Agenda - meeting of the GERDA Collaboration Board November 9,2005 1. Approval of Agenda 2. Approval of minutes of previous Collab Board meeting 3. Update.

Slides:



Advertisements
Similar presentations
The Re-Start Meeting Warren County School Strategic Planning Process Action Team Leaders September 25, 2013.
Advertisements

Proposal for a Constitution for MICE A Plan for Discussion P Dornan G Gregoire Y Nagashima A Sessler.
LHCbComputing LHCb Computing Tasks. December Status of Computing Personnel m Currently available people insufficient to cover all activities o Estimate.
Proposal for a Constitution for MICE A Plan for Discussion P Dornan G Gregoire Y Nagashima A Sessler.
ATLAS Authorship Policy R. Voss Physics Department, CERN IUPAP C11 ICHEP’04, Beijing, China, August 18, 2004.
How Thoughts Become Laws. FOREWORD Anyone may get an idea that “there ought to be a law”. If others agree, including a member of Congress, a bill to implement.
Development and Quality Plans
Development plan and quality plan for your Project
Planning. SDLC Planning Analysis Design Implementation.
S ECRETARIAT Division Secretariat Advisory Preparing Meeting Agendas & Minutes Presented by Myron Iseminger.
Update on the California Dairy Future Task Force and moving forward December 5, 2012 CONFIDENTIAL AND PROPRIETARY Any use of this material without specific.
3 Dec 2003Market Operations Standing Committee1 Market Rule and Change Management Consultation Process John MacKenzie / Darren Finkbeiner / Ella Kokotsis,
TETF Workshop. Agenda Eligibility Applying for the Award Application process and submission guidelines.
2 nd Steering Committee Meeting October 2008, Athens and Aegina.
EuCARD-2 is co-funded by the partners and the European Commission under Capacities 7th Framework Programme, Grant Agreement Overview of EuCARD-2.
1 13 th RD51 CB meeting – 15/10/2013 AGENDA 1.Approval of the agenda 2.Approval of the minutes of the previous meeting (July 7, 2013; distributed on 24/9/2013.
1 CERN, 14-17/10/2013 IXIII RD51 CB meetingSilvia DALLA TORRE 13 th RD51 CB meeting – 15/10/2013 REPORT TO THE COLLABORATION.
EARTO – working group on quality issues – 2 nd session Anneli Karttunen, Quality Manager VTT Technical Research Centre of Finland This presentation.
1 02/02/13 Future Vision Midterm Information. 2 Future Vision A New Grants Model June 30, 2013 – No more DSGs or MGs July 1, 2013 all Rotary clubs throughout.
The Catenian Association Restructure Commission GB Membership Consultation.
Leadership Growth & Development Series Senior Cabinet Session 2.
RACS coordination meeting 29 May 2008 Brussels. Review of the functioning of the RACs.
TETF Workshop. Agenda Eligibility Applying for the Award Application process and submission guidelines.
Delaware Health Benefit Exchange (HBE) Project Update Delaware Health Care Commission Meeting: March 28, 2013.
EddiCam: The Eddington Photometric Camera EddiCam Definition Phase Kick-Off Meeting J. Miguel Mas-Hesse Vienna, 17th Sept., 2001.
Research & Technology Implementation TxDOT RTI OFFICE.
March 4, 2011Outlook and Guidance - Zisman1 MAP Outlook and Guidance Michael S. Zisman* Center for Beam Physics Accelerator & Fusion Research Division.
GOVERNOR’S EARLY CHILDHOOD ADVISORY COUNCIL (ECAC) September 9, 2014.
HL-LHC FP7 DS Status of the proposal Lucio Rossi - CERN 3rd General Meeting for application preparation – CERN 20 October.
Societies Assembly Please Sign in at the Desk to receive your voting card Wednesday 3 rd June.
HiLumi LHC is co-funded by the EU FP7 Capacities Programme, Grant Agreement Svet Stavrev (EU Projects Office, CERN) Administrative Manager 17.
International Accelerator Facility for Beams of Ions and Antiprotons at Darmstadt CBM Collaboration meeting Status Interim MoU J. Eschke, GSI.
Basic principles of possible new international legal framework in energy Feygin V.I. Principal Director, Institute for Energy and Finance.
HIGHLIGHTS From the PHOENIX MEETING December 2002.
STEP 4 Manage Delivery. Role of Project Manager At this stage, you as a project manager should clearly understand why you are doing this project. Also.
CARBOOCEAN Annual meeting, December 2007 Finance and administration by Hege D. Høiland SIXTH FRAMEWORK PROGRAMME PRIORITY “Global Change.
Consult21 Information is subject to change and is for discussion purposes only. Any dates/timings are the current anticipated timescales and may be subject.
Making your Committee Work
Upgrade projects and APT update DT-LHCb coordination meeting 28 September 2015.
Overview Remarks for US ITER-TBM Conference Call June 23, 2005 Mohamed Abdou.
CD FY09 Tactical Plan Status FY09 Tactical Plan Status Report for Neutrino Program (MINOS, MINERvA, General) Margaret Votava April 21, 2009 Tactical plan.
Developing & Maintaining Policies & Procedures 2007 National Leadership Conference.
1 Future Circular Collider Study Preparatory Collaboration Board Meeting September 2014 R-D Heuer Global Future Circular Collider (FCC) Study Goals and.
Report of the Technical Subcommittee Mario Bergeron, Technical Subcommittee Chair/NGEC Vice Chair.
Few introductory remarks on topical meetings…. System safety review Dense schedule of meetings with LNGS and safety experts during last six months Various.
RaDIATE Admin Meeting October /09/14P. Hurh RaDIATE Oct 2014 Admin Meeting 1.
CERN openlab Phase 5 Preparation (Technical) Alberto Di Meglio CERN openlab CTO office.
MUON Project Overview Action Items from September meeting New Action Items Update to the List of Worries Update of plans for the next 6 months.
ISIS Project Status Report May 18, 2006 Prepared by MAXIMUS, Inc Education Systems Division for the ABT Committee.
ELIXIR SAB Feedback December 2014.
Business Documents: Agenda and Minutes
Time to resolve Design Issues 1. Disclamer Due to the engineering meeting last week I have not had time to coordinate this material with Tim or the L3.
Consortium Agreement Kari-Jouko Räihä. Characteristics  Origin Basis: UNECA (Unified Network of Excellence Consortium Agreement) Terminology adapted.
AMICI WP1 – Management, coordination and dissemination
Deliverables, final review and final reporting
Updating the Regulation for the JINR Programme Advisory Committees
Prototyping with industry WP5: Round Table Discussion
MADMAX draft MoU preamble:
Physics Analysis Summaries towards a proposal
Seventh RD51 CB – 14/4/2011 AGENDA Approval of the agenda
The Process of Call based Project Funding by BMBF
Impact Fee Advisory Committee November 10, 2016
ASP2018 – Preparation K. A. Assamagan BNL.
S4 will be a “big” Collaboration:
Civic Center Sports Field Study Session & Quarterly Update
Cost of Service Analysis & Rate Design
Status of the Water Tank
Third wall/skin concept
DSC ChMC CSS update 11th December 2018
Adult Education Survey Anonymisation Point 6
Presentation transcript:

