Stefan Hild 1Ilias WG1 meeting, Sep 2005, Perugia Title GEO 600 Commissioning progress Max-Planck-Institut für Gravitationsphysik (Albert-Einstein-Institut)

Slides:



Advertisements
Similar presentations
Stefan Hild for the GEO600 team October 2007 LSC-Virgo meeting Hannover Homodyne readout of an interferometer with Signal Recycling.
Advertisements

Max-Planck-Institut für Gravitationsphysik (Albert-Einstein-Institut) HOMODYNE AND HETERODYNE READOUT OF A SIGNAL- RECYCLED GRAVITATIONAL WAVE DETECTOR.
19. October 2004 A. Freise Automatic Alignment using the Anderson Technique A. Freise European Gravitational Observatory Roma
Status of the Virgo Commissioning G.Losurdo – INFN Firenze/Urbino for the Virgo Collaboration.
Cascina, January 25th, Coupling of the IMC length noise into the recombined ITF output Raffaele Flaminio EGO and CNRS/IN2P3 Summary - Recombined.
Stefan Hild Ilias WG1 meeting, Casina, Januar 2005 Title Scattered Light at GEO 600 Max-Planck-Institut für Gravitationsphysik (Albert-Einstein-Institut)
Lock-in amplifiers Signals and noise Frequency dependence of noise Low frequency ~ 1 / f –example: temperature (0.1 Hz), pressure.
Takanori Sekiguchi Italy-Japan Workshop (19 April, 2013) Inverted Pendulum Control for KAGRA Seismic Attenuation System 1 D2, Institute for Cosmic Ray.
Cascina, January 24, 2005 Status of GEO600 Joshua Smith for the GEO600 team.
Locking improvements after the end of VSR1 Gabriele Vajente for the Locking Group 14 th ILIAS WG1 meeting Cascina – March 6 th 2008.
1 ILIAS WG1 meeting, Hannover, Alignment electronics noise budget ● Sources of electronic noise ● C7 electronic noise ● Electronic noise for.
LIGO-G W Proposed LHO Commissioning Activities in May 02 Fred Raab 29 Apr 02.
1 Virgo Commissioning progress and plans ILIAS, Jan 23 rd 2007 Matteo Barsuglia on behalf of the Commissioning Team.
rd ILIAS-GW annual general meeting 1 VIRGO Commissioning progress J. Marque (EGO)
LIGO- G060XXX-00-R E2E meeting, September How to design feedback filters? E2E meeting September 27, 2006 Osamu Miyakawa, Caltech.
Calibration of TAMA300 in Time Domain Souichi TELADA, Daisuke TATSUMI, Tomomi AKUTSU, Masaki ANDO, Nobuyuki KANDA and the TAMA collaboration.
COMMISSIONING PROGRESS G.LOSURDO – INFN Firenze for the Virgo Collaboration.
Lock-in amplifiers
Towards dual recycling with the aid of time and frequency domain simulations M. Malec for the GEO 600 team Max-Planck-Institut für Gravitationsphysik Albert-Einstein-Institut.
Virgo Control Noise Reduction
Stefan Hild 1ILIAS WG1 meeting, Cascina, November 2006 Comparison of tuned and detuned Signal-Recycling Stefan Hild for the GEO-team.
Max-Planck-Institut für Gravitationsphysik (Albert-Einstein-Institut) Institut für Atom- und Molekülphysik Detector Characterization of GEO 600 during.
1 Ist Virgo+ review Cascina H. Heitmann Alignment: Virgo+ changes.
Joshua Smith December 2003 Detector Characterization of Dual-Recycled GEO600 Joshua Smith for the GEO600 team.
Optical Configuration Advanced Virgo Review Andreas Freise for the OSD subsystem.
Interferometer Control Matt Evans …talk mostly taken from…
March 17, 2008LSC-Virgo meeting1/12 Virgo Status B. Mours.
Stefan Hild October 2007 LSC-Virgo meeting Hannover Interferometers with detuned arm cavaties.
GEO‘s experience with Signal Recycling Harald Lück Perugia,
Stefan Hild 1Ilias WG1 meeting, June 2005 Title Beam clipping Problems in GEO 600 ?? Max-Planck-Institut für Gravitationsphysik (Albert-Einstein-Institut)
ILIAS – WG1 Hierarchical suspension control G.Losurdo INFN Firenze.
Takanori Sekiguchi External Review Alignment control servo for type-B/type-Bp (OpLev/WFS) 1 T. Sekiguchi.
Gabriele Vajente ILIAS WG1 meeting - Perugia Couplings of angular noises into dark fringe Diffused light studies.
GEO600 Detector Status Harald Lück Max-Planck Institut für Gravitationsphysik Institut für Atom- und Molekülphysik, Uni Hannover.
Electrostatic actuators: from the GEO experience to the 2 nd generation requirements Harald Lück Perugia,
Squeezed light and GEO600 Simon Chelkowski LSC Meeting, Hannover.
