生產工程 Production Engineering. Production (Fundamentals of Petroleum, UT-Austin, Chapter V) 生產工程 (Definition of production) ( 1 )將地層的流體(油或氣)由井底帶到地表。 ( bring.

Slides:



Advertisements
Similar presentations
Completion Agenda At the end of this presentation, you will be able to: Define completion Describe the process of completion List and define the different.
Advertisements

ACTIVE LEARNING PROCESS
Step 1: Digging a Cellar On land, a majority of wells begin with digging a cellar from three to fifteen feet in depth. The purpose of a cellar is to align.
Well Design PE 413 Introduction and API Standards of Casing
Chapter 3 COMPLETION.
PETE 411 Well Drilling Lesson 17 Casing Design.
CHAPTER 6 – WELL COMPLETION & STIMULATION
MANAGED PRESSURE DRILLING PRESENTATION ______________________________________________________________________ A Continuous Circulating Concentric Casing.
PETE 203 DRILLING ENGINEERING
生產工程 Production Engineering. Well Servicing and Workover 井維護與修井 2.
Chapter 3 Casing design.
“ Unusual Interventions ” Jenna Robertson ICOTA Canada Roundtable October 14, 2010.
Drilling Engineering – PE311 Circulating System
Chapter 5 Drilling Techniques and Drilling Problems
3.4.6 Student Book © 2004 Propane Education & Research CouncilPage Maintaining Bulk Plant Compressors Knowledge of the processes involved in maintaining.
Should Horizontal Wellbores be Logged? An analytical approach to hydraulic fracturing entry positioning and completion equipment selection.
GARP®Presentation ALRDC Seminar May 14 th, 2014 Daryl Mazzanti – Garp Services, LLC Wholly owned subsidiary of Evolution Petroleum Corp (EPM- NYSEMKT )
“PRODUCTION” MIDDLE EAST TECHNICAL UNIVERSITY
ATMATM PETE 406 UBD ATMATM ATMATMATMATM PETE Underbalanced Drilling, UBD Lesson 9 Benefits of Underbalanced Drilling UDM - Chapter 3.
Hydraulics.
Inflatable DST Equipment An Overview Presentation.
INFLATABLE DST EQUIPMENT
ZF-100 The Paraffin & Asphaltene Solution. ZF-100 The Paraffin & Asphaltene Solution 72% Biodegradable, environmentally friendly ZF-100 is an aggressive.
1 Chemical and Engineering Thermodynamics Chapter 2 Conservation of mass and energy Sandler.
國立中山大學財產管理系統 線上報廢、盤點系統 總務處保管組 策劃 計算機與網路中心 分析設計 2008/03.
Introduction to Java Programming Lecture 17 Abstract Classes & Interfaces.
Fugacity Coefficient and Fugacity
生產系統導論 生產系統簡介 績效衡量 現代工廠之特徵 管理機能.
CHAPTER 9 電腦 林麗娟‧教學媒體與操作. The Role of Computer for Learning  區別電腦輔助教學 (Computer –Assisted Instruction, CAI) 與電腦管理教學 (Computer – Managed Instruction,
1 © 2011 台灣培生教育出版 (Pearson Education Taiwan). 2 學習目標 1. 當面對可預測的變異性時,同步管理並改善供應鏈 中的供給。 2. 當面對可預測的變異性時,同步管理並改善供應鏈 中的需求。 3. 當面對可預測的變異性時,使用總體規劃將利潤最 大化。
Hydraulic Fracturing 101. What is Hydraulic Fracturing? Hydraulic fracturing, or “fracking”, is the process of drilling and injecting fluid into the ground.
幼兒行為觀察與記錄 第八章 事件取樣法.
Installation. Indoor Unit Installation Typical Installation.
Rock Coring Obtain undisturbed samples of solid, fractured, or weathered rock formations.
Enhanced Oil Recovery using Computerized Hydraulic Lift Systems
Lesson 30 Cementing - cont’d
生產工程 Production Engineering
Well Testing Initial production tests at surface after wellbore cleanup and fracing. Sometimes called initial potential or IP. IP= Initial Production IPF.
1 New Production Technologies for Lifting Liquids from Horizontal Wells Radius Energy, LLC May, 2015.
Submitted by Waris jamal Praveen kumar gautam Shiv pratap singh Ramashwar kumar singh Under the guidence of Prof.safiulla khan.
Petroleum Engineering 406 Lesson 6 Well Control Unusual Operations.
Well Design PE 413.
Completing & Producing A Well
Installation. Indoor Unit Installation Typical Installation.
Drilling Operations History Drake’s Well was the first commercial oil well drilled in 1859 in Pennsylvania. Cable Tool Drilling technique was used to drill.
Casing Design.
Percussion drilling By Batch -2. Percussion drilling Cable Tool Drilling Percussion drills have been used to drill thousands of feet, though they are.
Petroleum Engineering 406 Floating Drilling
Underbalanced Perforating. èEarly tests by Exxon showed that flow patterns and perforation geometry prevent the cleaning out of an appreciable percentage.
ARTIFICIAL LIFT METHODS
Kick Submited to :- Submitted by:- Er Akash Rana Devahish Yadav B.Tech IIIrd Year Petroleum Technology 1.
Presentation on “ELEMENTS OF PRODUCTION ENGINEERING”
Introduction to Well Completions
Lecture 10 Production Engineering
Fluid Mechanics for Chemical Engineers Arif Hussain (Lecturer)
Chapter 3 Well Completions. Two basic types: Open Hole Perforated Casing.
Oil and Gas Production 1 PRO 250 PowerPoint presentation created by Dr. Shauna Kocman used in CMC PRO250 with her permission under Creative Commons License.
Overview of Petroleum Industry Chapter 4B – Drilling Operations
Oil-Field Hydraulics Chapter 2 Production Equipment
Deptt. of Irrigation and Drainage Engineering, Dr. PDKV, Akola
CASING.
INSTRUCTOR © 2017, John R. Fanchi
SUSTAINABLE DRILLING OF OIL & GAS WELLS
HYDROSTATIC DEVICE FOR
Parts Wellhead All casing strings, except for liners, are suspended from a wellhead. On a land well or offshore platform the wellhead is just below.
Well Perforation Perforation  is the process of creating holes in production casing to establish communication between the well and formation. Perforation.
WELL COMPLETION AND STIMULATION BY BHARAT KUMAR HARANI ASSISTANT PROFESSOR DAWOOD UNIVERSITY OF ENGINEERING & TECHNOLOGY, KARACHI.
Large Air Systems – Sales Training
Well Perforation Perforation  is the process of creating holes in production casing to establish communication between the well and formation. Perforation.
Presentation transcript:

