Overview of the Improved MTN project Geoff Molloy Communications and Computing Branch Bureau of Meteorology Australia.

Slides:



Advertisements
Similar presentations
RMDCN Technical Solution
Advertisements

An outline of the GTS & the Improved MTN project for FWIS By Hiroyuki Ichijo Japan Meteorological Agency ISS/ITT-FWIS 2003 (Kuala Lumpur, October.
Status of Implementation at RTH Tokyo By Hiroyuki Ichijo Contents Contents 1. GTS facilities 2. GTS circuits 3. Use of the Internet 4. Collection of SHIP.
Slide 1 ET-CTS - GISC Network Bandwidth RequirementsSlide 1 GISC network bandwidth requirements A proposed method for an educated guess… Hiroyuki Ichijo.
RMDCN-TT report Matteo Dell’Acqua Meteo-France
RTH AND NMC FUNCTIONS FOR GTS INFORMATION EXCHANGE T.K.RAY RTH,NEW DELHI,INDIA E Training Seminar on information and communication.
IMTN and managed data network services Technical Conference on the WIS (Seoul, 6-8 November 2006) Hiroyuki ICHIJO (Japan Meteorological Agency.
November 2006 TECO-WIS, Seoul 1 Definition of the Internet Network of networks –millions of smaller domestic, academic, business, and government networks.
1 World Meteorological Organization Report to WG-PIW RA VI September 2008 Presented by David Thomas (PM-WIS) WORLD METEOROLOGICAL ORGANIZATION Weather.
1 Role of RTH Beijing in exchanging tsunami-related information and Status of the GTS system at RTH Beijing National Meteorological Information Center,
Current Status of Implementation of MTN at RTH Beijing Li Xiang National Meteorological Information Center, CMA.
Case Study of IMTN Network B with A ET-IMTN 2001 ( Geneva, June 20 to 23, 2001) By Hiroyuki Ichijo Office of International Communications,JMA.
The WMO Information System (WIS)
1 World Meteorological Organization WMO Information System WORLD METEOROLOGICAL ORGANIZATION Weather – Climate - Water J.-M. Rainer, Chief ISS Division.
Managing & Moving Weather, Water and Climate Information in the 21 st Century WMO Information System (WIS) 4 th WCRP Observations and Assimilation Panel.
1 © 2004, Cisco Systems, Inc. All rights reserved. WAN Technologies Based on CCNA 4 v3.1 Slides Compiled & modified by C. Pham.
WAN Technologies. Objectives WAN Technologies Overview WAN Technologies WAN Design.
Data Communications and Networks Chapter 2 - Network Technologies - Circuit and Packet Switching Data Communications and Network.
Lecture Note No.5 TRAINING SEMINAR ON INFORMATION AND COMMUNICATION TECHNOLOGY FOR THE GTS (((( Improved RMTN/RMDCN for RAII The IMTN (Improved MTN) The.
Outlines Received due 13 March 24 %. Homework n Review for Midterm on 1 March 2000 n Research Paper n Readings [11] “ATM Systems: What’s Next?” [12] “Long.
Report on the Improved RMTN project Contents 1. Background 2. Status of progress of the improved RMTN 2.1 Implementation of circuits 2.2 Migration to TCP/IP.
CMA’s new GTS system Submitted by YANG Genlu, China
1 World Meteorological Organization AR report to ADC May 2008 Presented by David Thomas (WMO) WORLD METEOROLOGICAL ORGANIZATION Weather – Climate.
1 World Meteorological Organization AR report to ADC September 2008 Presented by Don Middleton (NCAR), on behalf of WIS and Dave Thomas, Jean-Michel.
The WMO Information System (WIS)
Gianni,José Luis. COUNTRYCITYCIRCUIT TYPESPEEDTRANSFER PROTOCOL EXCHAN GE DATA REMARKS USA Washington (WMC) Leased Line 64K TCP/IP SOCKETS A/N,GRIB T4.
Status of the Global Telecommunication System connected with RTH Tokyo Japan Meteorological Agency Presented by Masahiro Kazumori Eighth Meeting on Asia-Pacific.