1 Virgo commissioning: Next steps December 12 st 2005 Hannover, ILIAS-GWA WG1 Matteo Barsuglia, LAL/CNRS.
1 Virgo Commissioning progress ILIAS, Nov 13 th 2006 Matteo Barsuglia on behalf of the Commissioning Team.
Stefan Hild 1GWDAW 10, Brownsville, December 2005 Status of GEO 600 Stefan Hild, AEI Hannover for the GEO-team.
Harald Lückfor the GEO600 Comissioning team 1ILIAS Meeting, Palma, Oct Title GEO 600 Commissioning Status Based on a talk of Stefan Hild for the.
1 The Virgo noise budget Romain Gouaty For the Virgo collaboration GWADW 2006, Isola d’Elba.
Abstract The Hannover Thermal Noise Experiment V. Leonhardt, L. Ribichini, H. Lück and K. Danzmann Max-Planck- Institut für Gravitationsphysik We measure.
Paolo La Penna ILIAS N5-WP1 meeting Noise analysis in Virgo Cascina, 7-8 July 2004 Analysis of noise in VIRGO.
Nov 3, 2008 Detection System for AdV 1/8 Detection (DET) Subsystem for AdV  Main tasks and requirements for the subsystem  DC readout  Design for: the.
Perugia, Italy Reducing the Noise in GEO600 Joshua Smith for the GEO 600 team.
08/24/2004 Stefan Ballmer, MIT / LIGO Hanford G I 1 Hanford 4km Recent improvements and currently limiting noise sources Stefan Ballmer Massachusetts.
ILIAS WG1 meeting Han/Ruthe Harald Lück ILIAS WG1 meeting, Sep. 2004, Hannover/Ruthe GEO Status (Update)
M. Mantovani, ILIAS Meeting 7 April 2005 Hannover Linear Alignment System for the VIRGO Interferometer M. Mantovani, A. Freise, J. Marque, G. Vajente.
Dual Recycling in GEO 600 H. Grote, A. Freise, M. Malec for the GEO600 team Institut für Atom- und Molekülphysik University of Hannover Max-Planck-Institut.
1 Virgo Commissioning Status WG1 meeting Potsdam, 21 st July 2006.
Stefan Hild 111th WG1 meeting, Hannover, January 2007 DC-Readout for GEO Stefan Hild for the GEO-team.
Paolo La Penna ILIAS N5-WP1 meeting Commissioning Progress Hannover, July 2004 VIRGO commissioning progress report.
LIGO-G Z March 2007, LSC meeting, Osamu Miyakawa 1 Osamu Miyakawa Hiroaki Yamamoto March 21, 2006 LSC meeting Modeling of AdLIGO arm lock acquisition.
Caltech, February 12th1 Virgo central interferometer: commissioning and engineering runs Matteo Barsuglia Laboratoire de l’Accelerateur Lineaire, Orsay.
Monica VarvellaIEEE - GW Workshop Roma, October 21, M.Varvella Virgo LAL Orsay / LIGO CalTech Time-domain model for AdvLIGO Interferometer Gravitational.
Joshua Smith July 2004 Identifying limiting noise sources of GEO600 ILIAS WG1 Meeting Joshua Smith for the GEO team.
Joshua Smith August Identifying and eliminating limiting noise sources of GEO600 LSC Meeting, Hanford WA, August `04 Joshua Smith for the GEO team.
Status of GEO600 Benno Willke for the GEO600 team ESF Exploratory Workshop Perugia, September 2005.
GEO Status and Prospects Harald Lück ILIAS / ETmeeting Cascina November 2008.
Stefan Hild 1GWADW, Elba, May 2006 Experience with Signal- Recycling in GEO 600 Stefan Hild, AEI Hannover for the GEO-team.
GEO600 – The output mode cleaner Mirko Prijatelj for the GEO600-Team Institute for Gravitational Physics Albert-Einstein-Institute Hannover / Germany.
Detuned Twin-Signal-Recycling
The Proposed Holographic Noise Experiment
GEO600 Control aspects where do the error signal come from?
Lock-in amplifiers
Homodyne readout of an interferometer with Signal Recycling
Commissioning progress Stefan Hild Ilias WG1 meeting, Sep 2005
Calibration of TAMA300 in Time Domain
Workshop on Gravitational Wave Detectors, IEEE, Rome, October 21, 2004
Talk prepared by Stefan Hild AEI Hannover for the GEO-team
Presentation transcript:

Stefan Hild 1Ilias WG1 meeting, Sep 2005, Perugia Title GEO 600 Commissioning progress Max-Planck-Institut für Gravitationsphysik (Albert-Einstein-Institut) Stefan Hild Ilias WG1 meeting, Sep 2005

Stefan Hild 2Ilias WG1 meeting, Sep 2005, Perugia GEO 600 layout kW 0.09

Stefan Hild 3Ilias WG1 meeting, Sep 2005, Perugia Tuning signal recycling to 300 Hz Better knowledge of IFO parameters:  more accurate prediction from simulations  downtuning to 200 Hz realized Fixed instability of MI auto- alignment by setting up a new telescope for DWS. We will stay at 330 Hz !

