EXETER A SSOCIATES, I NC. March 29, 2006February 17, 2008 1 New Transmission Initiatives for Renewable Energy and Some Thoughts on Wind Integration Kevin.

Slides:



Advertisements
Similar presentations
Briefing on California ISO Dynamic Transfers Stakeholder Process For WECC Seams Issues Subcommittee Meeting May 4, 2010 Jim Price, Lead Engineering Specialist.
Advertisements

1 ColumbiaGrid Update June 27, Activities Planning OASIS Redispatch 2.
New England’s Regional Renewable Resource Development Efforts New England States Committee on Electricity November 3, 2011.
1 RTWG Tariff update to the BOD, MOPC, SPC, and RSC January 4, 2005.
1 March 2, 2009 FERC Conference on Integrating Renewables Washington, DC Hamid Elahi Integrating Renewables into Power Systems GE Energy.
Queue Reform at the Midwest ISO NARUC February, 2008.
1 The Midwest ISO At the Crossroads of America International Meeting of Very Large Power Grid Operators October 24 & 25, 2005 Beijing, China.
5/22/20151 Northwest Power & Conservation Council Power Committee Over-generation and Negative Energy Prices – a work in progress Jeff King September 21,
EStorage First Annual Workshop Arnhem, NL 30, Oct Olivier Teller.
Utility Regulation March 10, 2011 Raj Addepalli Deputy Director, Electric, Office of Electric,Gas and Water New York State Department of Public Service.
The Status Of The Electric Grid In ERCOT The Electric Reliability Council Of Texas Sam R. Jones, P.E. ERCOT – Retired As a retiree of ERCOT this presentation.
RenewElec October 21, 2010 Robert Nordhaus, David Yaffe Van Ness Feldman 1050 Thomas Jefferson Street, NW Washington, DC (202) FERC’s.
THE TRES AMIGAS SUPERSTATION Southwest Renewable Energy Conference Santa Fe, NMSeptember 16 th 2010 UNITING THE NATION’S ELECTRIC POWER GRID.
National Renewable Energy Laboratory Innovation for Our Energy Future * NREL July 5, 2011 Tradeoffs and Synergies between CSP and PV at High Grid Penetration.
Anjali Sheffrin, Ph.D. Chief Economist & Director, Market Design & Product Development Integration of Wind Resources in CAISO Markets and Grid Operation.
GE Energy Asia Development Bank Wind Energy Grid Integration Workshop: Issues and Challenges for systems with high penetration of Wind Power Nicholas W.
1 Transmission Development at Ameren and in the Midwest ISO Mid-America Regulatory Conference Maureen A. Borkowski June 8, 2010.
Lynn Coles, PE National Wind Technology Center National Renewable Energy Laboratory Golden, Colorado USA 10 FAQ’s (Frequently Asked Questions) About Wind.
Western Wind Integration Study Kevin Porter – Exeter Associates, Inc. Brian Parsons, Michael Milligan, Debbie Lew – NREL DOE Wind Program Peer Review July.
Warren Lasher Director, System Planning October 4, 2014 Our Energy Future.
Renewable Energy Delivery, Scheduling, and Firming / Shaping
Western Wind Integration Study Debbie Lew NREL. Goal To support multi-state interests in understanding the operating and cost impacts due to the variability.
Eagle Crest Energy Company February Page 2 New Hydro: Making it Happen Background on the Eagle Mountain Pumped Storage Project Need for Eagle.
Load Management Strategies to Support Grid Integration of Intermittent Renewable Resources Paulina Jaramillo and Lester Lave.
Overview of the North American and Canadian Markets 2008 APEX Conference in Sydney, Australia October 13, 2008 Hung-po Chao Director, Market Strategy and.
1 Renewable Technology Working Group (RTWG) July 14, 2009 Henry Durrwachter.
ETAAC Energy Sector Energy Storage Smart Grid July 12, 2007 San Francisco, CA.
Variable Generation Subcommittee Michelle Mizumori WECC January 6, 2010.
OSC Meeting April 27, Transmission Cost Allocation Overview.
1 Mid-Continent Area Power Pool Wind Integration Studies Edward P. Weber August 16, 2007.
