DATAGRID Testbed release 0 Organization and working model F.Etienne, A.Ghiselli CNRS/IN2P3 – Marseille, INFN-CNAF Bologna DATAGRID Conference, 7-9 March.

Slides:



Advertisements
Similar presentations
WP1 Grid Workload Management Massimo Sgaravatto INFN Padova
Advertisements

CERN STAR TAP June 2001 Status of the EU DataGrid Project Fabrizio Gagliardi CERN EU-DataGrid Project Leader June 2001
Tony Doyle GridPP2 Proposal, BT Meeting, Imperial, 23 July 2003.
LHCb Bologna Workshop Glenn Patrick1 Backbone Analysis Grid A Skeleton for LHCb? LHCb Grid Meeting Bologna, 14th June 2001 Glenn Patrick (RAL)
Andrew McNab - Manchester HEP - 22 April 2002 EU DataGrid Testbed EU DataGrid Software releases Testbed 1 Job Lifecycle Authorisation at your site More.
4 th DataGRID Project Conference, Paris, 5 March 2002 Testbed Software Test Plan I. Mandjavidze on behalf of L. Bobelin – CS SI; F.Etienne, E. Fede – CPPM;
DATAGRID Testbed 0 release Development Plan Draft proposal F.Etienne, A.Ghiselli CNRS/IN2P3 – Marseille, INFN-CNAF Bologna Physics Department, Milano 11.
CERN The European DataGrid Project Technical status Bob Jones (CERN) Deputy Project Leader.
CMS HLT production using Grid tools Flavia Donno (INFN Pisa) Claudio Grandi (INFN Bologna) Ivano Lippi (INFN Padova) Francesco Prelz (INFN Milano) Andrea.
1 Software & Grid Middleware for Tier 2 Centers Rob Gardner Indiana University DOE/NSF Review of U.S. ATLAS and CMS Computing Projects Brookhaven National.
Swedish participation in DataGrid and NorduGrid Paula Eerola SWEGRID meeting,
Workload Management Workpackage Massimo Sgaravatto INFN Padova.
27-29 September 2002CrossGrid Workshop LINZ1 USE CASES (Task 3.5 Test and Integration) Santiago González de la Hoz CrossGrid Workshop at Linz,
Task 3.5 Tests and Integration ( Wp3 kick-off meeting, Poznan, 29 th -30 th January 2002 Santiago González de la.
DataGrid Kimmo Soikkeli Ilkka Sormunen. What is DataGrid? DataGrid is a project that aims to enable access to geographically distributed computing power.
EC Review – 01/03/2002 – G. Zaquine – Quality Assurance – WP12 – CS-SI – n° 1 DataGrid Quality Assurance Gabriel Zaquine Quality Engineer - WP12 – CS-SI.
Integration of DataGrid Software for Testbed 1 Goal: combine the DataGrid middleware and the Globus core services. Phases: Preparation for Integration.
GRACE Project IST EGAAP meeting – Den Haag, 25/11/2004 Giuseppe Sisto – Telecom Italia Lab.
EGEE is a project funded by the European Union under contract IST JRA1 Testing Activity: Status and Plans Leanne Guy EGEE Middleware Testing.
Workload Management WP Status and next steps Massimo Sgaravatto INFN Padova.
Andrew McNab - Manchester HEP - 5 July 2001 WP6/Testbed Status Status by partner –CNRS, Czech R., INFN, NIKHEF, NorduGrid, LIP, Russia, UK Security Integration.
GRID The GRID distribution toolkit at INFN Flavia Donno (INFN Pisa) Andrea Sciaba` (INFN Pisa) Zhen Xie (INFN Pisa) presented by Massimo Sgaravatto (INFN.
DATAGRID ConferenceTestbed0 - resources in Italy Luciano Gaido 1 DATAGRID WP6 Testbed0 resources in Italy Amsterdam March,
Crossgrid kick-off meeting, Cracow, March 2002 Santiago González de la Hoz, IFIC1 Task 3.5 Test and Integration (
Yannick Patois – Datagrid Repository Presentation- 2001/11/21 - n° 1 Partner Logo DataGrid Software Repository presentation A short presentation of the.
SLICE Simulation for LHCb and Integrated Control Environment Gennady Kuznetsov & Glenn Patrick (RAL) Cosener’s House Workshop 23 rd May 2002.
CERN – Roberta Faggian Marque, Jan Fiete Grosse-Oetringhaus GRACE General Meeting, September 2004, Brussels 1 D6.1 Integration with the European DataGrid.
Grid Workload Management & Condor Massimo Sgaravatto INFN Padova.
DataGrid Applications Federico Carminati WP6 WorkShop December 11, 2000.
11 December 2000 Paolo Capiluppi - DataGrid Testbed Workshop CMS Applications Requirements DataGrid Testbed Workshop Milano, 11 December 2000 Paolo Capiluppi,
C. Loomis – Integration Status- October 31, n° 1 Integration Status October 31, 2001
Responsibilities of ROC and CIC in EGEE infrastructure A.Kryukov, SINP MSU, CIC Manager Yu.Lazin, IHEP, ROC Manager
LHCb planning for DataGRID testbed0 Eric van Herwijnen Thursday, 10 may 2001.
DataGrid Workshop Oxford, July 2-5 INFN Testbed status report Luciano Gaido 1 DataGrid Workshop INFN Testbed status report L. Gaido Oxford July,
28 March 2001F Harris LHCb Software Week1 Overview of GGF1 (Global Grid Forum) and Datagrid meeting, NIKHEF, Mar 5-9 F Harris(Oxford)
German Cancio/ WP4 -1 WP4 comments for the TestBed German Cancio / WP4
