Course: Government Process Re-engineering Day 3 Session 5: Key Learning, Feedback and Training course wrap-up.

Slides:



Advertisements
Similar presentations
WHAT IS THE MOST IMPORTANT THING THAT WE HAVE LEARNED ABOUT QUALITY AND COST? The factors that lead to increased student learning and increased student.
Advertisements

Introduction to Lean. Benefits of Lean Why go Lean? Improvements in: –Customer service –Quality and efficiency –Staff morale –Internal communication and.
Course: e-Governance Project Lifecycle Day 1
And Learning TEAL Consulting Limited a a Meeting Customer Demand in Challenging Times July 2010.
Designing, Controlling, and Improving Organizational Processes
Chapter 9 Designing Adaptive Organizations
Chapter 14 Contemporary cost management. Cost management §Improvement of an organisation’s cost effectiveness through understanding and managing the real.
HRM 601 Organizational Behavior Session 6 Motivational Applications.
E-commerce COM380 E-commerce Lecture 9 Change management.
Systems Requirements 10/4/2010 © Abdou Illia MIS Fall 2010.
Organizational Design, Diagnosis, and Development Session 11 Organizational Diagnosis, I.
Chapter 6, Process-Flow Analysis
Lean Six Sigma Executive Introduction. Copyright OpenSourceSixSigma.com Competition Every morning in Africa, a gazelle wakes up; it knows it must run.
© 2013 Cengage Learning. All Rights Reserved. May not be scanned, copied, duplicated, or posted to a publicly accessible website, in whole or in part.
Total Quality Management By: Zaipul Anwar Manager, R & D Dept. Business & Advanced Technology Centre UTM.
McGraw-Hill/Irwin © 2006 The McGraw-Hill Companies, Inc., All Rights Reserved. 1.
Grants Business Process Re-Engineering (BPR) Overview
Customer Focus Module Preview
Lean Supply Chain Action Learning Program September 2007.
Charting a course PROCESS.
Chapter 13 Team Work Development Presenters: Kristen Hunt Yanique Reid Latoya Vernon.
Eng R. L. Nkumbwa-2010 Copperbelt University 1 ISO Quality Management Systems.
Information Architecture and Business Process Re-engineering CMPT 455/826 - Week 4, Day 1 (Based on Kettinger) Sept-Dec 2009 – w4d11.
1-1 1 McGraw-Hill/Irwin ©2009 The McGraw-Hill Companies, All Rights Reserved.
Business Process Reengineering A how-to for understanding and improving your county’s business process NC WSS Leadership Summit – April 22-23,
Course: Government Process Re-engineering Day 1 Session 1: Introduction to the Training Course Wg Cdr A K Srinivas (Retd) Director-AIPER, Coo/Group Head.
Seevic Performance Appraisal
Chapter 5 Activity-Based Management. 1. How can reasonably accurate product and service cost information be developed? 2. What are the differences among.
Six Sigma at Boston Scientific Tuesday 12 September 2006 Steve Czarniak BSC Six Sigma: ASQ Meeting – 12 September 2006.
Zia Qureshi, Chief Executive Business Catalyst
Value Analysis/ Flow Analysis
Organizational competence in harnessing IS/IT
New Directions Learning & Development  All Rights Reserved. Lean Your Library: How Lean Six Sigma Strategies Can Improve Operations.
M A N A G E M E N T M A N A G E M E N T 1 st E D I T I O N 1 st E D I T I O N Gulati | Mayo | Nohria Gulati | Mayo | Nohria Chapter 10 Chapter 10 PERFORMANCE.
1. 2 Business Process Reengineering (BPR) “the fundamental rethinking and redesign of processes to achieve dramatic improvements in critical, contemporary.
BUSINESS PROCESS REENGINEERING & ERP
ENTERPRISE RESOURCE PLANNING(ERP). Contents Introduction ERP-Definition Evolution of ERP Enabling Technologies ERP Characteristics Features of ERP Benefits.
Designing, Controlling, and Improving Organizational Processes
AFM The Balanced Scorecard By Isuru Manawadu B.Sc in Accounting Sp. (USJP), ACA.
Irwin/McGraw-Hill  The McGraw-Hill Companies, Inc Process-Flow Analysis Chapter 7.
The Importance of a Career Development Plan Students Name: Lecturers Name: Unit Title: Submission Date:
Quality Management.
Process System Capability An introduction to 9103 ‘VARIATION MANAGEMENT OF KEY CHARACTERISTICS’ Bernard LAURAS AIRBUS.
Chapter 4 IS/IT Strategic Analysis: Current Situation.
Copyright  2005 McGraw-Hill Australia Pty Ltd PPTs t/a Australian Human Resources Management by Jeremy Seward and Tim Dein Slides prepared by Michelle.
Copyright  2006 McGraw-Hill Australia Pty Ltd PPTs t/a Management Accounting: Information for managing and creating value 4e Slides prepared by Kim Langfield-Smith.
Foundations and Evolutions
7-1 McGraw-Hill/Irwin Operations Strategy Copyright © 2008 The McGraw-Hill Companies, Inc. All rights reserved. Business Process- Focused Strategies and.
PROJECT NAME EMPIRE BELT(S) Month Day, Year. 2 Agenda Lean Overview Introduction to the Project & Team The Process Next Steps.
CONDITIONS RIPE FOR BPR (HAMMER STYLE) Unarticulated/out-of-date rules Not right first time Sequential process Lack of focal point of responsibility Worker.
Design, Development and Roll Out
BUSINESS PROCESS REENGINEERING DR. MOHAMED RIYAZH KHAN –DOMS SNS. COLLEGE OF ENGINEERING.
Chapter 16 Managing costs and quality
Designing, Controlling, and Improving Organizational Processes.
Alex Ezrakhovich Process Approach for an Integrated Management System Change driven.
P3 Business Analysis. 2 Section D: Business Process Change D1. The role of process and process change initiatives D2. Improving the process of the organisation.
DMPS Emma Knapp Continuous Improvement Coordinator Check out our Continuous Improvement Staff Resource Center page and our Weebly ci.dmschools.org.
Mark Hehl (c)2010 Mark Hehl, all rights reserved.
TQM Implementation. What are the approaches for TQM Implementation?
Human Resource Management 1 Performance Management Process.
R equirements of I SO Clause 5 5. Management responsibility  5.1 Management commitment -Top management shall provide evidence of its commitment.
Sample Fit-Gap Kick-off
Instructor: DR. Hussein Reda
Chapter 16 Implementing HR Strategy: High-Performance Work Systems
Performance Measurement
Business Process Reengineering
کـورس ارتـباط کارکـنان
The Planning Process September 26.
Public Management Information Systems System Analysis Thursday, August 01, 2019 Hun Myoung Park, Ph.D. Public Management & Policy Analysis Program Graduate.
Presentation transcript:

Course: Government Process Re-engineering Day 3 Session 5: Key Learning, Feedback and Training course wrap-up

Agenda Summarizing the key elements of the course Question & Answer Session Feedback

Slide 3 BPR/GPR is radical reshaping of processes, structures, management systems & values to achieve quantum leaps in performance Key drivers for BPR / GPR are the desire to −Improve Quality −Improve responsiveness to customers through lowered cycle times −Improve productivity / Lower costs −Improve Employee Skills, Satisfaction and Retention

Slide 4 Typical Lifecycle of project Determining The Current Position Gathering Information Process Mapping Measuring Values Process Redesign Implement

Slide 5 How does BPR / GPR work? Key drivers for BPR / GPR are −duplication of work / rework / unnecessary work −lack of standardization −repetitive tasks not automated Design principles of BPR / GPR −Eliminate waste and non-value adding activities −Organize around customer-desired outcomes −Apply automation appropriately; during or after process redesign −Allow self services wherever possible −Outsource, if it brings benefits to the government −Establish a continuous improvement mindset and capability

Slide 6 How do we know if we have succeeded in BPR / GPR? The process is a successful design/redesign when it: −Resolves all issues identified −Is likely to achieve performance targets −Produces an output that conforms to customer requirements (internal / external) −Is within the realm of possibility (i.e. could potentially be implemented)