Joint ICM GTS-WIS MTN & ET-OI Sep Joint ICM on the GTS-WIS MTN and ET-OI meeting Kelvin Wong CBS ET – OI Co-chair RTH Focal Point WMC Melbourne.
Features of the new TCP/IP link between HK and Beijing (Guangzhou) Features of the new TCP/IP link between HK and Beijing (Guangzhou) Justin Waiman MA.
Status on RTH Tokyo (Item 2.1) By Hiroyuki Ichijo By Hiroyuki Ichijo Expert Meeting on the Exchange of Early Warning and Related Information Including.
STATUS OF IMPLEMENTATION AT RTH BEIJING SHI Peiliang, China
Status of the Global Telecommunication System connected with RTH Tokyo Sixth Meeting on Asia-Pacific Satellite Data Exchange and Utilization (APSDEU-6)
MD RMDCN within RA VI – status and perspectives CBS/ET-IMTN, June 2001 RMDCN within RA VI - status and perspectives - Matteo Dell’Acqua ECMWF.
Bureau of Meteorology Update Anthony Rea National Manager Composite Operations (with kind assistance from Gary Dietachmeyer, Christopher Down and Kelvin.
Symposium on Multi-Hazard Early Warning Systems for Integrated Disaster Risk Management Fred Branski, Team Leader for Data Management NOAA’s National Weather.
WIS data-communications functions and services, and implementation Progress report on Expert Team on WIS-GTS Communication Techniques and Structure (ET-CTS)
Mr. Mark Welton.  WAN transportation method that formats data into frames and sent over a network controlled by a service provider  Frame Relay is often.
SEOUL, S. KOREA PYONGYANG, N. KOREA KUALA LUMPUR, MALAYSIA
Training Seminar on ICT for GTS (Bangkok, September 2002) - Slide 1 Organisation principles of the GTS.
RA5 ISS MEETING WIS-GTS Honolulu, Hawaii 2-5 Dec 2009 Bryan Hodge Observational Network Data Communications Manager.
1 © 2004, Cisco Systems, Inc. All rights reserved. CCNA 4 v3.1 Module 2 WAN Technologies.
Status of RTH Tokyo Japan Meteorological Agency Presented by Tatsuya Noyori Expert Team on WIS-GTS Communication Techniques and Structure (TOULOUSE, France,
Status of RTH Tokyo Japan Meteorological Agency Presented by Kenji Tsunoda Joint implementation-coordination meeting on the GTS-WIS MTN and meeting of.
Status of Implementation TCP/IP at RTH Beijing NMIC, CMA.
Status of the GTS connection to RTH Tokyo Eleventh Meeting on Asia-Pacific Satellite Data Exchange and Utilization (APSDEU-11) (Boulder, USA, 02 to 06.
Asia Pacific International Data Services Pricing & Analysis ‘Pricing Is Key’ © 2005 Frost & Sullivan. All rights reserved. This document contains highly.
(CBS/OPAG-ISS ) November 2007 Washington, USA
Status and Plans of RMTN in RA V (For report to ICT-ISS Sep 2010)
GISC Tehran Status Feb, 2016 TT-GISC 2016-Doc18.
Automation of NMCs for GTS operation
WIS Implementation Status in RA II
Status Report of GISC Beijing
GISC PRETORIA STATUS REPORT.
Regional Meteorological Telecommunication Network for Region II (Asia)
Outcome of the ET-CTS Meeting (Toulouse, May 2008)
WIS data-communication structure Outcome of study by ET-CTS (Expert Team on WIS-GTS Communication Techniques and Structure) Please consider our Earth.
Review of the current status of implementation of TCP/IP procedures and applications at GISC Beijing ET-CTS, Dakar, 5-8 April 2016.
Regional Training Seminar on GTS Techniques and Procedures
Peak speed through Internet
ET-CTS 2016 ASECNA, Dakar. Senegal Date: April 2016
Status Report of GISC Tokyo
WIS overview Submitted by: Secretariat (Doc 02b)
TT-GISC-2016 Doc 15 Agenda Item 2
Status of Implementation at RTH Tokyo
Outcome of the ET-CTS Meeting (Toulouse, May 2008)
MeteoFranceMPLS via Toulouse
Status Report of RTH Tokyo
Status of RA II WIS Implementation Plan
GISC New Delhi Status Dr. S. L. Singh
Presentation transcript:

Overview of the Improved MTN project Geoff Molloy Communications and Computing Branch Bureau of Meteorology Australia

Overview of the Improved MTN project Background The idea was partly based on two existing networks: 1.RMDCN. 2.British Telecom (BT) Frame Relay links between Melbourne-Singapore-Jakarta

Overview of the Improved MTN project The RMDCN Virtual Private Network based on Frame Relay PVCs –Guaranteed bandwidth ( CIR ) –Ability to take advantage of unused network capacity ( EIR ) –PVC costs are in function of the CIR and the location of the end-points –No limit to the number of Sites that can be connected –No limit to the number of PVCs that can be established TCP/IP is used as a transport protocol –Fully managed Cisco routers Connection via a PTT access line to the in-country POP Backup service ( ISDN, PSTN, dual access line )

Overview of the Improved MTN project Phases implementation of the Improved MTN project should be a progression. In its first stage (Phase I), there would be a mix of “clouds” and existing point-to- point links. Phase I should therefore evolve quickly towards Phase II in which all the MTN links would be provided via a small number of “clouds” or Managed networks – e.g. frame relay.

Overview of the Improved MTN project Regional Meteorological Telecommunication Network for Region V (South-West Pacific) point-to-point circuits implementation (transmission speed in Kbit/s) Washington Honolulu Tokyo New Delhi Papeete Honiar a Melbourne Wellington Port Vila Noume a Jakarta Kuala Lumpur ASMC Singapore Bangkok Manila Brunei RTH NMC Centre in other region MTN circuit Regional circuit Interregional circuit Port Moresby radio broadcast Fax 64 TCP/IP NO X.25 FR 64 (CIR:4) TCP/IP (+ X.25) 9.6 X.25 FR 64 (CIR:8) TCP/IP (+ X.25) 4.8 TCP/IP 4.8 X TCP/IP 9.6 X X X.25 RSMC Darwin 2.4 X FR 64 (CIR-16) TCP/IP Bracknell NO Not operational CIR Committed Information Rate (Frame Relay links) FR 64 (CIR:8) TCP/IP NO Internet 256* Internet 28.8* Apia Pago-Pago Guam Micronesia AFTN+GTS 9.6 X X.25 AFTN+GTS 9.6 X VIII.2000 Internet 256* Peak speed through Internet Fax RSMC Nadi FR 512 (CIR:128) Additional circuit

Overview of the Improved MTN project Network B Mixed use of Data Communication Network Services and point-to-point circuits Network ARA VI RMDCN Tokyo Melbourne Washington Bracknell Beijing Buenos AiresBrasilia Prague Sofia Algiers Jeddah RTH - MTN Gateway RTH Existing network MTN PVC through Network Inter-Regional PVC through Network Existing point to point links Nairobi Dakar Offenbach Cairo Moscow Toulouse New Delhi Access line to Network Services Figure 6.2.2: The IMTN, Phase I: Example of possible Implementation of the MTN - Figure 6.2.2: The IMTN, Phase I: Example of possible Implementation of the MTN -

Overview of the Improved MTN project Figure 6.2.1: The IMTN, Phase II: Example of possible implementation of the MTN - use of Data Communication Network Services Tokyo Melbourne Washington Bracknell Offenbach Jeddah Buenos AiresBrasilia Toulouse Prague New Delhi Sofia Algiers Nairobi Beijing Cairo RTH- MTN Gateway RTH Existing Network Services New possible Network Services Network-to Network Interconnection Network D Network A Network CRA VI RMDCN Access line to Network Services Moscow Network B Dakar

Overview of the Improved MTN project Why a managed Network? Potential advantages include: 1.Cost-effectiveness compared to dedicated leased lines. Also economy of scale likely to result in significant discounts. 2.Burst capability – ideal for timely receipt of large volume of data for a short period of the day (eg model data) 3.Ability to increase link capacity easily and quickly – no need to order new line. 4.Ability to add additional links quickly and cheaply. 5.High availability – option to have fully managed service and ISDN backup

Overview of the Improved MTN project MOU key to flexibility Drafting a Memorandum of Understanding (MoU) among the centres –  Responsibilities of each centre; –  Method of procurement of the service; –  Funding of the various stages; –  On-going coordination and management of the relationship with the supplier; –  Procedure for adding another centre to the cloud, etc.

Melbourne Australia FRAME RELAY SCHEMATIC ( INFONET by Telstra) Dorval, Canada Washington NWS USA Buenos Aires Argentina Brasilia Brazil Pretoria, South Africa Tokyo, Japan Bracknell UK 256K 128K 256K 128K 64K 32K 8K8K 8K8K 64K 16K 8K8K NESDIS

FR Port Japan Local Line Tokyo Melbourne Bracknell FR Port Australia FR Port U.S.A. KDDI Frame Relay NNIGateway FR Port U.K. NNIGateway DACOM Frame Relay NNIGateway HKT IMTN Network B INFONET Frame Relay Seoul Hong Kong NNIGateway CAT Frame Relay Bangkok Washington

Overview of the Improved MTN project Melbourne – Tokyo – Washington – Bracknell network Quotes were sought from leading providers for this network – Worldcomm, Sprint, BT. Also a quote was sought from Equant under the RMDCN contract. At this time (September 2002) at appears that this network will be a service from BT for 3 years Unsymetric PVCs