生產工程 Production Engineering

Production (Fundamentals of Petroleum, UT-Austin, Chapter V) 生產工程 (Definition of production) ( 1 )將地層的流體(油或氣)由井底帶到地表。 ( bring the well fluid to surface) ( 2 )將地表的流體作處理(例如 : 油氣分離), 以 作為輸送 到煉油廠之前的準備。 (preparing them for their trip through the pipeline to the refinery)

生產之階段( Stages 或 phases ) ( 1 )完井( complete the well ) -- bring the fluid to the surface The first step is to complete the well - that is, to perform whatever operations are necessary to start the well fluids flowing to the surface ( 2 )例行修護( Routine maintenance operations ) -- doing whatever is necessary to keep the well producing ( a )修復磨損及故障的設備 -- replacing worn or malfunctioning equipment, are standard during the well's production lift ( b ) Workover ( 修井 ) -- more extensive repairs, known as workovers, may be necessary to maintain the flow of oil and gas ( 3 )流體分離( Separate the fluids) -- taking the fluids through a series of steps to purify, test, and measure them The fluid must be separated into its components, because well fluid are usually a mixture of oil, gas, and water. These must be treated, measure, and tested before they are run to the pipeline on their way to the refinery

Well completion 完井 4

Well completion ( 完井 ) After a well has been drilled to the projected depth and the productive formation have been evaluated for their economic worth and profit, work will begin to ( 1 ) set casing ( 下套管 ) ( 2 ) prepare well for production ( 準備生產 ) ( 3 ) bring in the zone or zones ( 生產 )

Well Completion (完井方法的選擇依據) Completion equipment and the methods employed are quite varied, and the decisions for an individual well are usually based on - the type of oil or gas accumulations involved ( 地層油氣的種類 ) - the requirements that may develop during the life of the well ( 生產歷程中可能需要的設備 ) - the economic circumstances at the time when the work is done ( 當時的經濟情境 )

Well Completion 不同狀況下之考慮 Low pressure, sometimes second hand pipe will be employed if the oil accumulation has a marginal payout, and other expenditures ( 花費 ) will be scaled down ( 按比例縮減 ) accordingly. If high pressure is anticipated and well life is expected to be long, however, the best grade of pipe with backup precautions ( 備份預防措施 ) will be needed.

The well Typically, an oil or gas well will require three concentric strings of large pipe : - conductor pipe 導管 - surface casing 表層套管 - oil string (production casing) 油層套管 / 生產套管 - tubing 油管

( 1 ) Conductor pipe 導管 - The conductor pipe prevents the hole from caving in at the surface are endangering ( 危及 ) the drilling rig foundation. - It is usually cemented, but occasionally it is driven into place by a pile ( 樁 ) driver.

( 2 ) Surface casing 表層套管 - When the surface casing is set and cemented in place, it provides protection for freshwater formations. - It also prevents loose shale and sand or gravel from falling into the hole and affords a means for controlling the flow of fluid from the well. - Setting depths may vary from 500 ft to 5000 ft.

( 3 ) Oil string 油層套管 / 生產套管 - The final casing for most wells is the oil string, or long string. - The producing formation is usually completely cased off, but sometimes the oil string is set near just or on top of the potential pay zone.

