Progress of SC RF Cavity during the 2006-2007 RF Group May 10, 2007.

Slides:



Advertisements
Similar presentations
Stochastic cooling and 56 MHz SRF update for Run-14 W. Fischer 21 January 2014.
Advertisements

Cavity tuning etc Cryogenics Cavity tuning Tuner Input couplers 6 th October 2009 video meeting K.Nakanishi.
MICE RF and Coupling Coil Module Outstanding Issues Steve Virostek Lawrence Berkeley National Laboratory MICE Collaboration Meeting October 26, 2004.
BEPCII RF POWER SYSTEM RF group, IHEP Sep ~ April 1.The 1 st transmitter had finished installing,commissioning and SAT (Site Acceptance Test).
Progress and Plan for Superconducting RF Cavity RF Group.
RF Measurement Plan Derun Li Center for Beam Physics Lawrence Berkeley National Laboratory January 20, 2011 MICE Video Conference Meeting.
Superconducting Cavities for Super- KEKB S. Mitsunobu.
Possible Assembly and Test of the Crab cryomodule in SM18 at CERN P. Maesen LHC Crab Cav meeting, 17 Sep’ 09 LHC-CC09Cryomodule Assembly & Test Stand.
Cavity-Coupler Treatment & Testing Preparation of crab cavities for KEKB RF aging of input couplers. 17 th September 2009, LHC-CC09 at CERN K.Nakanishi.
Progress of BEPCII Cryogenic System Project Group of BEPCII Cryogenic System Institute of High Energy Physics, CAS IMAC meeting, Apr Li Shaopeng.
SRF Results and Requirements Internal MLC Review Matthias Liepe1.
R&D Status and Plan on The Cryostat N. Ohuchi, K. Tsuchiya, A. Terashima, H. Hisamatsu, M. Masuzawa, T. Okamura, H. Hayano 1.STF-Cryostat Design 2.Construction.
Heat load study of cryomodule in STF
ESS cavities interfaces
Cavity status; recent KEK activities : Hayano (1) STF CM-1 cavities are; MHI-014: 3-rd VT:36MV/m (finished) MHI-015: 3-rd VT: > 18.4MV/m.
KEKB Crab Development K. Hosoyama (KEK) Crab Cavity for HER Crab Cavity for LER Crab Cavity for KEKB History of Crab Cavity R&D Characteristics of Crab.
Status of crab crossing studies Presented by NAKANISHI Kota (KEK) 2008/1/25.
Preliminary design of SPPC RF system Jianping DAI 2015/09/11 The CEPC-SppC Study Group Meeting, Sept. 11~12, IHEP.
IHEP 1.3 GHz Cryomodule and Cryogenics IHEP Cryogenic group 2nd Workshop of the IHEP 1.3 GHz SRF R&D Project Dec 2 nd, 2009.
Hydrogen system R&D. R&D programme – general points Hydrogen absorber system incorporates 2 novel aspects Hydrogen storage using a hydride bed Hydrogen.
XFEL SRF Accelerating Module Prototypes Tests at DESY Fermilab Seminar, July 21st Denis Kostin, MHF-SL, DESY.
STF EP, VT commissioning by FNAL AES001 H. Hayano, KEK
CRYOGENICS FOR MLC Cryogenic Piping in the Module Eric Smith External Review of MLC October 03, October 2012Cryogenics for MLC1.
Low-Level RF of BEPCII Sun YI IMAC’07 May. 11, 2007 IHEP.
4th BEPCII IMAC Meeting April , 2006 Status of BEPCII Storage Rings Ma Li April 26, 2006.
Experience with LEP (and LHC) cryo-modules Workshop on cryogenic and vacuum sectorisations of the SPL O.Brunner – November ’09.
1 HIGH ENERGY ACCELERATOR RESEARCH ORGANIZATION KEKB Review Committee/ NAKAI Hirotaka KEK Crab Cavity - Cryogenics - KEKB Crab Cavity Group - presented.
Test plan for SPL short cryomodule O. Brunner, W. Weingarten WW 1SPL cryo-module meeting 19 October 2010.
CRAB for HL-LHC KEK activity 2010DEC Yoshiyuki MORITA.
Nov. 28, 2003RF System Overview, K. Akai1 RF System Overview Contents: ◆ High beam current and measures ◆ Construction ◆ Damping ring RF system ◆ Crab.
The HiLumi LHC Design Study (a sub-system of HL-LHC) is co-funded by the European Commission within the Framework Programme 7 Capacities Specific Programme,
Detail plan of S1-Global H. Hayano (KEK),
Date 2007/Sept./12-14 EDR kick-off-meeting Global Design Effort 1 Cryomodule Interface definition N. Ohuchi.