GridPP Presentation to AstroGrid 13 December 2001 Steve Lloyd Queen Mary University of London.
JRA Execution Plan 13 January JRA1 Execution Plan Frédéric Hemmer EGEE Middleware Manager EGEE is proposed as a project funded by the European.
CLRC and the European DataGrid Middleware Information and Monitoring Services The current information service is built on the hierarchical database OpenLDAP.
Preparation for Integration Organized access to the code WP6 infrastructure (MDS-2, RC, …) Input from WPs on requirements,... Acquire experience with Globus.
The European DataGrid Project Fabrizio Gagliardi EU DataGrid Project Leader CERN
DATAGRID Testbed Work Package (report) F.Etienne, A.Ghiselli CNRS/IN2P3 – Marseille, INFN-CNAF Bologna DATAGRID Conference, 7-9 March 2001 Amsterdam.
10 May 2001DataGrid WP6 Meeting, CERN1 GRID The GRID Installation Toolkit A brief report F. Donno INFN - Pisa.
DataGRID PTB, Geneve, 10 April 2002 Testbed Software Test Plan Status Laurent Bobelin on behalf of Test Group.
GRID Zhen Xie, INFN-Pisa, on DataGrid WP6 meeting1 Globus Installation Toolkit Zhen Xie On behalf of grid-release team INFN-Pisa.
Introduction to EELA Antonio Fuentes Tutorial Grid Madrid, May 2004.
DGC Paris WP2 Summary of Discussions and Plans Peter Z. Kunszt And the WP2 team.
EGEE-III-INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks EGEE-III All Activity Meeting Brussels,
29/1/2002A.Ghiselli, INFN-CNAF1 DataTAG / WP4 meeting Cern, 29 January 2002 Agenda  start at  Project introduction, Olivier Martin  WP4 introduction,
FP6−2004−Infrastructures−6-SSA EUChinaGrid status report Giuseppe Andronico INFN Sez. Di Catania CERN – March 3° 2006.
CERN, DataGrid PTB, April 10, 2002 CrossGrid – DataGrid Collaboration (Framework) Marian Bubak and Bob Jones.
EC Review – 01/03/2002 – WP9 – Earth Observation Applications – n° 1 WP9 Earth Observation Applications 1st Annual Review Report to the EU ESA, KNMI, IPSL,
EGEE is a project funded by the European Union under contract IST Roles & Responsibilities Ian Bird SA1 Manager Cork Meeting, April 2004.
GIIS Implementation and Requirements F. Semeria INFN European Datagrid Conference Amsterdam, 7 March 2001.
LHC Computing, SPC-FC-CC-C; H F Hoffmann1 CERN/2379/Rev: Proposal for building the LHC computing environment at CERN (Phase 1) Goals of Phase.
M. Cristina Vistoli EGEE SA1 Organization Meeting EGEE is proposed as a project funded by the European Union under contract IST Regional Operations.
Plans for D7.7 The Security Report on the Final Project Release Linda Cornwall, RAL.
10-May-01D.P.Kelsey, WP6 Security1 Certificates/Authorisation for DataGrid Testbeds David Kelsey CLRC/RAL, UK
11-May-01D.P.Kelsey, Security Update1 GRID Security Update David Kelsey CLRC/RAL, UK
CERN 1 DataGrid Architecture Group Bob Jones CERN.
Dave Newbold, University of Bristol14/8/2001 Testbed 1 What is it? First deployment of DataGrid middleware tools The place where we find out if it all.
Grid Deployment Technical Working Groups: Middleware selection AAA,security Resource scheduling Operations User Support GDB Grid Deployment Resource planning,
14 June 2001LHCb workshop at Bologna1 LHCb and Datagrid - Status and Planning F Harris(Oxford)
Bob Jones EGEE Technical Director
Workload Management Workpackage
Regional Operations Centres Core infrastructure Centres
EO Applications Parallel Session
Leigh Grundhoefer Indiana University
Report on GLUE activities 5th EU-DataGRID Conference
Gridifying the LHCb Monte Carlo production system
Presentation transcript:

DATAGRID Testbed release 0 Organization and working model F.Etienne, A.Ghiselli CNRS/IN2P3 – Marseille, INFN-CNAF Bologna DATAGRID Conference, 7-9 March 2001 Amsterdam

27-9 March 2001DATAgrid Conference - Amsterdam Content Testbed 0 release goals Working model Organisation Conclusion

37-9 March 2001DATAgrid Conference - Amsterdam Goals of Testbed 0 release Grid basic services deployment at european level, based on Globus toolkit; main coordination issues are: – Information services –Resource access:Certification, Security and policies management –Installation kit and documentation Network layout monitoring tools First Grid Middleware tests First Grid Applications tests

47-9 March 2001DATAgrid Conference - Amsterdam Working model Goal: Testbed has to provide the grid-layout for test activity of each WP and organize the software release validation process. Working model defines the validation process of each software package released by the DATAGRID Work Packages.