ISO Outlook Summer 2005 and Beyond Senate Energy, Utilities and Communications Committee February 22, 2005 Jim Detmers Vice President of Grid Operations.
K E M A T & D C O N S U L T I N G Power System Conference, Clemson, South Carolina, March 8-11, 2005 Principles and Issues Relating to the Interconnection.
Klondike Wind Power Project, Oregon Donald Furman Senior Vice President - Business Policy and Development December 3, 2009 Energy Bar Association Mid-Year.
Integrating More Renewable Energy in the Grid Bert Garvin Vice President, Regulatory Affairs July 21, 2008 NARUC Summer Meeting July 22, 2008.
NREL is a national laboratory of the U.S. Department of Energy Office of Energy Efficiency and Renewable Energy operated by the Alliance for Sustainable.
Demand Response: What It Is and Why It’s Important 2007 APPA National Conference San Antonio, Texas June 26, :00 a.m. to Noon Glenn M. Wilson Director.
IWWG Annual Conference Wind Management at MISO July 22, 2011.
Electric Reliability Council of Texas (ERCOT) A Success Story… In Progress Ingmar Sterzing United States Association of Energy Economics (USAEE) Pittsburgh.
The Role of Energy Storage as a Renewable Integration Solution under a 50% RPS Joint California Energy Commission and California Public Utilities Commission.
October 29, Organizational role of Short-Term Planning and Hydro Duty Scheduling Relationship to other groups in BPA Planning and analysis job.
STaR Symposium October 22, 2013 A Realistic View of Renewables Christine Risch.
Northwest Power and Conservation Council Overview of Draft Sixth Power Plan Council Meeting Whitefish, MT June 9-11, 2009.
John Norden, Manager, Renewable Resource Integration ISO New England Inc NASUCA Mid-Year Meeting June 30, 2009 Roadmap to Renewable Integration in.
FERC Staff’s Report on Demand Response and Advanced Metering.
Eastern Wind Integration and Transmission Study David Corbus - Project Manager Matt Schuerger (Consultant) National Wind Technology Center NREL Golden,
Southern California Edison The San Onofre Nuclear Generating Station April 14, 2011.
Monterey Plaza Hotel October 8-10, 2007
1. Non-Dispatchable Resources and EIS Market Carrie Simpson May 30,
Western Wind Integration Study May 23, Agenda 10:00am - Introductions 10:15 –Overview of study - NREL –Analysis to be conducted and examples of.
Updated 1/28/2011. Renewables Integration Plans and Challenges March 8, 2011 Jay Caspary ·
ERCOT Public 1 Project Panel 1 Dan Woodfin Director, System Operations August 15, 2014.
January 14, 2016 PacifiCorp-CAISO-NVE EIM Initiative Overview.
Lessons Learned from Existing RTOs John Moore January WCEA Meeting January 7 th, 2016.
New Incentives for Pursuing Demand Response Scott Strauss and Sean Flynn Spiegel & McDiarmid APPA Legal Seminar San Francisco – November 2004.
PacifiCorp and CAISO Expanding Regional Energy Partnerships
Long Term Transmission Integration Planning at the California ISO Intermittency Analysis Project (IAP) Energy Commission Staff Workshop February 13, 2007.
ISO Confidential Overview of California’s Current Drought and its Effects on the Energy System Dede Subakti, P. E. Director, Operations Engineering Services.
©2003 PJM 1 Presentation to: Maryland Public Service Commission May 16, 2003.
California Senate Energy, Utilities and Communications Committee Oversight Hearing May 10, 2016 Southern California Edison Colin Cushnie Vice President,
CPUC Resource Adequacy Program – LAO briefing May 25, 2009.
Wind Management at MISO
Asia-Pacific Energy Regulatory Forum
Grid Integration of Intermittent Resources
Operating a modern renewable-based grid
Proposed Energy Imbalance Market The Basics
Benefits of New England’s Proposed Capacity Market
PacifiCorp-CAISO-NVE EIM Initiative Overview
Byron Woertz, Manager—System Adequacy Planning
Byron Woertz, Manager—System Adequacy Planning
Forecasting and Operations CAISO Case
Presentation transcript:

EXETER A SSOCIATES, I NC. March 29, 2006February 17, New Transmission Initiatives for Renewable Energy and Some Thoughts on Wind Integration Kevin Porter NARUC Winter Meetings Staff Electricity Committee Washington, D.C.

EXETER A SSOCIATES, I NC. 2 Presentation Outline  Transmission Initiatives for Building Transmission in Advance of Generation  Basic thoughts on wind integration  Sources of additional information

EXETER A SSOCIATES, I NC. 3 Renewable Energy and Transmission  “Chicken and egg” problem can be quite severe with transmission and renewable energy  Renewable energy developers do not always have the financial capability to support large-scale transmission investments  Transmission is not built because it is not evident that renewable energy projects will be developed to use the transmission  Various initiatives underway  CA ISO Location Constrained Resource Interconnection  Competitive Renewable Energy Zones (Texas, Colorado)  Open Season (BPA)

EXETER A SSOCIATES, I NC. 4 CA ISO Location Constrained Resource Interconnection  Non-network facilities that would connect at least two eligible and unaffiliated generators in identified energy resource areas  Must go through the CAISO Transmission Planning Process and turned over to the CAISO’s operational control once in operation  Costs are rolled into the CAISO’s transmission access charge until generators come on-line, after which generators pay pro rata share of going forward costs  Demonstrated interest of 60% or more of transmission capacity, of which at least 25% is from interconnection agreements  Limited to 15% of total net high-voltage transmission plant investment of participating transmission owners in CAISO  Approved by FERC in December 2007

EXETER A SSOCIATES, I NC. Competitive Renewable Energy Zones  Identifies zones with high clean energy potential and transmission necessary to access it  In Texas and Colorado; description here largely based on Texas  Zones in Texas determined by availability of renewable energy resources, suitability of land and financial commitment of generators to construct renewable capacity. Zones nominated by utilities in Colorado, subject to action by the Colorado PUC.  Recovery of transmission costs  Spread across all LSEs in Texas  Via rate adjustment clause in Colorado (including planning and development costs and construction work in progress)  In Texas, developers must deposit letter of credit for 10% of their assigned share of the estimated costs identified in the transmission plan. No such requirement in Colorado 5

EXETER A SSOCIATES, I NC. BPA Open Season  BPA has several proposed projects in interconnection queue  BPA has proposed open season to determine zones or clusters to study for new transmission  All requestors of transmission service must participate in open season or forfeit their position in the BPA interconnection queue  One year’s worth of transmission charges in advance, unless customer pays for transmission upgrade costs in advance  Instead of participant funding, BPA proposes to estimate expected reliability, economic and “future use” benefits of new transmission and recover those in BPA general revenue requirements  Under discussion; may take place later this year 6

EXETER A SSOCIATES, I NC. Basic Issues to Contend With Concerning Wind Grid Integration  Grid operation requires balance between generation and load  Wind generation cannot be controlled and scheduled with a high degree of accuracy  Goal is to manage net system variability and net system uncertainty, not the variability or uncertainty of wind and solar

EXETER A SSOCIATES, I NC. Impact of Variable Power Sources  Power system is designed to handle tremendous variability in loads  Wind adds to that variability  System operator must balance loads=resources and meet reliability standards  It is not necessary or desirable to match wind’s movements on a one-to-one basis