SPL cryomodule specification meeting, CERN 19th October 2010 SPL cryomodule specification: Goals of the meeting SPL cryomodule specification: Goals of.
KEKB crab RF architecture & controls K.Nakanishi KEK Dec. 16, 2010 LHC-CC10 1.
Preparation procedure and RF processining of cERL-ML power coupler at KEK Hiroshi Sakai, Takaaki Furuya, Masato Sato, Kenji Shinoe, Kensei Umemori, Kazuhiro.
13 th ESLS RF Meeting – 1 st October 2008 DAMPY Cavity 1/20 80 kW at Dampy Francis Perez.
Experiences with KEK-B Crab Cavity KEKB and Crab Cavity History of Crab Cavity Construction and Operation of KEKB Crab Cavities What the KEKB Crab Cavity.
Reliability of SNS Superconducting Linac April 12, 2011 Jeff Saunders SNS/ORNL.
Ralf Eichhorn CLASSE, Cornell University. I will not talk about: Cavities (Nick and Sam did this) HOM absorbers (did that yesterday) Power couplers (see.
LHC Beampipes Ray Veness / AT-VAC FP XII 08Beam Vacuum- R.Veness.
201 MHz Cavity Plans Derun Li Center for Beam Physics Lawrence Berkeley National Laboratory February 11, 2011 MAP Friday Video Conference Meeting.
Shrikant_Pattalwar ICEC 26, March 7-11, 2016, Delhi 1 Horizontal Tests in a Vertical Cryostat Shrikant Pattalwar STFC Daresbury Laboratory UK.
2008/12/10 INFN R&D on Low Impedance Beam Chamber and Components Y. Suetsugu, for KEKB Vacuum Group Contents Introduction Beam Chamber Components Connection.
RF Commissioning D. Jacquet and M. Gruwé. November 8 th 2007D. Jacquet and M. Gruwé2 RF systems in a few words (I) A transverse dampers system ACCELERATING.
Status of Vertical Test Stand at RRCAT P Shrivastava, P Mohania,D.Baxy, Vikas Rajput S C Joshi, S Raghavendra,S K Suhane RRCAT, Indore November 26, 2012.
Superconducting Accelerating Cryo-Module Tests at DESY TESLA Technology Collaboration (TTC) Meeting, February 28 - March , Milano, Italy Denis Kostin,
Spoke section of the ESS linac: - the Spoke cryomodules - the cryogenic distribution system P. DUTHIL (CNRS-IN2P3 IPN Orsay / Division Accélérateurs) on.
RFQ coupler S. Kazakov 07/28/2015. Requirements: Coupler requirements Expected problems: Heating (loop, ceramic window, etc.) Multipactor Solutions: Appropriate.
Engineering of the power prototype of the ESRF HOM damped cavity* V. Serrière, J. Jacob, A. Triantafyllou, A.K. Bandyopadhyay, L. Goirand, B. Ogier * This.
Developments of new treatment techniques for SRF cavities at KEK HORIZONTAL HPR FOR PERFORMANCE RECOVERY Yoshiyuki MORITA Motivation of developing HHPR.
Shuichi NoguchiTTC Meeting at Milano, Injector Cryomodule for cERL at KEK Cavity 2 Prototypes were tested. Input Coupler 2 Couplers were tested.
France Japan Particle Physics laboratory (FJPPL) first workshop at KEK, Tsukuba, Japan 10 th May 2007 A_R&D_3 R&D on High Power Couplers for the ILC Hassen.
Operation Status of the RF Systems and Taiwan Photon Source
JPSP-CAS co-operation in Superconducting RF of BEPCII
Cryomdoule Test Stand.
S1G Experiment Schedule Plan
CERN – Zanon discussions
Cryomodule test stand at ESS site
WP5 Elliptical cavities
at STFC Daresbury laboratory
S1-G Webex meeting Global Design Effort
Replacement of coupler and recovery of cavity for BEPCII
Superconductivity in the BEPCII Performance
Operation experience of cryogenic system and cryomodules for the superconducting linear accelerator at IUAC, New Delhi. T S Datta ( On behalf of Cryogenics.
IHEP Cryomodule Status
Construction and First Coo-down Test of cERL Injector Cryomodule
RF Techniques and Developments at SSRF
IHEP ILC Cavity Status Jiyuan Zhai (IHEP)
eSPS Impedance Considerations Aaron Farricker Acknowledgements: T
Presentation transcript:

Progress of SC RF Cavity during the RF Group May 10, 2007

The 5th IMAC of the BEPCII May 10, 2007 Topics Final assembly of SC cavity module. Final assembly of SC cavity module. Module horizontal test and its performance. Module horizontal test and its performance. Tunnel installation and on-site alignment. Tunnel installation and on-site alignment. Machine commissioning Machine commissioning for SR mode. for SR mode. for Physics mode. for Physics mode. Puzzles of the vacuum I/L of the east module , and where is the solution? Puzzles of the vacuum I/L of the east module , and where is the solution? Spare SC cavity module and key components development Spare SC cavity module and key components development

The 5th IMAC of the BEPCII May 10, 2007 Final Module Assembling from March to May Mar. 23~30, the IHEP #2 SCC module was assembled in the clean room of building 6. Prof. Mitsunobu came to IHEP and instruct us to perform this work, MELCO sent one S.V, Mr. Arakawa, to witness the whole procedure and give us some suggestions in advance Mar. 23~30, the IHEP #2 SCC module was assembled in the clean room of building 6. Prof. Mitsunobu came to IHEP and instruct us to perform this work, MELCO sent one S.V, Mr. Arakawa, to witness the whole procedure and give us some suggestions in advance April. 26~May 3, the IHEP #1 SCC module was assembled. Prof. Furuya and Mitsunobu came to IHEP and instruct us, MELCO sent two S.V, Dr. Kijima and Mr. Okada, to witness this procedure April. 26~May 3, the IHEP #1 SCC module was assembled. Prof. Furuya and Mitsunobu came to IHEP and instruct us, MELCO sent two S.V, Dr. Kijima and Mr. Okada, to witness this procedure.

The 5th IMAC of the BEPCII May 10, Assemble the damper with the beam taper 3. Mount the damper on the cryostat 4. Mount the coupler on the cryostat 1. Cavities are ready for final assembly in building six 6. Some of participators 5. Pre-assemble doorknob on to the coupler port

