HIMALAYA Test Review 16/12/2013 STI Deliverables: D4.1, D4.2 and D4.5.

Slides:



Advertisements
Similar presentations
Episode 3 / CAATS II joint dissemination event Lessons Learnt Episode 3 - CAATS II Final Dissemination Event Philippe Leplae EUROCONTROL Episode 3 Brussels,
Advertisements

Lorentz force detuning measurements on the CEA cavity
System Construction and Implementation Objectives:
P08009 Audible Memo Board Phase II Friday, February 22, 2008 P08009: Audible Memo Board Phase II Sponsor: Dr. Hopkins Advisor: Professor Slack Jon GosligaElectrical.
Global Navigation Satellite Systems Research efforts in Luleå Staffan Backén, LTU Dr. Dennis M. Akos, LTU.
Distance-decreasing attack in GPS Final Presentation Horacio Arze Prof. Jean-Pierre Hubaux Assistant: Marcin Poturalski January 2009 Security and Cooperation.
Threshold Voltage Assignment to Supply Voltage Islands in Core- based System-on-a-Chip Designs Project Proposal: Gall Gotfried Steven Beigelmacher 02/09/05.
Chapter 11: Testing The dynamic verification of the behavior of a program on a finite set of test cases, suitable selected from the usually infinite execution.
United Nations Economic Commission for Europe Statistical Division Applying the GSBPM to Business Register Management Steven Vale UNECE
BY MD YOUSUF IRFAN.  GLOBAL Positioning System (GPS) receivers for the consumer market require solutions that are compact, cheap, and low power.  This.
AIDA is co-funded by the European Commission within the Framework Programme 7 Capacities Specific Programme, Grant Agreement AIDA status report.
© 2013 The MITRE Corporation. All rights reserved. SBAS IWG #25 Meeting St Petersburg, Russia June 2013 Roland Lejeune RTCA SC-159 Working Group.
A US Program to Identify, Geolocate, and Mitigate Sources of GPS Interference But are we serious? Terry McGurn/Consultant Presented to the EXEC PNT Advisory.
-Nikhil Bhatia 28 th October What is RUP? Central Elements of RUP Project Lifecycle Phases Six Engineering Disciplines Three Supporting Disciplines.
An Ultra-Wide-Band GHz LNA in 0.18µm CMOS technology RF Communication Systems-on-chip Spring 2007.
HIMALAYA Test Review 16/12/2013 D4.4 Test platform development unitary test report.
GNSS Receiver - Software Radio Concept František Vejražka Czech Technical University in Prague Faculty of Electrical Engineering.
Availability of the EGNOS service for land mobile user Pavel Kovář, Libor Seidl, František Vejražka Czech Technical University in Prague Faculty of Electrical.
US WG-A Presentation on Compatibility and Interoperability at the 3 rd meeting of the ICG Lt Col Patrick Harrington Office of the Under Secretary of the.
1 LAVAL UNIVERSITY DEPARTMENT OF GEOMATICS Mohammed Boukhecha (Laval University) Marc Cocard (Laval University) René Landry (École technique supérieure.
Silicon Solutions for the Real World 1 AID-EMC Automotive IC Design for Low EMC Review Meeting 29 augustus 2006 VILVOORDE.
1.  Describe an overall framework for project integration management ◦ RelatIion to the other project management knowledge areas and the project life.
Executive Session Director’s CD-3b Review of the MicroBooNE Project January 18, 2012 Dean Hoffer.
Research and Writing Seminar Thursday, – 16 35, room C To find an up-to-date version of the schedule and to read the papers check the website
Current and Future Applications of the Generic Statistical Business Process Model at Statistics Canada Laurie Reedman and Claude Julien May 5, 2010.
1 Programming of FPGA in LiCAS ADC for Continuous Data Readout Week 3 Report Jack Hickish.
Copyright © The OWASP Foundation Permission is granted to copy, distribute and/or modify this document under the terms of the OWASP License. The OWASP.
Irwin/McGraw-Hill Copyright © 2004 The McGraw-Hill Companies. All Rights reserved Whitten Bentley DittmanSYSTEMS ANALYSIS AND DESIGN METHODS6th Edition.
