Integration GlueX Detector Integration Mission: To ensure systems meet or exceed physics driven goals To ensure that detectors are designed in a sensible.

Slides:



Advertisements
Similar presentations
Beam-plug and shielding studies related to HCAL and M2 Robert Paluch, Burkhard Schmidt November 25,
Advertisements

CALICE Dave Bailey. Aims and Objectives Develop the technology to build a high- resolution tracking calorimeter for ILC experiments Main thrusts: –Testbeam.
MODULE TRANSPORT CLIC Module Working Group 27 September 2010 Keith Kershaw CERN EN-HE.
MICE: Hall Infrastructure Chris Nelson CEng CM15 8 th June 2006.
31/03/11FV 1 CEDAR from flammable gas safety point of view.
Mechanical Status of ECAL Marc Anduze – 30/10/06.
Global Design Effort Detector concept # Plenary introductory talk IRENG07 Name September 17, 2007.
1 G4MICE studies of PID transverse acceptance MICE video conference Rikard Sandström.
GlueX Simulations Status Report on CD3 geometry Richard Jones GlueX Collaboration Meeting, Newport News, January 10-12, 2008.
GlueX Collaboration Meeting, Newport News, October 25-27, 2007 GlueX Simulations Status Report Richard Jones GlueX Collaboration Meeting, Newport News,
MICE Collaboration Meeting March 29 - April 1, CERN MICE Integration Edgar Black/IIT March Room.
MICE Collaboration Meeting March 29 - April 1, CERN MICE alignment, tolerances and supports Tuesday March 30 Room Edgar Black/IIT March17-
1 Status of infrastructure MICE Video Conference, August 17, 2005 Yury Ivanyushenkov Applied Science Division, Engineering and Instrumentation Department.
UCN Phase 2 Design Status September 10, Design Components Bulk Shielding Target Crypt Cryogenic Insert Target Insert UCN Port Beam Window Cooling.
October 22, 2003H.J. Krebs1 LST Mechanical Design Review Mechanical Installation Preparation H. James Krebs October 21, 2003.
MICE - Detector Safety/Integration. MICE - Detector Safety/Integration – Detectors external to Magnetic Volume  Detectors external to magnetic volume.
We are Here! Gluex Collaboration Meeting May Engineering Status - Presented by Tim Whitlatch1.
Experimental Area Meeting V. Bobillier1 Good connection to earth (in many points) of every metallic parts to be installed in the cavern is very.
INFN-LNF / D. Orecchini – S. Tomassini – 06/24-25/2015 CLAS12 – RICH MECHANICS REVIEW SLIDE 1 RICH MODULE INTEGRATION IN CLAS_12 – LAST LAYOUT RICH MODULE.
Central Region Discussion Power and Cooling GDE Beijing-CFS.
Software Overview David Lawrence, JLab Oct. 26, 2007 David Lawrence, JLab Oct. 26, 2007.
Chiho Wang ATLAS TRT Duke University CERN, Feb TRT Barrel assembly status & schedule Feb. 9, 2005.
Thomas Jefferson National Accelerator Facility Page 1 CD Workshop Dec 2-3, 2009 CLAS12 Central Detector Overview and Integration David Kashy Hall B Lead.
Thomas Jefferson National Accelerator Facility Page 1 IPR October Independent Project Review of 12 GeV Upgrade Jefferson Lab October 18-20,
Robin Wines. Verbal agreement with BNL to acquire 48D48 magnet Contact at BNL indicates 4 of these magnets in storage BNL agrees to disassemble magnet.
Pixel Support Tube Requirements and Interfaces M.Olcese PST CDR: CERN Oct. 17th 2001.
Hall D Civil and Detector Progress Elliott Wolin 12-Sep-2002 U. Of Regina Middle of Nowhere Canada.
Ron Madaras, LBL U.S. Pixel Meeting, SCIPP, July 9-10, 2003 Patch Panel 1 (PP1) Brief Review Cost and Effort Estimate.
1 Belle II IR 2 Shuji Tanaka KEK Joint Belle II & superB Background meeting 2012//Feb/ 8-9th 1.
Magnetic Shielding Issues Roy Preece STFC - RAL. Overview Issues Items in harms way – Step IV Step IV mitigation plan –Racks –Compressors Current / Future.
