Development of a Decision Aiding Framework For Energy Infrastructure Siting Ganesh Doluweera & Joule Bergerson Institute for Sustainable Energy, Environment.

Slides:



Advertisements
Similar presentations
Increasing Pipeline Safety Through Shared Planning Transmission Pipelines and Land Use: What needs to be accomplished and why? General Session --- November.
Advertisements

Payam Moradi Young Researchers Club Azad University of Tafresh, Iran Eleventh International Conference on Fuzzy Set Theory and Applications (FSTA 2012)
Relevant, Ready, Responsive, Reliable Flood Risk Management and the U.S. Army Corps of Engineers Actions for Change David Moser 1, Martin Schultz 2, Todd.
Lesson 3 ODOT Analysis & Assessment. Analysis & Assessment Learning Outcomes As part of a small group, apply the two- part analysis by generating exposure-
Building of Research Team in the Field of Environmental Modeling and the Use of Geoinformation Systems with the Consequence in Participation in International.
Copyright, © Qiming Zhou GEOG3600. Geographical Information Systems GIS as Decision Support Tool.
General Information on Permitting Electric Transmission Projects at the California Public Utilities Commission June 2009 Presentation created by the Transmission.
Hydrogen Production Decisions: Decision Making in View of Differing Stakeholder Preferences Elvin Yuzugullu Doctoral Candidate The George Washington University.
Grid-based Map Analysis Techniques and Modeling Workshop Part 1 – Maps as Data Part 2– Surface Modeling Part 3 – Spatial Data Mining Part 4 – Spatial.
By Joseph K. Berry W. M. Keck Scholar, University of Denver – August, An Overview of GIS-based Corridor.
AIACC Regional Study AS07 Southeast Asia Regional Vulnerability to Changing Water Resources and Extreme Hydrological due to Climate Change.
RET565 – Construction Technology & Infrastructure Dr AHMAD HILMY ABDUL HAMID School of Housing, Building & Planning.
An Introductory Overview to Multi Criteria Evaluation GEOG 5161: Research Design Professor Kenneth E. Foote Petra Norlund 2010.
Freight-Supportive Guidelines ACT Canada – Sustainable Mobility Summit 2012 November 7, 2012 Ontario Ministry of Transportation.
Copyright © 2006 Pearson Education Canada Inc Course Arrangement !!! Nov. 22,Tuesday Last Class Nov. 23,WednesdayQuiz 5 Nov. 25, FridayTutorial 5.
Grid-based GIS Modeling Nigel Trodd Modified from Berry JK, GIS Modeling, presented at Grid-based Map Analysis Techniques and Modeling Workshop,
Decision Based Design Some Questions David Kazmer University of Massachusetts Amherst.
Abstract The operation of today’s wastewater systems requires ongoing planning, maintenance, and management. Planning of these systems involves a thorough.
Modeling the Impacts of State Energy Policies Barry Rubin, Zachary Wendling, David Warren, Sanya Carley, and Kenneth Richards School of Public and Environmental.
What’s next in California's flood future? Finding answers: California Water Management Investment Strategy FEMA Region IX - CHARG Stakeholder Meeting July.
North Slope Decision Support System: Ice Road Planning Algorithms 3 rd Stakeholder Workshop April 27-28, 2011.
Africa Geospatial Forum Geospatial Empowering Utilities.
Dams and Development Prof. Hem Raj Subedee, Ph.D. Conflict, Peace and Development Studies Tribhuvan University Kathmandu
GIS Modeling (Berry) GIS Modeling logically sequences map analysis operations (Spatial Analysis, Surface Modeling and Spatial Data Mining) to solve spatial.
1 Road network vulnerability Important links and areas, exposed users Erik Jenelius Dept. of Transport and Economics Royal Institute of Technology (KTH)
Environmental Assessment Public Information Meeting – September 2010 Realignment of a Portion of a Utah Lake Drainage Basin Water Delivery System (ULS)
THE OFFSHORE SITUATION IN GREECE Municipality of Corfu.
Goal — The BP Routing Collaboration tool is a web-based.NET application consisting of server-based GIS and modeling components that identify the least.
Risk based design of flood defence systems: A preliminary analysis for the New Orleans Metropolitan Area S.N. Jonkman M. Kok M. Van Ledden J.K. Vrijling.
Eftec Economics for the Environment Consultancy Using ecosystem services for cost benefit analysis of forestry decisions Roundtable on Cost / Benefit of.
The Need for Electric Transmission Improvements in Dane County.