Stefan Hild 4Ilias WG1 meeting, Sep 2005, Perugia GEO 600 design sensitivity

Stefan Hild 5Ilias WG1 meeting, Sep 2005, Perugia Calibration and demod 300 Hz Using signal recycling  GW signal is split in P and Q quadrature P-response independant of demod phase Q-response only for larger than 20 to 30 deg demod phase compatible with current calibration (zero + complex pole) Decided to use 40 deg for time being. Drawback: ‚P‘ used for MI servo is not really only ‚P‘

Stefan Hild 6Ilias WG1 meeting, Sep 2005, Perugia High RF on HPD / Q-compensation Observations: Found huge RF level after MI diode (1 Volt) Large DC level in Q after mixing. Q-compensation: Injected RF directly into resonance circuit of the HPD to make Q DC level zero. Improved sensitivity above 700 Hz Q-comp OFF Q-comp ON

Stefan Hild 7Ilias WG1 meeting, Sep 2005, Perugia RF setup OLD setup New setup: Using a less noisy splitter(0/90°) Using a cable as phaseshifter NEW setup Old setup: Dominated by phase noise in the LO path (phaseshifter and splitter(0/90°) Due to this noise from Q was mixed into P quadrature. That is why Q- compensation worked.

Stefan Hild 8Ilias WG1 meeting, Sep 2005, Perugia Shot noise Green line is the shot noise level calculated from the DC current of the photodiode. We are within a factor sqrt(2) shot noise limited above 1kHz !

Stefan Hild 9Ilias WG1 meeting, Sep 2005, Perugia Future RF setup Proposed by Rana and others GOALS: Using only high quality hardware Guaranteeing high RF levels in all components

Stefan Hild 10Ilias WG1 meeting, Sep 2005, Perugia Noise projections 21 st of july

Stefan Hild 11Ilias WG1 meeting, Sep 2005, Perugia Noise in the SR-long loop Noise in the detection band is entirely limited by front-end- noise (shot noise from the detector). Limits sensitivity from 100 to 500 Hz PROBLEM Large locking range OLG of 10^6 at 0.1 Hz No feedback noise above100 Hz Requirements 1.Servo has a locking mode and a running mode 2.Lowering UGF to get less gain in detection band 3.Using lowpass filter with very steep roll off above UGF (implemeted using a dSPACE system) Solutions

Stefan Hild 12Ilias WG1 meeting, Sep 2005, Perugia Analog SR electronics Red = acq amp, green = acq pha Dark blue = run amp, brown = run phase Light blue = run2 amp, pink = run2 pha

Stefan Hild 13Ilias WG1 meeting, Sep 2005, Perugia Signal Recycling digital Hz = -147 deg

Stefan Hild 14Ilias WG1 meeting, Sep 2005, Perugia SR feedback: analog vs. digital

Stefan Hild 15Ilias WG1 meeting, Sep 2005, Perugia SR loop filter future design Filter not used at the moment. Can be implemented when more gain is needed around pendulum resonances Four complex integrators: 2.25 (2x),1.3, 0.56 Hz

Stefan Hild 16Ilias WG1 meeting, Sep 2005, Perugia Sensitivity improvement July to August High frequency improvements: reduction of RF phase noise Low frequency improvements: reduction of Signal recycling feedback noise

Stefan Hild 17Ilias WG1 meeting, Sep 2005, Perugia PR-bench Historically grown layout of PR-bench not optimal ! beam clipping too many transmissive optical components too many polarizing components acoustic coupling Goal: Shorten and simplify the HPD path

Stefan Hild 18Ilias WG1 meeting, Sep 2005, Perugia Sensitivity after PR bench work Removed resonance structures between 100 and 200 Hz.