The 5th IMAC of the BEPCII May 10, 2007 Log for Horizontal Test from May to August May~ June, the horizontal test for the IHEP #2 SC module May~ June, the horizontal test for the IHEP #2 SC module. Coupler aging at room temperature, instructed by Prof. Furuya. Coupler aging at room temperature, instructed by Prof. Furuya. To cool down SC module to 4.5K. To cool down SC module to 4.5K. Coupler aging at 4.5K. Coupler aging at 4.5K ~30, we carried out final performance test under the instruction of Prof. Furuya, two S.V, Ms. Kijima and Mr. Arakawa, came to IHEP to check our equipment and witness this procedure ~30, we carried out final performance test under the instruction of Prof. Furuya, two S.V, Ms. Kijima and Mr. Arakawa, came to IHEP to check our equipment and witness this procedure. During the conditioning period of the cavity, a B.D happen at 1.5MV, B.D detector miss to take an action , the pressure of LHe vessel increases up to more than 1.3bar, and the spring valve was opened automatically and a amount of cooled helium gas leaked from pipe of the spring valve. During the conditioning period of the cavity, a B.D happen at 1.5MV, B.D detector miss to take an action , the pressure of LHe vessel increases up to more than 1.3bar, and the spring valve was opened automatically and a amount of cooled helium gas leaked from pipe of the spring valve July~ August, the horizontal test for the IHEP #1 SC module July~ August, the horizontal test for the IHEP #1 SC module. Coupler aging at room temperature by us. Coupler aging at room temperature by us. To cool down SC module to 4.5K. To cool down SC module to 4.5K. Coupler aging at 4.5K. Coupler aging at 4.5K ~26, the final performance tested by us, one S.V, Mr. Okada, came to IHEP to check our equipment and witness this procedure ~26, the final performance tested by us, one S.V, Mr. Okada, came to IHEP to check our equipment and witness this procedure. During the cooling down period of the cavity, we forgot to close the by-pass valve of the cooling helium gas for the coupler, the flow rate of the helium gas is extremely high and a great lot of cooled helium gas pass through the return line, and some ice was frozen around the coupler port. During the cooling down period of the cavity, we forgot to close the by-pass valve of the cooling helium gas for the coupler, the flow rate of the helium gas is extremely high and a great lot of cooled helium gas pass through the return line, and some ice was frozen around the coupler port.

The 5th IMAC of the BEPCII May 10, 2007 Horizontal Test 1. Dummy tank test for cryogenic system commissioning 3. Clean up the ceramic windows of the coupler 4. Added a compensating spring to detune the frequency 5. Coupler frozen by a huge amount of cold helium gas 6. the coupling of coupler changes from under to over matching 2. Move the cavity module to horizontal test room

The 5th IMAC of the BEPCII May 10, 2007 Specification /ConditionIHEP-#1 (West module) IHEP-#2 (East module) Measurement Date 2006/06/302006/08/26 Frequency /[MHz] /[MHz] Frequency /Horizontal Temp. /[MHz] /[MHz] Frequency /[MHz] /[MHz] (high than target value) Frequency On-tuning /[MHz] Tuning sensitivity 139kHz /100kg 123kHz /100kg Spring constant 0.38mm /100kg 0.36mm /100kg Vc max [MV] 2.0 /MV Field limitation not limited Thermal B.D Q 0.5E E E+09 Qext (Coupler port) 1.9E E E+05 Static loss [W] 35 ?

The 5th IMAC of the BEPCII May 10, 2007 Horizontal test performance of the IHEP-#1 SCC

The 5th IMAC of the BEPCII May 10, 2007 Horizontal test performance of the IHEP-#2 SCC

The 5th IMAC of the BEPCII May 10, 2007 Shrinking length of the beam pipe during cooling down of the cavity module 1. SBP of IHEP #1 SC cavity 2. LBP of IHEP #1 SC cavity 3. SBP of IHEP #2 SC cavity 4. LBP of IHEP #1 SC cavity

The 5th IMAC of the BEPCII May 10, 2007 Tunnel installation from August to Nov Cryogenic group run the dummy load at the site of the tunnel, to test the LHe and LN2 transfer line and cryogenic system. Cryogenic group run the dummy load at the site of the tunnel, to test the LHe and LN2 transfer line and cryogenic system. Measure the itself alignment data of the SC cavity module at off-line. Measure the itself alignment data of the SC cavity module at off-line. Move Cavity module to the beam line. Move Cavity module to the beam line. Adjust and align the cavity on to the beam line Adjust and align the cavity on to the beam line Connect cavity with the neighboring beam chamber by RF-shielded bellow in a local clean booth. Connect cavity with the neighboring beam chamber by RF-shielded bellow in a local clean booth. Prepare and connect cooling water system for HOM damper and high power coupler. Prepare and connect cooling water system for HOM damper and high power coupler. Prepare and mount temperature sensor, pressure sensor and flow meter for each SC module. Prepare and mount temperature sensor, pressure sensor and flow meter for each SC module.

