SNS Integrated Control System EPICS Collaboration Meeting SNS Machine Protection System SNS Timing System Coles Sibley 2000-0xxxx/vlb.

Slides:



Advertisements
Similar presentations
SNS Integrated Control System SNS RDB Requirements, wish list, status A little history l Oracle RDB used exclusively by accelerator physics group l JERI.
Advertisements

01/11/2002SNS Software Final Design Review1 V123S Event Link Encoder, Transmission System and PLL Receiver Thomas M. Kerner (BNL) SNS Global Controls.
ESS Timing System Plans and Requirements Timo Korhonen Chief Engineer, Integrated Control System Division May 19, 2014.
Dirk Zimoch, EPICS Collaboration Meeting, Vancouver 2009 Real-Time Data Transfer using the Timing System (Original slides and driver code by Babak Kalantari)
SNS Machine Protection System Final Design Review Introduction
A U.S. Department of Energy Office of Science Laboratory Operated by The University of Chicago Argonne National Laboratory Office of Science U.S. Department.
Stephanie Allison Integration with the SLC Control April 7, 2005 Introduction PNET Receiver VME Module SLC-Aware IOC Existing.
Patrick Krejcik LCLS April 16-17, 2007 Breakout Session: Controls Controls Commissioning Experience.
Paul Chu FRIB Controls Group Leader (Acting)
Stephanie Allison LCLS Integration with SLC October 12, 2004 Integration with SLC LCLS Facility Advisory Committee Oct 12, 2004 Introduction.
Dayle Kotturi LCLS Diagnostics and Commissioning Workshop September 23, 2004 LCLS Controls and Data Acquisition September 23, 2004.
SNS Integrated Control System SNS Machine Protection System EPICS Workshop April 27, 2005 Coles Sibley.
V4 – Executive Summary 1.Provide online add/delete of I/O to support continuous operation. 2.Provide redundant control of remote I/O to support improved.
Dayle Kotturi SLC April 29, 2004 Outline Motivation Key Components Status Update SLC / EPICS Timing Software Tasks Hardware.
Stanford Linear Accelerator Center Next Linear Collider Test Accelerator EPICS Support S. Allison, R. Chestnut, M. Clausen, K. Luchini.
NS Training Hardware. System Controller Module.
Diagnostics and Controls K. Gajewski ESS Spoke RF Source Accelerator Internal Review.
The TIMING System … …as used in the PS accelerators.
SNS Integrated Control System MPS - Commissioning Plans 1. Quick MPS System Overview 2. Run Permit System 3. Fast Protect Auto Reset 4. Fast Protect Latched.
ORNL-SNS Diagnostic Group SNS Beam Loss Monitors and HARPs Machine Protection System FDR September 11,2001 Presented by Saeed Assadi.
EPICS 2011 Spring Collaboration Meeting, Hsinchu, June 13-17, 2011 TPS Timing System & Plan of Machine Protection System TPS Timing System & Plan of Machine.
Synchronous Device Interface at NSLS-II Yuke Tian Control Group, NSLS-II, BNL (May 1, 2009 EPICS Collaboration Meeting, Vancouver)
NCSX NCSX Preliminary Design Review ‒ October 7-9, 2003 G. Oliaro 1 G. Oliaro - WBS 5 Central Instrumentation/Data Acquisition and Controls Princeton Plasma.
ITER – Interlocks Luis Fernandez December 2014 Central Interlock System CIS v0.
Wir schaffen Wissen – heute für morgen Babak Kalantari, PSI EPICS Meeting, Saclay Paul Scherrer Institut SwissFEL Timing System Babak Kalantari.
SNS Integrated Control System SNS Timing Master LA-UR Eric Bjorklund.
LCLS Timing Software and Plan 1 Controls Timing Workshop EPICS Collaboration Meeting SLAC LCLS Timing Software and Plan April Kukhee Kim.
NPDGamma: Data Acquisition System October 15th, 2010 NPDGamma Collaboration Meeting ORNL.
Stephen Schuh Vacuum Controls SCR and 16 November 2005 Vacuum Controls System Concept Review and Preliminary Design Review.
General Time Update David Thompson Epics Collaboration Meeting June 14, 2006.
Operational SNS Karen S. White Controls Group Leader 10/11/10.
SNS Integrated Control System Timing Clients at SNS DH Thompson Epics Spring 2003.
Issues in Accelerator Control Bob Dalesio, December 23, 2002.
EPICS Collaboration Meeting Fall PAL October 22 ~ 26, 2012 LCLS Timing System (pattern design, evGUI, and high level) Mike Zelazny for LCLS Timing.
Timing Requirements for Spallation Neutron Sources Timing system clock synchronized to the storage ring’s revolution frequency. –LANSCE: MHz.
Stephanie Allison LCLS Controls Software Meeting Dec 6, 2007 How To Set Up for the Event System on an IOC with an EVR(s) Assumes.
LANSCE Master Pattern Generator Eric Björklund LANSCE-8 Controls Software (LA-UR )
NCSX CD-4/MIE block diagrams April 18, 2007 P. Sichta rev 0.
Stephanie Allison SLC-Aware April 5, 2005 Introduction Description Issues Progress Plans for 2005 SLC-Aware IOC LCLS Collaboration,
Stephen Norum LCLS Oct. 12, LCLS Machine Protection System Outline Overview of interim MPS Update on the interim MPS.
Stanford Linear Accelerator Center Ron Chestnut EPICS Collaboration Mtg May 21-23, SLAC EPICS Projects Yesteryear, Today, and Tomorrow.
ESS Timing System Prototype 2012 Miha Reščič, ICS
Time Management.  Time management is concerned with OS facilities and services which measure real time.  These services include:  Keeping track of.
1 BROOKHAVEN SCIENCE ASSOCIATES Open-Source Distributed Deterministic Device Control Larry Doolittle Alex Ratti Bob Dalesio.
Debbie Rogind Diane Fairley SLC-Aware BSAC Facility Requirements Review May 26, 2005 SLC Aware IOC BSAC* Facility Requirements Review *Beam Synchronous.
EtherCAT based RF Interlock System for SwissFEL LLRF 2015 Abstract As part of the overall development effort for SwissFEL's RF and LLRF systems, the RF.
Page Beam Instrumentation mini- workshop Conclusions from the Hardware, Timing and MPS mini-workshop Lund, Miha Reščič Deputy Head of
Machine Protection Systems (MPS) Arden Warner, and Jim Steimel Project X Machine Advisory Committee March 18-19, 2013.
BIS main electronic modules - Oriented Linac4 - Stéphane Gabourin TE/MPE-EP Workshop on Beam Interlock Systems Jan 2015.
Design process of the Interlock Systems Patrice Nouvel - CERN / Institut National Polytechnique de Toulouse CLIC Workshop Accelerator / Parameters.
SNS Integrated Control System ORACLE –JERI DB Generation April 27, 2004 Coles Sibley Jeff Patton.
ESS Timing System Plans Timo Korhonen Chief Engineer, Integrated Control System Division Nov.27, 2014.
Reliability and Performance of the SNS Machine Protection System Doug Curry 2013.
LCLS Commissioning & Operations High Level Software
Data providers Volume & Type of Analysis Kickers
Presented by Li Gang Accelerator Control Group
SNS Status Report Karen S. White 10/15/08.
SLC-Aware IOC LCLS Collaboration Jan 26, 2005
Accelerator Reliability and Software
LCLS Timing Software and Plan
Timing and Event System S. Allison, M. Browne, B. Dalesio, J
CSNS Accelerator Control and Beam Instrumentation JIN Dapeng, XU Taoguang … June 9, 2015
LCLS Commissioning & Operations High Level Software
SNS Timing System EPICS Workshop April 28, 2005 Coles Sibley
LCLS Event System - Software
Interlocking of CNGS (and other high intensity beams) at the SPS
Next Linear Collider Test Accelerator and EPICS
Operation of Target Safety System (TSS)
LCLS Machine Protection System
ASYN based S7 PLC Driver Jignesh Patel
Presentation transcript:

SNS Integrated Control System EPICS Collaboration Meeting SNS Machine Protection System SNS Timing System Coles Sibley xxxx/vlb

SNS Integrated Control System MPS Design Assumptions l Machine Protection System is not a “Safety Class” or “Safety Significant” System. l SNS will be built and commissioned in Phases, MPS must accommodate this schedule. l Reliability – The Machine Protection System must inhibit the beam when required. It must fail in a SAFE state. l Availability – The machine availability should be as high as possible. The MPS must be easy to configure and have a “friendly” operator interface. False trips must be minimized.

SNS Integrated Control System MPS - Layered Protection

SNS Integrated Control System Machine Protection System l Run Permit System (1 second) »Coordinates machine mode changes. »Scans IOC configurations for Software Configuration errors. »EPS interface for masking equipment inputs. l Hard Wired Protect (~ 33 msec) »Latched in Hardware »Redundancy through FPLS inputs l Fast Protect Latched System (< 20 microseconds) »Latches fault conditions until fault clears and Operator resets condition. FPS_PERMIT_LINK_A carrier interrupted and inhibits beam through front end devices. l Fast Protect Auto Reset (20 microseconds) »Inhibits beam for duration of macro pulse by disabling FPS_PERMIT_LINK_B carrier to the front end. Restores Fast Protect link for next pulse if fault restored to normal.