(4) Tubing 油管 - The final string of pipe usually run in a producing well is the tubing. - Tubing is nearly always freely suspended in the well from the casinghead. - Advantage of putting a tubing ( 使用油管的優點 ) ( a ) It's small diameter produces more efficient results than casing in a flowing well. ( b ) Tubing also makes a safer well completion possible. ( c ) Tubing is comparatively easy to remove when it becomes plugged or damaged. ( d ) Tubing, in conjunction with a packer, keeps well fluids away from the casing because the packer seals the space between the tubing and casing.

Casing, tubing, and packer arrangement in a flowing well

Wellhead 井頭 14

The Wellhead The wellhead is made up of a combination of parts called --- Casinghead --- Tubinghead --- Christmas tree -- Stuffing box, -- Pressure gauges

The Wellhead ─The wellhead is the equipment used to maintain surface control of the well. ─It forms a seal to prevent well fluids from blowing or leaking at the surface. ─The conditions expected to be encountered in the individual well determine the type of wellhead that is needed. ─Sometimes, all that is required is a simple assembly to support the weight of the tubing in the well. ─In other cases, the control of formation pressures is necessary, and a high-pressure wellhead is required.

The wellhead ( 井頭的功能 ) Surface control Prevent well fluid from blowing or leaking Support the weight of the tubing Control of formation pressure

( 1 ) Casinghead ─The casinghead is a heavy steel fitting at the surface to which the casing is attached. ─It provides a housing for the equipment from which intermediate strings of casing are suspended. ─During drilling and workover operations, the casinghead is used as an anchor for the pressure-control equipment that may be necessary.

( 2 ) Tubing head ─ Similar in design and use to the casinghead, the tubing head supports the tubing string, seals off pressures between the casing and the inside of tubing, and provides connections at the surface with which the flowing liquid or gas can be controlled. ─ The tubing head is supported by the casinghead if a casinghead is used on the well.

( 3 ) Christmas tree ─The control valves, pressure gauges, and chokes assembled at the top of a well to control the flow of oil and gas after well has been drilled and completed are known as the Christmas tree, so named because of its shape and the large number of fittings branching out above the wellhead (fig.5.4) ─The pressure gauges reveal casing and tubing pressures. By knowing these pressures under various operating conditions, better well control is possible.

Christmas tree

Completion methods 完井方法 22

Completion methods A well-servicing contractor may move in a smaller rig to perform the operations necessary to put the well in production. ─The type of completion method used is determined by the characteristics of the reservoir and it economic potential. ─Among the various types of completion methods used are open-hole and liner completions (裸孔完井及襯管完井) perforating (perforated casing completion 套管穿孔完井 ) swabbing (抽吸法,早期的完井生產方法)

24

Open-hole and liner completions 裸孔完井及襯管完井 ─In an open-hole, or barefoot completion, no production casing or liner is set opposite the production formation (fig 5.5). Reservoir fluids flow unrestricted into the open wellbore. This type of completion method has limited use in certain situations. ─In the liner completion, a screen liner is used to obtain communication between the reservoir and the wellbore.

Fig 5.5 Open-hole completion or barefoot completions

Well completions - completion methods Casing Completions 套管完井 - Conventional perforated casing completions - Multiple-zone completions - Water and gas – exclusion completions - Sand exclusion completion (gravel packing completion) 防砂

Perforating ( perforated casing completion 套管穿孔完井) ─Perforating is the process of piercing ( 穿透 ) the casing wall and the cement to provide holes through which formation fluids may enter. ─Perforation should (a) provide a clean, undamaged, and productive perforation, (b) penetrate the producing interval as far as possible, (c) shoot a smooth and round entrance hole in the casing (d) produce minimal casing and cement damage, and (e) produce the maximum flow rate with the minimum number of perforations. ─ Two basic methods of piercing the casing wall are bullet perforating and jet perforating.

Bullet Perforating Bullet Perforator are lowered into the hole and fired electrically from the surface. (fig 5.6) Bullets cause little casing damage and less damage to the cement sheath between the pipe and wall of the hole than jet charges.

Jet perforating In jet perforating, shaped-charge explosives are employed instead of bullets.

Perforating Bullet perforation is more effective in formation of low to moderate compressive strength, while jet perforation is generally better in rock with high compressive strength. A much safer well completion technique is to make the perforations after the tubing has been run and the packer set because the well is under absolute control at all times. Thru-tubing perforation has been made possible by the development of perforating devices small enough to run through tubing.

Swabbing 抽吸法 Swabbing is a temporary operation that lower the fluid level in the well so that it can begin to produce If enough fluid can be swabbed (lifted) out of the tubing so that the pressure in the formation is slightly greater than the hydrostatic pressure of the fluid in the tubing, the oil or gas will start flowing immediately after the perforation are made. If the fluid does not flow after bring swabbed, a pump is installed as a permanent lifting device to bring the oil the surface.