The 5th IMAC of the BEPCII May 10, 2007 Tunnel installation Alignment Data for East & West SCC Module 1. Transverse direction (X_Y-axes) SCC No. SBP Gate Valve PositionLBP Gate Valve Position X Horizontal Y Vertical X Horizontal Y Vertical East SCC West SCC Longitudinal direction (Z-axes) SCC No. SBP beam pipe /mm Cryostat /mm LBP beam pipe /mm Total length /mm Length error /mm Design East SCC West SCC

The 5th IMAC of the BEPCII May 10, West SC module in positron beam line 5. Chiller for the coupler 3. A local clean booth used for cavity tunnel installation 2. East SC module in electron beam line 4. Monitors array of temperature, pressure and flow meter for cavity 6. Cavity vacuum gauge controller

The 5th IMAC of the BEPCII May 10, 2007 Machine Commissioning During beginning commissioning, RF trip happen frequently during several days, the signal is recorded by a scope as right. Final we found that it is due to the instability of amplitude feedback loop, the loop damping is not sufficient, by adjusting the loop damping knob, we settle down this problem. During beginning commissioning, RF trip happen frequently during several days, the signal is recorded by a scope as right. Final we found that it is due to the instability of amplitude feedback loop, the loop damping is not sufficient, by adjusting the loop damping knob, we settle down this problem. Accelerating Voltage Reflected Power Incident Power Beam Current Density Once time, the east cavity vacuum goes bad, even applying a low cavity voltage, vacuum I/L happens frequently, we decide to aging the cavity to degas the cell surface. Final a breakdown occurs, by a mass analyzer, we found a great of hydrogen released, and cavity recovered from this breakdown. Once time, the east cavity vacuum goes bad, even applying a low cavity voltage, vacuum I/L happens frequently, we decide to aging the cavity to degas the cell surface. Final a breakdown occurs, by a mass analyzer, we found a great of hydrogen released, and cavity recovered from this breakdown.

The 5th IMAC of the BEPCII May 10, 2007 Commissioning cont ’... During a routine cavity conditioning on Jan , a breakdown occurred for east module, since the B.D detector miss to cut off RF power, the pressure of LHe vessel rises up, the electric safety valve was opened. After taking this action, but the electric valve didn ’ t close after a short time, the rotation shaft of the valve was frozen and couldn ’ t be closed by operator, we use a heater to warm up the frozen shaft, and close the electric valve. During a routine cavity conditioning on Jan , a breakdown occurred for east module, since the B.D detector miss to cut off RF power, the pressure of LHe vessel rises up, the electric safety valve was opened. After taking this action, but the electric valve didn ’ t close after a short time, the rotation shaft of the valve was frozen and couldn ’ t be closed by operator, we use a heater to warm up the frozen shaft, and close the electric valve.

The 5th IMAC of the BEPCII May 10, 2007 Difficulties Nov. 12~2007 Feb. 5, the BEPCII start to commissioning to clean up the vacuum chamber by beam, only the east cavity module used in SR commissioning Nov. 12~2007 Feb. 5, the BEPCII start to commissioning to clean up the vacuum chamber by beam, only the east cavity module used in SR commissioning. Nov. 18, 2006, first time the beam caught by RF bucket and accumulate in storage ring. Nov. 18, 2006, first time the beam caught by RF bucket and accumulate in storage ring. Dec. 13, 2006, the max beam current reach to 90mA at 2.5GeV in SR operation. Dec. 13, 2006, the max beam current reach to 90mA at 2.5GeV in SR operation. From Jan 22~26,2007, Prof. Furuya visited IHEP, the BEPCII accumulated beam current up to 178mA at 2.5GeV in SR mode on 23rd Jan., while a accelerating voltage of 1.3MV applied to accelerate the beam by the east accelerating module. From Jan 22~26,2007, Prof. Furuya visited IHEP, the BEPCII accumulated beam current up to 178mA at 2.5GeV in SR mode on 23rd Jan., while a accelerating voltage of 1.3MV applied to accelerate the beam by the east accelerating module.