Hcal Geometry and Assembly CLIC Meeting - LAPP December 2008, 15th.
1 Discussion for basic options — engineering video conference July 12, 2006 Outline Water pool — advantages — issues, problems, engineering options Aquarium.
1 CLAS12/Central Tracker review. Saclay 12/09 Stéphan AUNE Central Tracker review Micromegas central & forward tracker  R&D and prototypes  CAD implantation.
09/03/2010 ADO-PO section meeting Beam Pipe Extraction/Insertion R. Vuillermet.
Mechanical Status of EUDET Module Marc Anduze – 05/04/07.
INTEGRATION OF THE CBM SILICON TRACKING SYSTEM U. Frankenfeld for the CBM collaboration supported by BMBF, EU-FP7 HadronPhysics3 and CRISP.
Hall D Design Status GlueX Collaboration Meeting JLab, Ravi Anumagalla.
Hall D Design Status GlueX Collaboration Meeting JLab, December 11-13, 2003 Ravi Anumagalla.
SiD Conceptual Engineering Status Report Kurt Krempetz (Layer 5) (Layer 1) VXD.
Hall D Integration Status GlueX Collaboration Meeting Indiana University, Ravi Anumagalla.
Curtis A. Meyer 20 May, 2004 GlueX Detector Infrastructure The issue of infrastructure includes details of how we assemble the detector as a whole. How.
ATLAS 1 Beam Pipe Support Structure (BPSS) Services Interface and Assembly Final Design Review, April 2003 E. Anderssen, N. Hartman, A Smith, LBNL S. Coelli,
Alpine pixel layout Integration progress Teddy Todorov For the ATLAS-LAPP group AUW Integration meeting 20/11/2012.
1 Integration and Milestones Elton Smith Hall D Detector Review October 20-22, 2004.
Hall D infrastructure and integration Elton Smith Hall D Collaboration Meeting September 9-11, 2004.
Gen Magnet Design JLAB MENG Contributors: Supervisor: Butch Dillon-Townes Magnet Engineer: Robin Wines Mechanical Designer: Ron Lassiter Mechanical Engineer:
Robert Pak VTX Meeting Sept. 7, 2004 VTX. Robert Pak VTX Meeting Sept. 7, 2004 PHENIX Central Region From VTX Proposal (dims in mm) HBD is standalone.
Marc Anduze – CALICE Meeting – KOBE 10/05/07 Mechanical R&D for Technological EUDET ECAL Prototype.
SiD Hcal structure & 1m² Micromegas chamber prototype CALICE 2009 – LYON – 2009, septembre 17 th.
SiD MDI Issues Tom Markiewicz/SLAC Beijing ACFA/GDE Meeting 05 February 2007.
DON LYNCH NOVEMBER 6, AGENDA November 4, BABAR Magnet Update Global Design Concept – Update Outer HCal Structural Analysis (2 nd pass) sPHENIX.
SPHENIX MECHANICAL D. Lynch September 11, AGENDA Global Design Concept – Updated Global Assembly Concept – Updated Inner HCal Installation concept.
DON LYNCH OCTOBER 28, October 28, 2014 sPHENIX Detector Integration & Assembly Concept.
Budget Status and FY04 Requests Elton Smith Hall D Collaboration Meeting Dec 11-13, 2003.
IPN Lyon ILD Mechanical structure February 2015 Design, Integration & Services J.C Ianigro - IPN Lyon -
Present status of production target and Room design Takashi Hashimoto, IBS/RISP 2015, February.
Technical Design for the Mu3e Detector Dirk Wiedner on behalf of Mu3e February Dirk Wiedner PSI 2/15.
Hcal Geometry and Assembly Videoconference January 2008, 24th.
LHC Beampipes Ray Veness / AT-VAC FP XII 08Beam Vacuum- R.Veness.
SuperB Integration SuperB Experimental hall. Related topics of Slac D&D activities.
DCal-ALICE integration and installation plan and status A. Tauro.
SPHENIX Mechanical Don Lynch & Rich Ruggiero April 10, 2014.
STRAW TRACKER SYSTEM CAD STATUS :
Technical Design for the Mu3e Detector
Update of MVD services and requests
Hcal Geometry and Assembly
Update on He3 Services design since the ORNL meeting
Bill Wisniewski SuperB Frascati Meeting September 30, 2010
Integration and IR Hall
Inner DET. Integration Inner detector envelope Radial clearances.
Presentation transcript:

Integration GlueX Detector Integration Mission: To ensure systems meet or exceed physics driven goals To ensure that detectors are designed in a sensible way To ensure they fit together when assembled and function as intended Collaboration Meeting December 2003 Eric Scott

Prior conceptual goals Access to any detector package in one shift period Access to detector package without removing cables Signal cables as short as possible Fiber to control room –Limits ground loops

Considerations from BABAR Inter-system clearance of 20 mm –Possible exceptions: parts close to solenoid or mechanically fastened to neighbors… Good Neighbor Policy –“No system may pass its problems to its neighbor without the neighbor’s agreement.” –Such as: Thermal issues – heat put into the solenoid must be removed. Common Services –Insertion Fixtures –Air Conditioning, heating, ventilation ?

Survey Thoughts Design detector packages with known external reference points. Establish reference convention: –Center of target Z=0 for experiment? –Offset from inside or outside upstream iron A realistic “human” reference

Integration Packages Solenoid & Barrel Tracking Cerenkov TOF FCAL US PackageDS PackageFixed Package Package Access Area

Living with our Solenoid… “Fixed Package” Fill the central gaps –Barrel Calorimeter covers them anyway –Reduces fringe field What other steel modifications are desirable / necessary? –US end Fringe Field Suppression possibilities…

Standard solenoid Clipped 150 gauss Upstream end Solenoid face is at 0 Front gap is open 4 inches, all others are filled Closed Solenoid

Standard solenoid Clipped 150 gauss Upstream end Solenoid face is at 0 Both ends opened the same amount. All gaps are filled Standard Solenoid

Solenoid with Plate Standard with 20” X 80” diameter plate located 4” US with a 12” diameter beam hole. Clipped 150 gauss Upstream end Solenoid face is at 0 Both ends opened the same amount. All gaps are filled

Solenoid Plug Standard with 20” X 80” diameter Plug ~4” gap with a 12” diameter beam hole. Clipped at 150 gauss Upstream end Solenoid face is at 0 Both ends opened the same amount. All gaps are filled

Inside the Barrel “US Package” CDC –Part of US package? –Cables out US end Planar Drift Modules –Part of US package / independent? –Cables out US or DS end DS cable exit – impact on acceptance? US volume Tracking

Possible interference point for DS cable path driven by Cerenkov design and physics acceptance issues…

DS of Solenoid “DS Package” TOF & LGD –Package slides DS –Appliance concept Power & Cooling in Data out (Fiber?) Cerenkov –Could integrate with TOF & LGD package –Sets the elevation in the hall, should it still? Cerenkov TOF FCAL

Avoiding the millimeter war… Unified CAD database: JLAB – Unigraphics? Central repository Maintainer –One contact person –One location –Current source tree available to all Establish detector volumes for package groups Procedure for when conflict arises… Correlated with simulation geometry?

One stop Engineering support? Who provides the service? What are they providing –A check on safety critical points –Design assistance –Full design service When do we have to have this person / group in place?

Key near-term issues… Magnet iron / Fringe field reduction (Shielding) Experiment / Hall elevation (Cerenkov – other PID tech.) Rack locations: US front, side, access while beam is on… Cable / Optical space & paths –All out front / some out front for inner sled –If some come out the back, acceptance issues? Detector interconnects (supports): –Designs must be finished by:______ Power / Cooling needs and method –Inside magnet (CLEO’s PF-200IG based hydrocarbon coolant farm) –Outside AC, chilled water… Fire detection / Suppression –Inside magnet gas system? (FM 200 – heptafluoropropane?) –Outside dry pipe, power interrupt on alarm –Fire-wire, air sampling – sniffers…