S.A.V.E. is a non-profit community organization whose aim is to sustain the southern Chester County region’s rural quality of life and community character.
Yaqui Valley Land-Water System WaterAgriculture Industry Wetlands Aquaculture Urban Fisheries + Marine Estuaries + Fisheries Climate  (sea level, precip)
Highway Location Study CE 453 Lecture 4 See also lab 2 and lab 4 instructions, and EIS lecture notes See also 04 DOT development process.doc Refs:
Tim McDaniels, Hadi Dowlatabadi, colleagues and students Recent Decision Support Efforts Within the UBC CEDM Node June 13, 2011 Prepared for CEDM Advisory.
EPA Cooling System Regulations Hall of States Briefing February 22, 2011.
STRATEGIC ENVIRONMENTAL ASSESSMENT METHODOLOGY AND TECHNIQUES.
S ystems Analysis Laboratory Helsinki University of Technology Practical dominance and process support in the Even Swaps method Jyri Mustajoki Raimo P.
Copyright © 2009 Pearson Addison-Wesley. All rights reserved. Chapter 3 Valuing the Environment: Methods.
Location decisions are strategic decisions. The reasons for location decisions Growth –Expand existing facilities –Add new facilities Production Cost.
August 7, 2002 TMDL/JS 1 A Stakeholder Process for Formally Evaluating TMDL Recommendations Dominguez Channel Lawrence Livermore National Laboratory With.
Ecologia applicata – Cunningham, Cunningham, SaigoCopyright © 2004 – The McGraw-Hill Companies, srl Outline: Environmental Policy Cycle  NEPA Environmental.
Logging roads in the Amazon Basin: building process and modeling challenges Eugenio Arima Robert Walker Stephen Perz Marcellus Caldas Department of Geography.
Reliable Power Reliable Markets Reliable People Hanna Region Transmission Development Ramaiah Divi, P.Eng Manager, Central System Planning.
Designing Energy Solutions without Borders National Association of Regulatory Utility Commissioners National Association of Regulatory Utility Commissioners.
© 2000 PACIFICORP kV LINE WALLA WALLA – WALLULA – Mc NARY 500 kV LINE HEMINGWAY – CAPTAIN JACK – REGIONAL PLANNING MEETING REGIONAL PLANNING PROJECT.
Development of a community-based participatory network for integrated solid waste management By: Y.P. Cai, G.H. Huang, Q. Tan & G.C. Li EVSE, Faculty of.
Model Calibration and Weighting Avoid areas of… High Housing Density Far from Roads In or Near Sensitive Areas High Visual Exposure …what is “high” housing.
Juan de Fuca Cable Project Presented by: Sea Breeze April 25, 2006.
Water Use Planning Siobhan Jackson BC Hydro Generation November 3, 2004 CEATI Water Management Workshop, Vancouver BC Translating Sustainability Theory.
Power distribution and utilization Lecture 2 Instructor :Kashif Mehmood.
Optimizing Hydrogen Pipeline Deployment in Real Geographic Regions Nils Johnson Joan Ogden Yueyue Fan National Hydrogen Association Conference May 4, 2010.
Harmonization and Use of Standard Analytical Tools for Water Resources Management as an approach towards Regional Cooperation Abdulkarim H Seid Head, Water.
CE 360Dr SaMeH1 Environmental Eng. 1 (CE 360) Associate Professor of Environmental Eng. Civil Engineering Department Engineering College Majma’ah University.
1 THE OPTIMAL ROUTE SELECTION FOR THE TRANSMISSION MAIN OF A WATER SUPPLY SYSTEM USING GIS GUIDED BY MR. A V AJITH LECTURER CIVIL ENGG. DEPT. PRESENTED.
Understanding the Integrated Resource Plan (IRP 2010 Rev 2)
Mustajoki, Hämäläinen and Salo Decision support by interval SMART/SWING / 1 S ystems Analysis Laboratory Helsinki University of Technology Decision support.
Transmission Line Siting Model (Hypothetical Example) Criteria – the transmission line route should… Goal – identify the best route for an electric transmission.
Sustainable Urban Energy Systems A Science of Cities Approach Lorraine Sugar PhD Candidate, University of Toronto ONSEP 2016.
Back River Mine Project Presentation to the Nunavut Impact Review Board Final Hearing Cambridge Bay, NU April 25-30,
Presented by Terry Peckham
Mikko Harju*, Juuso Liesiö**, Kai Virtanen*
Oil Pipeline Optimal Route
EUM Model Benchmarking Toronto Water EUM Model Evaluation
Draft Transportation Element September 6, 2017
PUBLIC PARTICIPATION MEETING FOR CONSTRUCTION OF A 400KV ±250 KM POWER LINE FROM BORUTHO S/S IN MOKOPANE TO BOKMAKIERIE S/S IN NZHELELE & ASSOCIATED SUBSTATION.
Mitigation.
PUBLIC HEARING PRESENTATION: RESIDENTS’ CONCERNS
JICA Research Institute, Tokyo, Japan
FRLP Proposed Boundary Line Adjustment: Confluence Virginia
Presentation transcript:

Development of a Decision Aiding Framework For Energy Infrastructure Siting Ganesh Doluweera & Joule Bergerson Institute for Sustainable Energy, Environment and Economy, University of Calgary 1 32 nd USAEE/IAEE North American Energy Economics Conference July 30, 2013

Motivation 2 Demand for new energy infrastructure is growing – rising energy demand, ageing infrastructure and environmental concerns Siting energy infrastructure is a complex process that involves multiple stakeholders with multiple and conflicting objectives In recent years, siting energy infrastructure has become increasingly difficult – one reason is oversimplification of stakeholder complexities

Research Objective Develop a framework to construct alternative siting options This framework has more complete incorporation of stakeholder objectives Developed by combining energy system modeling with decision analysis techniques 3

Current Practice 4

Proposed Framework 5 ObjectiveAlt 1Alt 2 Obj 1xx Obj 2xx Obj 3xx Obj 4xx Consequence tables Obj 1 Obj 2Obj 3Obj 4 Alt 1 Alt 2 Alt 3 Obj 1 Obj 2Obj 3Obj 4 Alt 1xx Xxxx Alt 2xx Xxxx Alt 3xx Xxxx Preference structure and rankings

Eastern Alberta Transmission Line (EATL) (500kV HVDC; ̴ 500km ) Case Study 6 Selection of a route for an electricity transmission line in Alberta, Canada Decision makers’ objective: Select the transmission line route that is in public’s best interest Focus on an approximately 100km section of EATL (Andrew-Holden section)

Methods: Stakeholder Objectives 1.Minimize Residential and property value impacts 1.Minimize the proximity to residential properties 2.Avoid densely populated areas (Urban areas) 2.Minimize Environmental impacts 1.Minimize river and water body crossings 2.Minimize proximity to environmentally sensitive areas 3.Avoid highly sensitive ecosystems 3.Optimize economic and engineering factors 1.Parallel existing linear disturbances (roads, power lines) 2.Minimize cropland disturbances 3.Minimize building on high slopes (terrain features) 4.Minimize cost 7

Methods: System Model 8 References: 1.Gregory R, Failing L, Harstone M, Long G, McDaniels T, Ohlson D. Structured Decision Making: A Practical Guide to Environmental Management Choices. Chichester, UK: Wiley-Blackwell; Keeney RL. Utility Functions for Multiattributed Consequences. Management Science. 1972; 18: Stakeholder objectives (ie. x i ) and preferences (ie. V i ( ∙ ) and w j ) are inferred using transcripts of EATL regulatory hearings [1,2]

Methods: System Model 9 A geographic information system (GIS) model In each cell, magnitude of the combined value function is calculated Using least cost path selection algorithms, combination of cells that forms the least cost path is identified

Illustrative Results 10

11 Area of interest and routes and routes proposed by the project proponent (ATCO Electric) An alternative segment has been proposed by a land owner group

12 Alternative route option 1 All high level objectives are weighted equally (W_res = W_env = W_eng)

13 Alternative route option 2 Preference for minimizing residential impacts is twice as that of other high level objectives (W_res = 2W_env = 2W_eng)

14 Alternative route option 3 Preference for minimizing environmental impacts is twice as that of other high level objectives (W_env = 2W_res = 2W_eng)

15 An Example of Tradeoff Analysis

Conclusions Our proposed framework inherently takes the multiple stakeholder objectives into account The framework provides the decision maker a set of alternatives and information about their consequences The case study demonstrated the application of the framework and the insights that can be obtained −spatial impact of decisions −information to facilitate trade-off analysis 16

Next Steps Incorporate uncertainty analysis −data limitations and uncertainties −value judgments Extend to a larger framework −full stakeholder engagement −tradeoff analysis Extend to other energy system decisions 17

Thank you 18 Ganesh Doluweera

Supplementary Information 19

System Model 20

Results – Consequence Table 21 ObjectiveR1R2R3 1. Residential 1.1 Residences within 200m of ROW Residences within 800m of ROW Environmental 2.1 River and water body crossings ESAs within 200m of ROW Engineering 3.1 Line length 93km89km 96km 3.2 Length of paralleled linear features 88km80km 84km 3.3 In-field cropland disturbances3.4km 5km 8km