - Possible configuration - Geometry - Endcap (Aerogel RICH) - Photo.
Simulation of Beam-Beam Background at CLIC André Sailer (CERN-PH-LCD, HU Berlin) LCWS2010: BDS+MDI Joint Session 29 March, 2010, Beijing 1.
Page 1 Overview and Issues of the MEIC Interaction Region M. Sullivan MEIC Accelerator Design Review September 15-16, 2010.
LCWS2004 Paris 1 Beam background study for GLC Tsukasa Aso, Toyama College of Maritime Technology and GLC Vertex Group H.Aihara, K.Tanabe, Tokyo Univ.
Integrated Radiation Measurement and Radiation Protection of BES Ⅲ Zhang Qingjiang, Wu protection group, accelerator center, IHEP,
The 21st International Conference on Ultrarelativistic nucleus-nucleus collisions, March 30 – April 4, Knoxville, TN Results from cosmics and First LHC.
BES-III Workshop Oct.2001,Beijing The BESIII Luminosity Monitor High Energy Physics Group Dept. of Modern Physics,USTC P.O.Box 4 Hefei,
Apollo Go, NCU Taiwan BES III Luminosity Monitor Apollo Go National Central University, Taiwan September 16, 2002.
Tsukuba-hall webcam 1 Beam Pipe and Vertex Detector extraction: on Nov. 10, 2010 Belle Detector Roll-out: Dec. 9, 2010 End-caps, CDC, B-ACC, TOF extraction:
D0 Status: 04/01-04/08 u Week integrated luminosity –1.7pb -1 delivered –1.5pb -1 utilized (88%) –1.1pb -1 global runs u Data collection s global data.
ILC MDI workshop January 6-8, 2004 PEP-II IR M. Sullivan 1 Interaction Region of PEP-II M. Sullivan for the ILC MDI workshop January 6-8, 2005.
Interaction Region Backgrounds M. Sullivan for the MEIC Collaboration Meeting Oct. 5-7, 2015.
The development of the readout ASIC for the pair-monitor with SOI technology ~irradiation test~ Yutaro Sato Tohoku Univ. 29 th Mar  Introduction.
Experimental Study of the BEPC Ⅱ Backgrounds JIN Da-Peng IHEP, Beijing, China Representing the Backgrounds Study Group May 11, 2007, BEPC Ⅱ IMAC Meeting.
1 Fast kicker study Machine Time 2011/10/18~10/29(2 weeks) TB meeting 2011/01/14 T.Naito.
ILC IP SR and PEP-II M. Sullivan for the ILC IR engineering workshop IRENG07 Sept 17-21, 2007.
9 October 2003S. DeBarger PEP-II Vacuum Status PEP-II Machine Advisory Committee.
Beam Background Simulation at Belle/KEKB Motivation SR background Particle background Feedback to the detector design SR alarm Summary O. Tajima (Tohoku.
Present status of production target and Room design Takashi Hashimoto, IBS/RISP 2015, February.
Initial Study of Synchrotron Radiation Issues for the CEPC Interaction Region M. Sullivan SLAC National Accelerator Laboratory for the CEPC14 Workshop.
Study of the MPPC for the GLD Calorimeter Readout Satoru Uozumi (Shinshu University) for the GLD Calorimeter Group Kobe Introduction Performance.
Beam abort in KEKB and Background measurement by SVD 8 Feb T. Tsuboyama (KEK)
E+/e- Backgrounds at BEPCII/BESIII JIN Dapeng Aug. 22, 2011.
Synchrotron Radiation Absorption and Vacuum Issues in the IR at PEP-II and a Higgs Factory John Seeman, SLAC October 11, 2014 HF2014 Beijing.
JLEIC MDI Update Michael Sullivan Apr 4, 2017.
M. Sullivan SuperB General Meeting Perugia, Italy June 15-20, 2009
KEK news ( ) S.Tanaka.
M. Sullivan International Review Committee November 12-13, 2007
The Interaction Region
Final Focus Synchrotron Radiation
Introduction to the Backgrounds Study in the BEPCⅡ/BESⅢ
The PEP-II Interaction e+e- Factories Workshop
Francesco Forti SuperB Workshop LNF, March, 2006
Interaction Region Design Options e+e- Factories Workshop
Accelerator R&D Results from the B-factory
Some of the Points Raised During my JLAB Visit
IR/MDI requirements for the EIC
Presentation transcript:

Operational Experience with machine backgrounds at KEKB 23 September 2003 T.Tsuboyama (KEK)

History KEKB/Belle operation started in May Various background sources were identified in the first 3 months. Major Belle/KEKB modification against background was done in Silicon vertex detector (SVD) has been replaced four times in 5 years operation. –SVD1.0: 1998 Winter: installation of : 3 layers, 1.4  m VA1 readout chip. –May 1999: Commissioning of KEKB/Belle –1999 Summer --- VA1 chip was damaged by Synchrotron radiation: Installation of SVD1.2. The IP (interaction point) chamber was wrapped with 10  m-thick gold foil. –2000 summer --- Installation of SVD1.4 (With 0.85  m VA1) –2002 October --- Vacuum leak happened in the IP chamber. IP chamber was replaced with old one. Bad SVD ladders were also replaced (SVD1.6). –2003 Summer ---- SVD2.0(4 layers, 0.35  m VA1TA, fast trigger capability) The other detectors have not been damaged seriously.

Particle background Belle experienced huge particle (shower) background. There are holes parallel to the beam direction. The hole just out side of the vacuum chamber resulted in shower around SVD and CDC. The hole close to the end-cap detector resulted in large background at the low- angle end cap CsI.

Interaction region/Belle

Background to forward CsI Background to CsI Widening of energy pedestal level was clearly observed in the forward region. Forward Region

Adding particle masks Adding masks to vacant spaces to stop the stray particles.

X ray from HER Low energy synchrotron radiation –Synchrotron radiation from steering magnets in the upstream of HER beam destroyed the front end chips of SVD in one week. –Because of the long HER strait section, generated photons can not be stopped out side of Belle. The beryllium chamber was wrapped with gold foil. (In 2000 summer, an IP chamber with 10-  m thick gold (spattering) was installed.) Limits were set to current of the corresponding magnets. High energy (30 keV) synchrotron radiation –HER synchrotron light scattered back from the down-stream chamber (crotch for LER/HER separation) made of aluminum caused large occupancy in CDC and SVD. The chamber was replaced with one made of cupper that has smaller reflection coefficient. The chamber shape were changed to make crotch farther from the IP chamber to reduce the solid angle. X ray energy spectrum measured by CDC

Reflection of synchrotron radiation The synchrotron light from the final focus system hit the aluminum chamber and the reflected X ray entered to Belle. The aluminum chamber was replaced with cupper chamber and the synchrotron dump is made further. Cupper chamber Aluminum chamber

Result of operation The low energy X ray from upstream steering magnet disappeared. Effect of reflected X ray also significantly reduced. Limits were set to the HER magnets. Synchrotron radiation from HER upstream magnets. This killed SVD The downstream chamber is replaced with a cupper chamber

Current status KEKB Vacuum system SVD (silicon vertex detector) CDC (central drift chamber) CsI (CsI calorimeter) Trigger (Trigger rate)

Improvement of Vacuum The vacuum of KEKB has been improving as shown in the figures. –The horizontal axis shows the beam dose since the beginning of KEKB operation. The KEKB vacuum group is responsible for –Operation and maintenance of vacuum system –Replacing broken bellows, broken masks. –Designing and replacing vacuum components that are heated/damaged by beam. –Complex chamber design around the interaction region (IR). HOM heat in chamber and bellows, beam monitor, radiation shield, synchrotron light absorber, cooling, strange-shape final focus magnets, photoelectrons …. should be taken into consideration. Owing to these efforts, the background to Belle has been kept at an acceptable level.