57-9 March 2001DATAgrid Conference - Amsterdam 1.WP test activity: Testbed WP will provide the basic layout for test activity of each DATAGRID WPs. 2. WP Release: a team of people from WPs, applications, testbed and network will organize the test environment for this release, do the tests, provide feedback to the WP and validate the release for the next test phase. 3.Testbed Release : the previous software release will be integrated to the last official testbed release. This new release will be tested in a larger environment in order to be validated for the next final testing phase. 4.Official Testbed Release:a new team including also users will organize a quasi-production environment in order to certificate this release as new official testbed release. Working Model

67-9 March 2001DATAgrid Conference - Amsterdam MIDDLEWARE AND APPLICATIONS Specific WP test activity WPx team I WP Release + appl. test Testbed + WPx + appl. Team II Testbed Release :integration into testbed release and test in larger environment Testbed + WPs and appl. Team III Official Testbed Release test in quasi-production environment + Users Team Official Testbed RELEASE NETWORKNETWORK TESTBEDTESTBED Development Version Production Version

77-9 March 2001DATAgrid Conference - Amsterdam Testbed organization Permanent Group, to coordinate and plan the test activity: –Partner representatives –Technical committee –Site contacts –Testbed support Release Teams: one team for each Release validation phase

87-9 March 2001DATAgrid Conference - Amsterdam Permanent Group –Partners representatives To coordinate testbed activity and evolution To define resource access policies in collaboration with the owner of the resources To approve test plans

97-9 March 2001DATAgrid Conference - Amsterdam Permanent Group cont. Technical Committee: to coordinate grid basic services and define test plans to be approved by the partners. –Requirements group (WPs Middleware, applications) To define the testbed requirements for WP tests (resources, services..) and for the validation of WP software releases –Information service group coordinator The IS group has to plan and support the IS service configuration for the Testbed. –Certification Authority coordinator To solve the multiple CA certificate issue for DATAgrid with the CA managers. –Security group coordinator To find the best mechanism to implement the access policies using the Globus Security Infrastructure To provide the architectural model for security to ATF –Network layout and services : oneWP7 representative – technical input from WP7 and WP6 requirements output to WP7

107-9 March 2001DATAgrid Conference - Amsterdam Permanent Group cont. –Site Contacts :(a coordinator per organization) To manage grid site-resources To implement the access policies To install software packages decided by the technical committee and by the release team To provide local support for the official releases

117-9 March 2001DATAgrid Conference - Amsterdam Permanent Group cont. –Testbed Support To organize and provide support and documentation on the official testbed software to site contacts (and in collaboration with them) and users. Need of direct channel with the Globus Team (testbed support & IS support)

127-9 March 2001DATAgrid Conference - Amsterdam Release Teams Temporary groups set up for each specific WP release to certificate the different release validation phases. For each release the membership has to be set up. Clarifications: –the software code is owned by the WPs. –Testbed WP organizes the ‘release certification’ and distribute the installation kit of the integrated WP releases also called “Testbed official release”.

137-9 March 2001DATAgrid Conference - Amsterdam Partners ZIB (Berlin) PPARC RAL CNRS IN2P3 7 sites CZECH Republic 2 sites CERNINFN 9 sites Spain 5 sites ESA- Esrin 4 sites LIP (Lisboa) Russia 4 sites WP6 Coordinator: Francois Etienne Deputy : Antonia Ghiselli S.Jarp A.Ghiselli L.Gaido D. Newbold A.Sansum R.J.Wilson G.Brugnoni F.Etienne A.Merzky F.Schintke J.Gomes M.Ruda H.Sverenyak Sweden Lund O.Smirnova B.A.Llyin

147-9 March 2001DATAgrid Conference - Amsterdam Sites map Dubna Moscow RAL Lund Lisboa Santander Madrid Valencia Barcelona Paris Berlin Lyon Grenoble Marseille Brno Prague Torino Milano BO-CNAF PD-LNL Pisa Roma Catania ESRIN CERN HEP sites ESA sites IPSL Estec KNMI

157-9 March 2001DATAgrid Conference - Amsterdam Testbed progressively growing from quantum to production Grid

167-9 March 2001DATAgrid Conference - Amsterdam Conclusions Actions of this meeting: –Testbed organization in place –Define CA/Security rules –Define a GIS topology and deployment coordination –Network monitoring tools proposal –Collect test requests from site contacts, and eventually from Middleware WPs and Applications –Testbed0 resource list –---  test plan