Agenda - meeting of the GERDA Collaboration Board November 9, Approval of Agenda 2. Approval of minutes of previous Collab Board meeting 3. Update on schedule a. news from LNGS Scientific committee meeting: positive response from referees and committee. Main issue addressed is the impact on the GERDA schedule due to the third wall issue and the splitting of the water tank and superstructure tender. Separate meeting with Coccia - 1) water is acceptable as a shielding medium around the LN or LAr tank, 2) Cu is accepted for the cryostat, 3) with 3rd wall, the GERDA safety concept is acceptable, 4) LNGS will provide the evacuation plan, 5) LNGS will perform simulations of evaporation rates. Discussed time scale for funding of superstructure - new money available 5/06. Suggested meeting with INFN president (Petronzio) at time of signing MoU to discuss possibilities for acceleration. b. news from subgroups which could affect the schedule. -TG1 Concern was expressed by Russian groups about preparations for the opening of the detectors. A list of points which should be resolved before detectors are opened will be prepared.

-TG2 major concern at this point is the crystal growing. -TG4 schedule relies on decision on third wall. Need to decide on acceptable solution. Collaboration discussion - Lexan no longer an option. Need to determine if have a solution with Copper. This should happen by the end of January. Personal comment: ice shielding looks interesting, but would likely need more time to evaluate. c. new schedule New schedule must be developed as soon as 3rd wall option is clear and we have a design. Having a schedule is extremely important, but it has to be believable ! Stefan & program management team made significant progress on a detailed schedule - iterate putting what we learned about interdependencies, commissioning times, etc. P.1

4. Status IGEX detectors Reported by Stefan - transport from CANFRANC to LNGS next week. 5. Update on finances Overall, we have a shortfall of resources, but this does not impact the current work. We have the flexibility to cover the 3rd wall with available resources (if reasonable cost), but will create a larger long-tern deficit. Looking into options. INTAS pre-proposal approved. Jan deadline for full proposal (30% of proposal are approved). Bilateral agreements Russia-Germany may give possibility for Russian groups to apply for funds. Will be discussed. 6. MoU - status The MoU has been signed by MPI-WHI, MPI-K, Tübingen and is now in Italy. Signing procedure in Italy is complicated (several bodies need to agree). HADES group to be added in addendum, but they still need to review in detail.

8. Proposed rules for authorship, result presentation, editorial board A set of rules have been distributed and discussed. Accepted with a few changes. The EB (I. Abt, A. Bettini, J. Jochum, B. Schwingenheuer + S. Schoenert, C. Cattadori ex-officio) should elect a chairperson. Upcoming GERDA publications have been mentioned. 9. Task Group 9 - redefinition of task ? Description of task group did not match reality: Old: Software (offline/database/code management) New: DAQ including online software. The group is responsible for the design & coordination of all DAQ activities. Coordinator remains B. Schingenheuer. Note: new task group will have to be formed to cover the offline software aspects. Future meeting. 7. Open Collaboration positions a. RAE b. GLIMOS Names for RAE and GLIMOS were discussed, but no final agreement yet. c. Project Engineer Have a young engineer which will work on the project starting in December. Still looking for more experienced person.

10. Dates & Locations for upcoming meetings. a /2/06 Heidelberg b /6/06 LNGS c. week of 13/11/06 Milano d. other workshops/conferences Neutrino /6/06 No attempt made to generate full list. Speakers bureau should look into upcoming conference & workshops and determine where GERDA should be represented. 11. AOB Each institute should provide request for office space at LNGS to M. Junker. Request should specify when & how many people New members of CB: E. Belotti, Milano (C. Cattadori is ex-officio) M. Hult HADES