SNS Integrated Control System Machine Protection System Layout

SNS Integrated Control System Fast Protect – Auto Reset l ALARA – Pulse Width Modulation l Concentrates Permit Inputs l Inhibits carrier link to disable Beam l Inputs: »Loss Monitors –Software trip points, bypass »Beam position monitors –Software trip points, bypass »RF Low level Controls

SNS Integrated Control System Fast Protect - Latched System l Concentrates Permit Inputs l Inhibits carrier link to disable beam l Devices bypassed by Key or PLC l Inputs disabled by machine mode (event link) l Equipment maintained in locked racks l Documentation control of changes l System verification after changes

SNS Integrated Control System Fast Protect Inputs

SNS Integrated Control System MPS Input Bypass Mechanisms l Mode Mask »Global database contains operating mode dependant devices. Devices not required for present mode are masked through hardware. Masks changed with database reconfiguration and IOC reboot. l Jumper / Key / PLC Bypass »Software bypass requires set of closed contacts from a jumper, key, or PLC contacts. l Software Bypass »If hardware configuration allows, input bypassed through software with appropriate EPICS Access Security permissions.

SNS Integrated Control System MPS Input channels

SNS Integrated Control System MPS Configuration Data

SNS Integrated Control System MPS PMC Module (Also nice generic digital IO module)

SNS Integrated Control System MPS System Hardware

SNS Integrated Control System MPS Software l Database (Oracle) »Access Security Files »EPICS database »RPS configuration database »Alarms, IOC startup scripts, Archives l Run Permit System »SNL programs »Machine mode changes »System Verification l Beam current (Loss) accounting system l Operator Interface - EDM l Device / Driver support routines.

SNS Integrated Control System EPICS CA Security

SNS Integrated Control System SNS Timing System l Modified Brookhaven Design l Timing Master (60 Hz PLL) - LANL l RTDL Master – BNL l Event Link Master – BNL l Utility Module – LANL l Timing Slaves (V124-S) - BNL l Machine Protection – SNS l Diagnostics EL-RTDL receivers - LBNL

SNS Integrated Control System Timing System Components

SNS Integrated Control System Neutron Selection, Timing

SNS Integrated Control System Timing Master l Provides 60 / 120 Hz system pulses l Follows line to within +/- 500 usec l Extraction time fixed ~5 msec in advance l Neutron Choppers follow Timing Master (60 Hz system pulses) l Accelerator timing follows Timing Master

SNS Integrated Control System SNS Timing Links (Drivers in progress at BNL) l Event Link (16 x Ring RF frequency) »Phase locked to Ring RF »256 Events or triggers, 64 hardware – 192 software »Events Prioritized (High priority, no jitter) l RTDL – Real Time Data Link (10 MHz Carrier) »Design based on RHIC RTDL System »Up to 256 Frames (1 start bit, 8 address bits, 24 data bits, 8 CRC bits per frame) »Provides Synchronous data facility wide. »One broadcast per machine cycle

SNS Integrated Control System SNS Timing Encoder 1x 8 fan out F/o Tx F/o Tx To Front End For local use Multimode fiber F/o Tx To HEBT To MCR DELAY MODULE To Ring SNS Timing Distribution

SNS Integrated Control System Event Link l Event link – PLL 16 * Ring RF »LEBT Chopper – 4 * EL carrier to create mini and macro pulses »Event link distributes timing for accelerator, diagnostics, extraction and high resolution time stamps »Diagnostics – PLL 4 * EL carrier l Timing Slave (V124S module - BNL) »Gate Width – 16 bits, Carrier * 2 (~33.9 MHz) »Gate Delays –Revolution delay - 16 bit, Ring RF frequency –Sub revolution delay – 8 bit, 16 * RF –Line delay – delays from 12 to 139 nsec »Jitter < 5 nsec

SNS Integrated Control System Data Transmitted on RTDL l Time of day (IOC time stamps) l Event Link Period (psecs) to converts counts to real time l Operating Mode (beam area, beam power, pulse length limits) l 60 Hertz phase difference l Beam Parameters for LEBT Chopper l Previous pulse beam data l Data acquisition mode l Beam profile ID l IOC Reset Address (Beam aborted if CRC error detected)

SNS Integrated Control System Macro Pulse Shape

SNS Integrated Control System SNS Accelerator Timing Sequence

SNS Integrated Control System RPS – Beam Mode Parameters

SNS Integrated Control System System Sequencer – (pulse scheduling)

SNS Integrated Control System Application Interface

SNS Integrated Control System SNS Job Openings Accelerator Physicist (9292) Accelerator Systems Hardware Engineer (1050) Beam Diagnostics Engineer (1846) Chief Accelerator Operators (1552) Control Systems Software Engineer (3343) Engineering Assistant—LLRF (1630) Engineering Assistants—Power Supply (6334) Engineering Assistant—Pulsed Power Systems (7630) Engineering Assistants—Survey and Alignment (3891) Mechanical Engineer—Cryogenics (5061) Mechanical Engineering Team Leaders (9983) Pulsed-Power Engineer ((1379) RF Engineer—High Power (1052) RF Engineers—Low Level (1229) Senior Mechanical Designers (3172) Senior Power Supply Engineers (6310) Vacuum Engineers (4257)