EXETER A SSOCIATES, I NC. Wind Myths  For each wind power plant, a conventional generator must be kept standing by in case the wind does not blow  Wind requires storage  The wind only generates energy 25-35% of the time (it is really ~80%)  These myths have been refuted by  Extensive analysis  Operating practice of wind plants around the world

EXETER A SSOCIATES, I NC. Factors that Influence Wind Integration  Balancing area size  Generation Mix  Wind resource geographic diversity  Market-based or self-provided ancillary services  Size of interconnected electricity markets

EXETER A SSOCIATES, I NC. 11 Lessons Learned So Far  The costs for integrating wind is non-zero and increases as the proportion of wind generation to conventional generating resources or peak load increases.  Reserve costs attributed to wind integration are relatively small at wind penetration levels of less than 20%. These costs generally increase as the level of wind penetration increases.  How the variability and uncertainty of wind generation interacts with variations in load and load forecasting uncertainty has a large impact on the level of wind integration costs.  The level of geographic concentration of wind projects also affects wind integration costs. Greater spatial diversity of wind projects can lessen the fluctuations in wind output and therefore lessen wind integration costs

EXETER A SSOCIATES, I NC. Large-Scale Studies in Process  Western Wind & Solar Integration Study  30% Wind in footprint, 20% in WECC  Eastern Wind Integration Study

EXETER A SSOCIATES, I NC. Further Information  National Wind Coordinating Collaborative Bi-Monthly Transmission Update Calls  Open to all  Next one is March 11 th at 1 p.m. Eastern  ult.htm ult.htm  Contact me or Katie Kalinowski at  Table on RTO market rules and wind power   Table on New Transmission Proposals  nts/Expansion/Summary_ProactiveTransmissionPolicies_Jan2008. pdf nts/Expansion/Summary_ProactiveTransmissionPolicies_Jan2008. pdf  Wind Integration Studies 

EXETER A SSOCIATES, I NC. Further Information (2) IEEE Power Engineering Society Magazine, November/December 2005 Updated in 2007 IEEE Wind Power Coordinating Committee Wind Super-Session, Summer 2008 Utility Wind Integration Group (UWIG) Spring meetings in Dallas April

EXETER A SSOCIATES, I NC. March 29, 2006 Contact Information Kevin Porter Exeter Associates, Inc Sterrett Place Suite 310 Columbia, MD fax 15

EXETER A SSOCIATES, I NC. Appendix 16

EXETER A SSOCIATES, I NC. Accommodating Higher Levels of Wind and Solar Generation  Flexible, quick response generation with minimum turndown should be emphasized for future resource additions  Note that retirements may accelerate due to variable renewable generation  Market design that encourages and rewards maneuverable generation  Elimination of contractual obligations that thwart maneuverability  Inventory generation capability  Consolidate balancing areas, or mimic consolidation through sharing energy imbalances, area control area, etc.  Price-responsive load and demand response  Perhaps plug-in hybrids in the future

EXETER A SSOCIATES, I NC. 18 Accommodating Higher Levels of Wind and Solar Generation (2)  New transmission can enhance the grid’s ability to accommodate variable renewable energy generation  Making the most of existing transmission  Explore alternate line/path rating criteria (e.g., wind plants would rarely be at full output simultaneously due to spatial diversity)  Explore new technologies, including:  Real-time line ratings  Controls to manage output from multiple variable renewable resources

EXETER A SSOCIATES, I NC. 19 Accommodating Higher Levels of Wind and Solar Generation (3)  Curtailment – reduce or limit output of intermittent generation (wind) during periods of low load and high wind and high hydro  Forecasting – Encourage development and use of improved wind and solar forecasting methods  Day-ahead for unit commitment on grid-wide basis  Hour-ahead for real time operation  Monitoring – Record and archive operational data from existing new intermittent renewable generation (meteorological and MW)  Verify actual operational characteristics versus expectations  Refine operating practices, performance, and flexibility requirements  Data for future studies of grid operation and performance with increased intermittent renewable generation