Software Common Task Group Report Akiya Miyamoto KEK ALCPG09 30 September 2009.

Slides:



Advertisements
Similar presentations
CLIC-ILC collaborations on detectors F. Richard LAL/Orsay PAC Valencia May
Advertisements

R Frey SiD at SLAC 16Dec DBD Planning: ECal LOI section still a good starting point Guiding principles based on optimizing physics performance constrained.
Keynote Workshop Charge Akiya Miyamoto, KEK 16-April-2009 ILD Software Workshop.
Beyond the ALCPG David B. MacFarlane Associate Laboratory Director for PPA.
LCFI physics studies meeting, 28 th June 05 Sonja Hillertp. 1 Report from ILC simulation workshop, DESY June Aim of workshop: preparation for Snowmass;
Slides for Project Review 15 Dec ILD Future Colliders ILC, ILC-CLIC & Detectors ILD  VTX,LCTPC,CALICE.
RD’s Report (update since LCWS08 in Chicago) 2009/4/171TILC09 S.Yamada Sakue Yamada April Tsukuba.
RD’s Report on the status of physics/detector activities ILD Sakue Yamada May 23, 2012 Sakue Yamada.
Detector Benchmarking Norman Graf (SLAC) TILC08, ACFA Physics & Detector Workshop Tohoku University, Sendai, Japan March 4,2008.
Computing plans for the post DBD phase Akiya Miyamoto KEK ILD Session ECFA May 2013.
LCIO A persistency framework for LC detector simulation studies Frank Gaede, DESY, IT 4 th ECFA/DESY LC Workshop Amsterdam April 1 st -4 th 2003.
SiD Software Status. Framework Overview Pythia, WHIZARD, etc. Pythia, WHIZARD, etc. SLIC Tracking, PFA, etc. LCSim StdHep LCIO Events JAS3 (or any AIDA.
 k0k0 ++ -- -- p ILC Technical Design Report Physics and Detectors – Detailed Baseline Design Juan A. Fuster Verdú, IFIC-Valencia PAC Meeting, KEK.
E. Devetak - LCWS t-tbar analysis at SiD Erik Devetak Oxford University LCWS /11/2008 Flavour tagging for ttbar Hadronic ttbar events ID.
ALCPG Software Tools Jeremy McCormick, SLAC LCWS 2012, UT Arlington October 23, 2012.
ALCPG software: status and future plans LCWS UT Arlington October 23, 2012 Norman Graf (for the sim/reco group)
Report from Physics and Detectors Sakue Yamada Beijing March 26, 2010 The activity of the two detector groups IDAG monitoring Common Task groups.
Charge to the Workshop (and a report from WWS) Hitoshi Yamamoto July 11, 2005 ACFA8, Daegu, Korea.
F. Richard LAL/Orsay CLIC-ILC connections on Detectors PAC Paris meeting October 20, 2008.
RD’s Report Sakue Yamada Aug. 24, 2011 Institute Mumbai 2011/8/241Sakue ILCSC, Mumbai.
Taikan Suehara et al., TILC09 in Tsukuba, 2009/04/18 page 1 A summary of Sim/Rec/Opt session (including Benchmark joint session) Taikan Suehara ICEPP,
Lucie Linssen, CLICdp, (bi-)monthly meeting, July 21st CLICdp news CLICdp (bi-)monthly meeting July 21 st 2014.
Our mandate has been completed The physics and detector perspective of the ILC-TDR Sakue Yamada May 27, /05/271Sakue Yamada ECFA.
1 1 LCC Physics and Detector Hitoshi Yamamoto ECFA LC2013, DESY May 27, 2013.
ACFA Summary Akiya Miyamoto, KEK KILC12 26 April, 2012.
Status of ILC detector/physics activity Sakue Yamada Apr. 24, /4/241Sakue
Software tools for ILC Studies Akiya Miyamoto KEK CIAW07 November 5-7, IHEP, Beijing, China.
Plan of Jupiter data production Akiya Miyamoto 19 March 2008 ILD Optimization WG Updates of the presentation at ILD meeting, 7 March, at Sendai.
Sim/Recon DBD Editors Report Norman Graf (SLAC) Jan Strube (CERN) SiD Workshop SLAC, August 22, 2012.
RD’s Report on Detector Activity General Overview Project Advisory Sakue Yamada December 14, 2012 Sakue Yamada.
ILC DBD Common simulation and software tools Akiya Miyamoto KEK ILC PAC 14 December 2012 at KEK.