STAGE #5: CLOSING 5 Process Stages of Project Management.
WLCG Grid Deployment Board, CERN 11 June 2008 Storage Update Flavia Donno CERN/IT.
Workshop - November Toulouse Astrium Use Case.
© 2014 The MITRE Corporation. All rights reserved. SBAS IWG #26 Meeting Delhi, India 5-7 February 2014 Roland Lejeune RTCA SC-159 Working Group 2 Summary.
TB1: Data analysis Antonio Bulgheroni on behalf of the TB24 team.
EMI INFSO-RI Guidelines and SQA Process Maria Alandes Pradillo (CERN) SA2.2 Task Leader.
Tightly-Coupled Opportunistic Navigation for Deep Urban and Indoor Positioning Ken Pesyna, Zak Kassas, Jahshan Bhatti, and Todd Humphreys Presentation.
CSC 480 Software Engineering Test Planning. Test Cases and Test Plans A test case is an explicit set of instructions designed to detect a particular class.
G.Govi CERN/IT-DB 1 September 26, 2003 POOL Integration, Testing and Release Procedure Integration  Packages structure  External dependencies  Configuration.
Rational Unified Process Fundamentals Module 4: Core Workflows II - Concepts Rational Unified Process Fundamentals Module 4: Core Workflows II - Concepts.
Pixel power R&D in Spain F. Arteche Phase II days Phase 2 pixel electronics meeting CERN - May 2015.
Bina Nusantara 19 C H A P T E R SYSTEM CONSTRUCTION AND IMPLEMENTATION.
LC Power Distribution & Pulsing Workshop, May 2011 Super-ALTRO Demonstrator Test Results LC Power Distribution & Pulsing Workshop, May nd November.
1 GRPE Informal Working Group on Heavy Duty Hybrids UNITED NATIONS Report to GRPE 65 Geneva, 17 January 2013 Informal document No. GRPE (65th GRPE,
Project: IEEE P Working Group for Wireless Personal Area Networks (WPANS) Submission Title: [UWB System Design for Low Power, Precision Location.
Common test for L0 calorimeter electronics (2 nd campaign) 4 April 2007 Speaker : Eric Conte (LPC)
Section Topics Determine appropriate follow-up activity by the internal audit activity Identify appropriate method to monitor engagement outcomes Conduct.
What has been accomplished at the end of MSD 1 & 2?
BTEC L3 Extended Unit 1 – Communication and Employability Skills for IT.
Development Project Management Jim Kowalkowski. Outline Planning and managing software development – Definitions – Organizing schedule and work (overall.
Dr.F. Arteche EMC DEPFET Project: A general overview.
Redundancy in Dynamic Positioning (DP) Applications based on Satellite Navigation. High Precision Navigation and Positioning Conference,
BES III Software: Beta Release Plan Weidong Li 19 th October 2005.
NCKU_UCB_TohokuISUAL-IFR : DCM (version 2.0) July 9, 2001Tong-Long Fu 1 Data Compression Module ( DCM ) Tong-Long Fu Laboratory of RF-MW Photonics, Department.
1 Presented by: Val Pennell, Test Tool Manager Date: March 9, 2004 Software Testing Tools – Load Testing.
Telecommunication Laboratories Jia-Lun Wang, Shinn-Yan Lin, Yi-Jiun Huang, Huang-Tien Lin and Chia-Shu Liao APMP 2012 November 26, 2012 MSL Wellington,
Software Testing-STLC
GUIDO VOLPI – UNIVERSITY DI PISA FTK-IAPP Mid-Term Review 07/10/ Brussels.
SE40 Meeting on Pseudolites JRC test results
CMS:Children Monitoring System
Software Configuration Management
Applied Software Implementation & Testing
Phase 1 Tollgate Review Discussion Template
MGEX Working Group Progress on recommendations made at the 2016 IGS workshop in Sydney, Australia Presented to the IGS Governing Board and Associate Members.
Systems Construction and Implementation
System Construction and Implementation
Systems Construction and Implementation
OWASP Application Security Verification Standard
Performance requirements update
M. Kezunovic (P.I.) S. S. Luo D. Ristanovic Texas A&M University
Overview Activities from additional UP disciplines are needed to bring a system into being Implementation Testing Deployment Configuration and change management.
Issues for preparation and implementation of training sessions
Presentation transcript:

HIMALAYA Test Review 16/12/2013 STI Deliverables: D4.1, D4.2 and D4.5

Introduction and updates (1/2) ∙ The HIMALAYA GNSS receiver, codenamed Teseo III, is available as engineering samples for characterization and validation (started in second half of October). ∙ RF IP test chip also available (samples available from packaging sub- contractor by the end of November). ∙ Using the validation board with preliminary firmware (codenamed GNSS library Rel.8 beta version) the Teseo III GNSS receiver has achieved position fix with live signals using the following operating modes: GPS only, Galileo only, GPS+Galileo, GPS+GLONASS and BeiDou only (in this case signals has been recorded in Taiwanese offices). ∙ Galileo only fix performed also with signals from simulator due to the current Galileo constellation status. ∙ BeiDou only fix performed in Taiwan office 16/12/2013 2

Introduction and updates (1/2) ∙ Teseo II GNSS receiver with GNSS library Rel.8 beta version available on Evaluation Board and in the first version of the GNSS board for HIMALAYA demonstrator. ∙ A paper on the Teseo III RF IP has been accepted for IEEE/ION PLANS 2014 (May 5-8, Hyatt Regency, Monterey, California) ∙ It has been assigned to Session B5: Receiver and Antenna Technology, scheduled for Thursday, May 8, ∙ Extended abstract available on conference website ( ∙ A paper on quad-constellation receivers presenting Teseo III, also summarizing tests already performed on Teseo II with the GNSS rel.8 alpha version and preliminary tests on Teseo III has been accepted by GPSWorld (planned for January 2014 edition). ∙ Official launch of the Teseo III product in Q /12/2013 3

D4.1 summary ∙ The document summarizes the work performed in the frame of WP4000 Test Plan for HIMALAYA solution. ∙ Main RF functionalities have been checked and are working properly. The SOC validation board achieved positioning fix in several operating modes. But full characterization of the RF IP developed in the HIMALAYA framework is still on going. For this reason this document contains only partial results. ∙ We plan to close characterization of the RF IP by the end of January 2014 ∙ As soon as the data will be available, a new document version will be released. 16/12/2013 4

5 D4.1 RID ∙ Description: Some of the tests are still to be completed. When is this foreseen? ∙ Answer: The characterization tests for the RF IP are running and will be completed by the end of January ∙ No major issues identified so far. Tests completed: ∙ Power consumption in different operating mode (GPS only; GPS/Galileo; GLONASS only; BeiDou only; GNSS) ∙ S11 measurements and input matching. ∙ NF at 25 0 C for GPS/Galileo, GLONASS and BeiDou2. ∙ AGC gain range, maximum and minimum gains. ∙ Phase noise tests using two TCXO (26MHz and 48MHz) each for two charge pump currents using both IF test point (GPS/Galileo chain and GLONASS/BeiDou2 chain) at 20dB of gain in the AGC.

D4.2 summary ∙ This document summarizes validation tests on the BB part of the new GNSS SoC developed in HIMALAYA project according to the test plan in the frame of WP4000 Test Plan for HIMALAYA solution. ∙ Main BB functionalities have been checked and are working properly. The SOC validation board achieved positioning fix in several operating modes. ∙ But full validation of the BB IP’s is still on going. ∙ No major issues identified so far for system integration. ∙ For this reason this document contains only partial results. As soon as the data will be available, a new document version will be released. 03/11/2009 6

Main BB functionality tests 16/13/ Functional TestResultsNote Acquisition engine Functional test passed for GPS, Galileo, GLONASS and BeiDou signals Satellites acquired with real signals. Code generation Functional test passed for GPS, Galileo, GLONASS and BeiDou signals Galileo code generation performed reading the Galileo OS codes from memory. Tracking engine Basic functionalities tested for GPS, Galileo, GLONASS and BeiDou Satellite tracked with real signals. G3BBIP_SRAM_ACCESS Preliminary results are good, test to be completed Check SRAM access RW in all addresses

16/12/ D4.2 ∙ Description: It would be interesting to have some more information on which are the minor issues identified in some of the tests (what are they related to? Can they be fixed?) ∙ Answer: These tests will be completed by the end of January Most of the minor issues identified have been already fixed. The other ones identified so far can be fixed (recovery already put in place). Description of some of these issues can be introduced in the final version.

D4.5 summary ∙ The document summarizes characterization tests and measurements on the new GNSS SoC and related GNSS library developed in HIMALAYA project according to the test plan (WP4000 activities) ∙ The main HIMALAYA SoC (Teseo III) functionalities such as acquiring and tracking signals from the desired Satellite Positioning Systems have been verified using the SOC validation board. ∙ Positioning fixes with real signals have been also obtained in several operating modes, such as: GPS only; Galileo only (but fix quality was impacted by the poor constellation geometry having only four satellites at best); GPS+Galileo; GPS+GLONASS; GPS+BeiDou2; and BeiDou2 only. 16/12/2013 9

Teseo III SoC and GNSS library examples 16/12/

16/12/ D4.5 ∙ Description: The test strategy for the SoC is well described. In this version of the document several test are still to be completed. It is suggested to include in the final version in the conclusions also a descriptive assessment of the results obtained ∙ Answer: Tests on the SoC will be completed in January Final version of the document will include a descriptive assessment of the results obtained.

16/12/ Conclusions ∙ GNSS board for HIMALAYA final demonstrator available with Teseo II SoC. ∙ No delay foreseen for the Test and Integration phase. ∙ Validation and characterization of Teseo III GNSS receiver will be completed by the end of January 2014.

THANK YOU