Accelerator operation Vacuum-related backgrounds are going down with vacuum improvement. A single-beam study [KEKB NIM paper, 2002] suggests the particle is not the dominant BKG source. Test of Touschuk effect was done in June. LER beam bunch size was artificially increased and background/beam life was measured. Touschek contribution is not dominating the background. (Thanks to large momentum aperture of KEKB)

Summary of HER burst. Background burst: The HER beam lifetime decreases significantly for short time. Belle subsystem receive backgrounds. Usually, hardware abort level is not exceeded. Total dose per burst is usually smaller than 1 rad/sec. CDC HV system has high-speed current limitters. Therefore, HV power supply (LeCroy) does not trip. While the current limiter is active, the data taking is paused. CsI/ACC/TOF systems have not tripped by background burst. This phenomenon does not happen to LER.

Snapshot of the KEKB operation for best day

Silicon vertex detector Layer-1 SVD front end chips suffered about 0.9 Mrad dose. The gain of the preamplifier decreased by 25 % accordingly. In December 2002, bad ladders were replaced and Gain recovered with intense tuning of the VA1 operation parameters. Improvement of KEKB luminosity is faster than the dose accumulation to SVD.

RADFET position dependence Black – Bottom Green – Inside the KEKB ring Blue – Top Red – Outside the tunnel

Central Drift Chamber Although the KEKB has increased the luminosity and beam current, wire current of CDC has been kept in operational range. This is a result of the continuous improvement of the vacuum. The cathode part is close to limits, however, it was replaced with a small-cell drift chamber this summer. CDC Layer # Hit rate/wire(kHz) Spring 2003 HER 1.1A LER 1.5A L=9.6x10 33 cm -1 s -1 Main Inner Cathode

The integrated dose and PIN-diode dark current is shown The integrated dose is slower than beam current/luminosity increase. The occupancy for E>20MeV activity is ~1 cluster/event at 5x10 33 /cm 2 2/sec luminosity. CsI calorimeter Forward Backward Barrel

5% loss 10rad 100rad 2% loss CsI calorimeter (cont.) Light output yield is decreasing. The barrel part can survive ~100 times dose than now. 10% loss 1krad

Trigger/DAQ/dead time Dead time reaches ~10% at 500 Hz trigger rate. The average trigger rate is still around 400 Hz.

Continuous injection (CI) In March 2003, we did a study of continuous injection –Tthe LER CI is and HER CI gives large noise to Belle. A similar test was done in end of June. –This time LER injection is worse than HER. Injection rate was 5-10 Hz. Trigger is vetoed for 3.5 msec. at each injection. –Dead time due to CI 3.5 % –The autumn run will be done in CI mode.

Summary of CI (June 30)

Injection summary

Sub detectors TOF --- At each injection input voltage becomes 1-15 V (MIP=0.2V). This noise level is within the tolerable range (In a previous test, the preamplifiers saturated. Preamplifiers were replaced with signal-cramping capability) ACC(PID) Occupancy and N(photon) KLM

2003 Summer shutdown The CDC inner part (cathode-pad read out) is replaced with a small-cell drift chamber. –Z-trigger capability from cathode pads is lost. SVD1.6 is replaced with SVD2.0 –4-layers. Provides fast Z-trigger from the front-end chips. New IP chamber made of Tantalum and Tungsten (total weight of 40 kg). Acceptance region is made of mm thick, 15mm inner-radius Beryllium chamber, cooled with circulation of normal-paraffin in the 0.5 mm gap. Particle backgrounds should be effectively stopped. (Talk by O.Tajima on Wednesday)

2003 Summer shutdown (cont.) Replacement of accelerator chambers next to Belle –HOM heating in the chamber and the bellows has limited the KEKB beam current. –The chamber was replaced with smoother-shape chamber and more cooling capability.