SiD performance for the DBD Jan Strube CERN. Overview Software Preparation (CERN, SLAC) Machine Environment (CERN, SLAC) Tracking Performance (C. Grefe)
Philip Burrows SiD meeting, Chicago 15/11/081 Progress on the LoI Philip Burrows John Adams Institute Oxford University Thanks to: Hiro Aihara, Mark Oreglia.
SiD Simulation & Reconstruction Norman Graf (for the sim/reco team) LCWS 2010, Beijing March 28, 2010.
Software Common Task Group Meeting Akiya Miyamoto 6-June-2011.
CLIC CDR in relation to SiD Lucie Linssen SiD discussion at IWLC CERN October 18 th LL, SiD meeting at IWLC, 18/10/2010.
Software tools and Computing Akiya Miyamoto KEK 29-September-2006 At FJPPL meeting.
WWSWWS Report of the World Wide Study J. Brau June 4, 2008 Dubna ILCSC Meeting.
Software Overview Akiya Miyamoto KEK JSPS Tokusui Workshop December-2012 Topics MC production Computing reousces GRID Future events Topics MC production.
Report from Software Workshop before TILC09 (16-April) Akiya Miyamoto, KEK 21-April-2009 ILD Meeting.
CLIC-ILC collaborations on detectors F. Richard LAL/Orsay PAC Eugene October
RAL, Apr H.Weerts SiD Workshop Summary, Next Steps & Life beyond the LOI H.Weerts Argonne National Lab.
Software Common Task Group Report Norman Graf (SLAC) PAC, Vancouver May 10, 2009.
Software Status for GLD Concepts Akiya Miyamoto 31-October-2007 ILD Optimization Meeting References: - Y.Sugimoto, “GLD and GLDc”, talk at ALCPG07, ILD.
Summary of Software and tracking activities Tokusui Workshop December 2015 Akiya Miyamoto KEK.
Software Common Task Group Report Akiya Miyamoto ILC PAC POSTECH 3 November 2009.
1 ILD Workshop purpose and scope Yasuhiro Sugimoto May 23,
1 Software tools in Asia Akiya Miyamoto KEK 18-March-2005 Simulation and Reconstruction Session LCWS2005 Representing acfa-sim-j activity M.C.Chang 1,K.Fujii.
Benchmarking Production Jan Strube (CERN) for the SiD Production team.
SiD LOI Benchmark Simulation and Reconstruction Norman Graf (SLAC) LCWA09, Albuquerque September 30, 2009.
RD’s Report Sakue Yamada May 23, /05/231 Sakue
Summary of MC requests for DBD benchmarks ILD Workshop, Kyushu University May 23,
1 Software tools for GLD Studies Akiya Miyamoto KEK 25 May, 2005 at IHEP Based on acfa-sim-j activity.
Report from SB2009 Working Group Akiya Miyamoto 8-July-2010 DESY ILD Software and Integration Workshop.
Global Design Effort Progress and Plans of the Beam Delivery Systems and Machine Detector Interface WG Daniel Schulte (CERN), Brett Parker (BNL), Andrei.
Tau polarization LoI Benchmarking Study Tim Barklow Ron Cassell Subhendu Chakrabarti Ray F. Cowan Cosmin Deaconu Rich Partridge SiD Collaboration Meeting.
RD’s Report SiD Group Sakue Yamada December 14, 2011 (remote participation) 2011/12/141SiD-meeting Sakue Yamada.
Lcsim software: status and future plans ECFA-LC DESY May 30, 2013 Norman Graf (for the sim/reco group)
Whizard2 test at KEK report of work in progress Akiya Miyamoto 27 October 2015 Contents: Comparison with DBD sample Recoil mass distribution of e + e -
Status of the ALCPG simulation & reconstruction Norman Graf (SLAC) TILC09, Tsukuba April 19, 2009.
Generator status Akiya Miyamoto KEK 23 February 2016.
Data Model: LCIO to LCIO2.0 Norman Graf (SLAC) ILC-CLIC Software, CERN May 28, 2009.
ILD MCProduction with ILCDirac
ILD Soft & Analysis meeting
Brief summary of discussion at LCWS2010 and draft short term plan
Computing in ILC Contents: ILC Project Software for ILC
Sakue Yamada March 19, 2011 RD’s Report Sakue Yamada March 19, /03/19 Sakue
ILD Optimisation: towards 2012 University of Cambridge
Sim/Rec/Opt Session Summary
Jupiter and Satellites
Presentation transcript:

Software Common Task Group Report Akiya Miyamoto KEK ALCPG09 30 September 2009

Charge and Members Charge –Coordinate tools and data bases common to LOI groups and code compatibility for simulation studies. –Work on any common software issues for ILC detector studies Members –Re-organization in progress after IDAG validation –Members: Akiya Miyamoto(Convener) Norman Graf(Deputy Convener) Frank Gaede (to be filled) 30 September 2009 Akiya Miyamoto ALCPG

Activities LOI era: –Contacts to make MC data samples for benchmark processes common to all LOI groups. After LOI submission –Meetings: 2 WebEx, 1 face-to-face (yesterday ), communications –Start to discuss plans until –Set up a web page for our activities –LC software workshop (May CERN 30 September 2009 Akiya Miyamoto ALCPG

30 September 2009 Akiya Miyamoto ALCPG

LC Software CERN Organization –by CLIC software community to discuss software issues common to ILC –27 participants from CLIC, ILD, SiD and 4 th Topics is selected CLIC community’s point of view –Persistency: StdHep/HepMC, LCIO –data model: LCIOV2 –Java  C++ interfacing –Geometry tools: Gear, GDML, TGeo, Visualization –Common PFA –SW-Packaging, Virtualization, common Framework 30 September 2009 Akiya Miyamoto ALCPG

CERN Workshop Conclusion High Priority: –evaluate ROOT I/O option for LCIO –PFA, modularized and common to LC community –LCIO data model extension: 1D/2D TrackerHits, multiple fit parameterization Medium high : –Common geometry system: Ideal to have a geometry system both for simulation and reconstruction shared by LC community Medium –HepMC: binary format should be defined 30 September 2009 Akiya Miyamoto ALCPG

Common tools for ILC Sharing of tools and cooperation in tool developments are crucial for our study. Example: Success of LCIO –Common data model and IO Sharing of reconstruction tools : PFA, Vertexing LDC + GLD  ILD –We would like to continue using LCIO 30 September 2009 Akiya Miyamoto ALCPG

Common Tools Topics at CERN LCSoft WS is not all. Ex. Vertexing, Tracking, Shower Simulation, Beam test tools 30 September 2009 Akiya Miyamoto ALCPG Discussions at this WS are good opportunity to exchange activities and identify possible area of cooperation. Soft CTG are pleased to work as liaisons of cooperation Discussions at this WS are good opportunity to exchange activities and identify possible area of cooperation. Soft CTG are pleased to work as liaisons of cooperation

From Sakue Yamada, ALCPG09 Work Plan until 2012 by RD

From Sakue Yamada, ALCPG09 Work Plan until 2012 by RD (cont.)

Common sample: Beam Backgrounds Samples for Strawman Design SB2009 –Common background samples should be prepared for detector studies. –500 GeV parameter is available Traveling focus simulation: CAIN not yet. Guniea-Pig OK. But beam energy spread: final word not available yet Parameters for another energy points (250 GeV ) not yet. –Hope that beam background samples are prepared soon after ALCPG09, for studies to give inputs to AD&I meeting in December. Samples for another energy points (1TeV, … ) will be after 30 September 2009 Akiya Miyamoto ALCPG

Common Data Samples Common data samples have been useful for LOI studies. –We thank SLAC colleagues for this work. –Common samples have been useful to understand differences in performance –Note that samples used by SiD and ILD were not completely exact. SiD used pre-mixed samples ILD used un-mixed samples  For the moment, no significant problem is recognized. –Current samples will be kept as they are in ftp server 30 September 2009 Akiya Miyamoto ALCPG

Common data samples - 2 Large production of samples will be done after –Determination of machine parameters –Physics Common Task group’s decision. –Generator updates on, such as inclusions of all top decay modes tau polarization in decay other than tau-pair process Whizard may not be optimal for Bhabha, gamma-gamma, SUSY with long cascade, … …  Co-work with Physics CTG necessary –Load sharing of the production of generator samples needs to be considered. 30 September 2009 Akiya Miyamoto ALCPG

Milestones (Draft) Soon after ALCPG09 : Background samples of ‘SB2009’ ready ( By Dec.2-3: Studies of SB2009 for feed back to GDE ) LCWS2010, Mar –list of benchmarks ready ( from Physics CTG ) –Machine parameter fixed ~ June 2010 –Updates of generator complete and start production of generator files. –Tools for generators should be ready by then By the end of 2010: –Generator files are available of simulations. Simulations for DBD –It will take ~ 1 year. –Expected to start by mid or early 2012 ( No solid plans yet ) –Common tools for Sim/Rec should be updated by then 30 September 2009 Akiya Miyamoto ALCPG

Summary Software Common Task group has been organized to work on –Common data samples –Common software tools and standards Sharing of samples and tools are encouraged and important for studies towards Detailed Baseline Design. 30 September 2009 Akiya Miyamoto ALCPG