Stefan Hild 19Ilias WG1 meeting, Sep 2005, Perugia Noise projections 21 st of july

Stefan Hild 20Ilias WG1 meeting, Sep 2005, Perugia Michelson length control < 0.1Hz

Stefan Hild 21Ilias WG1 meeting, Sep 2005, Perugia < 10 Hz < 0.1Hz Michelson length control Reaction Pendulum: 3 coil-magnet actuators at intermediate mass, range ~ 100µm

Stefan Hild 22Ilias WG1 meeting, Sep 2005, Perugia < 10 Hz > 10 Hz < 0.1Hz Michelson length control Reaction Pendulum: 3 coil-magnet actuators at intermediate mass, range ~ 100µm Electrostatic actuation on test mass bias 630V, range 0-900V= 3.5µm

Stefan Hild 23Ilias WG1 meeting, Sep 2005, Perugia Using ESD as actuator Force is proportional to square of applied voltage. high voltages are needed for bipolar acting a bias voltage needs to be applied Noise is introduced: loop electronics sqrt circuits intrinsic HV amplifier noise

Stefan Hild 24Ilias WG1 meeting, Sep 2005, Perugia Sqrt circuits in MI loop ESD: F  U^2 Sqrt circuits are necessary to give full linear force range for acquisition. Drawback: sqrt circuits are noisy 1µV/sqrt(Hz) ESD)

Stefan Hild 25Ilias WG1 meeting, Sep 2005, Perugia ESD: F  U^2 Sqrt circuits are necessary to give full linear force range for acquisition. Drawback: sqrt circuits are noisy 1µV/sqrt(Hz) ESD) Bypassing sqrt circuits after lock is acquired. Sqrt circuits in MI loop

Stefan Hild 26Ilias WG1 meeting, Sep 2005, Perugia Noise in MI loop HVA noise = 100nV/sqrt(Hz) ESD) HV-amplifier noise can be reduced by decreasing bias voltage or active noise suppression. Suppressing noise introduced by loop electronics needs whitening

Stefan Hild 27Ilias WG1 meeting, Sep 2005, Perugia MI loop whitening / dewhitening dewhiten Whiten Whitening right after mixer: zero 3.5 Hz pole 35 Hz Dewhitening for both split passes Passive dewhit- ening done in HV path (0-1kV)

Stefan Hild 28Ilias WG1 meeting, Sep 2005, Perugia Sensitivity after fixing noise from MI loop

Stefan Hild 29Ilias WG1 meeting, Sep 2005, Perugia Michelson servo design

Stefan Hild 30Ilias WG1 meeting, Sep 2005, Perugia MI loop gain problem Strange observations: We are not able to increase the low frequency loop gain, even though it should work from loop model (oscillation around 8 Hz) OLG measurements show that there is nearly no gain around 8 to 10 Hz. We needed to turn down the MI crossover gain continiously for the last few months Findings: Influence of MI AA gain on maximum cross over frequency (AA-tilt ,  cross over possible.  phase margin of crossover, can  crossover frequency, but adding integrator still causes 8Hz oscillation  IM gain (  crossover frequency),  less noise in servo 4 to 8 Hz.  IM gain, still low gain around 8 to 10 Hz (low gain can‘t be caused by IM)

Stefan Hild 31Ilias WG1 meeting, Sep 2005, Perugia Injecting LF noise in MI loop Injected noise from 5 to 11 Hz Between 6 and 7 Hz the noise is not suppressed !

Stefan Hild 32Ilias WG1 meeting, Sep 2005, Perugia Measurement of open loop gain (PRMI) Resonance structure is clearly visible Very low gain around 9 Hz Design gain:  15 Hz  10 Hz  6 Hz

Stefan Hild 33Ilias WG1 meeting, Sep 2005, Perugia Mi servo design detail

Stefan Hild 34Ilias WG1 meeting, Sep 2005, Perugia TF: Alignment to longitudinal Tilt couples a factor of 10 stronger than 10 Hz. (IM-FF tilt2long) Why are the two rot-TF so different?

Stefan Hild 35Ilias WG1 meeting, Sep 2005, Perugia How to go on with the MI loop gain problem Measure MI loop gain for various conditions to decouple crossover and AA-tilt. Implementing digital AA control to be more flexible (nearly done). Measure tilt2long for single suspensions, with the goal of setting up a FF system. Investigate possible advantages of using the ESDs for angular alignment.....

Stefan Hild 36Ilias WG1 meeting, Sep 2005, Perugia Segmented ESD for alignment

Stefan Hild 37Ilias WG1 meeting, Sep 2005, Perugia Sensitivity improvement of GEO

Stefan Hild 38Ilias WG1 meeting, Sep 2005, Perugia Latest noise projections

Stefan Hild 39Ilias WG1 meeting, Sep 2005, Perugia Current sensitivity vs. Design sensitivity

Stefan Hild 40Ilias WG1 meeting, Sep 2005, Perugia Discussion Michelson loop gain problem: What experience exists in VIRGO with angular to longitudinal and longitudinal to angular couplings ? Is somewhere gain lost ?... Digital filtering: What kind of filters are used within VIRGO for steep roll off?

Stefan Hild 41Ilias WG1 meeting, Sep 2005, Perugia E n d