The 5th IMAC of the BEPCII May 10, 2007 Difficulties cont ’... From 2007 Feb. 8 to now, the BEPCII start to commissioning in colliding mode. From 2007 Feb. 8 to now, the BEPCII start to commissioning in colliding mode. For positron storage ring (West SC module), the beam current increased smoothly, up to now, it can accumulated beam current of 150mA stably. For positron storage ring (West SC module), the beam current increased smoothly, up to now, it can accumulated beam current of 150mA stably. For electron storage ring (East SC module), the beam current increased slowly, the vacuum I/L occurred frequently. For electron storage ring (East SC module), the beam current increased slowly, the vacuum I/L occurred frequently. Since the condition of the vacuum of east module went bad gradually, we decided to warm up both SC cavity during the period of spring holiday, from Feb. 20 to 22, the cavities warmed up to max 88K and keep several hours to degas condensed gas. Since the condition of the vacuum of east module went bad gradually, we decided to warm up both SC cavity during the period of spring holiday, from Feb. 20 to 22, the cavities warmed up to max 88K and keep several hours to degas condensed gas. In order to find the reason that the vacuum went bad quickly during injection, on mar. 23, 2007, the BEPCII changed to S.R run mode temporary, the beam current of 100mA can be accumulated by the east module, while the west module is offset from resonant frequency, no vacuum I/L happen. In order to find the reason that the vacuum went bad quickly during injection, on mar. 23, 2007, the BEPCII changed to S.R run mode temporary, the beam current of 100mA can be accumulated by the east module, while the west module is offset from resonant frequency, no vacuum I/L happen.

The 5th IMAC of the BEPCII May 10, East SC module in positron beam line (injected beam 80~100mA) 2. West SC module in electron beam line (injected beam 50~150mA) We recorded the mass analyzer signal during injection and operation period of both module, the period is from 22nd to 23nd April, We recorded the mass analyzer signal during injection and operation period of both module, the period is from 22nd to 23nd April, 2007.

The 5th IMAC of the BEPCII May 10, Mass analyzer signal during warming up east SC module up to 100K 2. Mass analyzer signal during warming up west SC module up to 100K Again from 2007 April 24 to 26, we warmed up both cavity to 100K to release condensed gas on cavity surface, also mass analyzer signal were recorded. Again from 2007 April 24 to 26, we warmed up both cavity to 100K to release condensed gas on cavity surface, also mass analyzer signal were recorded.

The 5th IMAC of the BEPCII May 10, 2007 Budget for Spare Module ItemAmount /RMB Yuan Nb cell (material, fabrication and test device) 1 piece 3’122’000 Coupler (including aging bench) 1 piece 2’390’000 HOM damper 1 set (SBP & LBP HOM damper) 1’600’000 Vacuum components (Gate valve, ion pump and etc.) 1 set 1’291’000 Clean room (including assembly tools) 1 set 460’000 Cryostat (including sensor, valve and etc.) 1 set 3’150’000 Other components (Tuner, heater and etc.) 1 set 267’000 Spare budget 600’000 Total12’880’000 *** This project already got the permission of government, and it will be performed from 2007 to 2009.

The 5th IMAC of the BEPCII May 10, 2007 Acknowledgement During the past year, several time, Prof. Furuya, Mitsunobu and Akai visited IHEP to instruct us in module assembling, horizontal test and final success RF commissioning. Supervisors from MELCO help us check our equipments and tools, and deliver necessary technique document to us. and thanks Prof. Kurokawa for his concern on SC cavity. During the past year, several time, Prof. Furuya, Mitsunobu and Akai visited IHEP to instruct us in module assembling, horizontal test and final success RF commissioning. Supervisors from MELCO help us check our equipments and tools, and deliver necessary technique document to us. and thanks Prof. Kurokawa for his concern on SC cavity. Now the spare SC module already started up, we wish KEK can supported us as before, RF group of KEKB, SSRF and BEPCII should be collaborated very tightly in future SRF technology development, especially in the aspects of niobium cavity fabrication and test, high power coupler research and HOM damper construction. Now the spare SC module already started up, we wish KEK can supported us as before, RF group of KEKB, SSRF and BEPCII should be collaborated very tightly in future SRF technology development, especially in the aspects of niobium cavity fabrication and test, high power coupler research and HOM damper construction.