Drive Beam and CTF 3 International Workshop on Linear Colliders 2010 October 22, 2010 Erik Adli, Department of Physics, University of Oslo and CERN Bernard.

Slides:



Advertisements
Similar presentations
CLIC Energy Stages D. Schulte1 D. Schulte for the CLIC team.
Advertisements

Frank Tecker - BE/OP for the CTF3 Team IWLC 2010, Frank Tecker Critical Review of CTF3 performance Introduction Beam phase Improved operation.
Measurements on phase stability at CTF3 Giulio Morpurgo / CERN IWLC 2010.
CARE07, 29 Oct Alexej Grudiev, New CLIC parameters. The new CLIC parameters Alexej Grudiev.
UPC participation in the development of BPMs for the TBL of the CTF3 Yuri Kubyshin WORKSHOP ON THE FUTURE LINEAR COLLIDER Gandía, December 3, 2005.
Drive Beam Phase Measurements and Feedback at CTF3 Giulio Morpurgo.
R. Corsini, CLIC Project Meeting - 24 th May 2013 CTF3 1 CTF3: Highlights of the 1 st run R. Corsini for the CTF3 Team 1.
Frank Tecker CTF3 Committee Last two months’ chronology Wed 23/03:first beam to end of TL1 Mon 28/03:beam to CR + factor 4 combination Thu 31/03:“near.
Alessandro Cappelletti for CTF3 collaboration 5 th May 2010 RESULTS OF BEAM BASED RF POWER PRODUCTION IN CTF3.
CTF3 commissioning status R. Corsini - CTF3 committee 17 th September 2009 Update on CTF3 Operations and schedule This time I will try to give a more complete.
CLIC Drive Beam Linac Rolf Wegner. Outline Introduction: CLIC Drive Beam Concept Drive Beam Modules (modulator, klystron, accelerating structure) Optimisation.
Test Facilities Sami Tantawi SLAC. Summary of SLAC Facilities NLCTA (3 RF stations, one Injector, one Radiation shielding) – Two 240ns pulse compressor,
Compensation of Transient Beam-Loading in CLIC Main Linac
From one module to a long string 6 th CLIC Advisory Committee February 3, 2011 Erik Adli, Department of Physics, University of Oslo, Norway.
Summary of AWG4: Beam Dynamics A. Latina (CERN), N. Solyak (FNAL) LCWS13 – Nov 11-15, 2013 – The University of Tokyo, Japan.
R&D proposals for EuCard 2 EuCard2, April 21Steffen Döbert, BE-RF  SRF basic research (W. Weingarten)  CTF3 and CTF3+, possible infra - structure for.
Drive beam magnets powering strategy Serge Pittet, Daniel Siemaszko CERN, Electronic Power Converter Group (TE-EPC) OUTLINE : Suggestion of.
RF Power production at CTF3 X-band structure collaboration meeting,SLAC 6 th July 2009 Steffen Döbert, BE-RF  30 GHz power production  12 GHz power production.
IWLC - 21st october 2010Califes CTF3 probe beam - Wilfrid Farabolini1 CTF3 Probe Beam Status 1.
TBL as a 12 GHz power source, overview and first results from commissioning IWLC 2010 workshopSteffen Döbert, BE-RF  Current status of TBL  Status of.
B EAM STEERING EXPERIENCE AT CTF3 Davide Gamba 14 June 2014 Americas Workshop on Linear Colliders Fermilab.
R. Corsini, CLIC Project Meeting October 24, 2012 CTF3 Experimental program for end 2012 R. Corsini for the CTF3 Team 1.
Overview and beam physics International Workshop on Linear Colliders 2010 October 20, 2010 Erik Adli, Department of Physics, University of Oslo and CERN.
Two-beam Test Stand Status and Results Roger Ruber & Igor Syratchev for the TBTS team.
The CLIC decelerator Instrumentation issues – a first look E. Adli, CERN AB/ABP / UiO October 17, 2007.
DEVELOPMENT OF A BEAM LOSS DETECTION SYSTEM FOR THE CLIC TEST FACILITY 3 T. Lefevre Beam loss monitors for the CLIC Test Facility 3 Preliminary study done.
CLIC Energy Stages Meeting D. Schulte1 D. Schulte for the CLIC team.
Summary of progress towards CLIC goals and next steps for structure testing 6 th X-band collaboration workshop, April 18 th- 20 th 2012 Steffen Döbert,
ParameterL-bandS-bandX-band Length (m) Aperture 2a (mm) Gradient (Unloaded/Loaded) (MV/m)17/1328/2250/40 Power/structure (MW) Beam.
CLIC Energy Stages D. Schulte1 D. Schulte for the CLIC team.
University of Oslo and CLIC Short overview for first “NorduCLIC” meeting Erik Adli and Steinar Stapnes, University of Oslo May 19, 2008.
1 R. Corsini – CLIC Project Meeting CTF3 Update CTF3 Update R. Corsini for the CTF3 Team 1.
CLIC-ACE, Frank Tecker CTF3 program completion and upgrade to CTF3+ Frank Tecker – CERN for the CTF3 team CTF3 program completion and upgrade.
P. Urschütz - CTF3 Collaboration Meeting 2007 CTF3 commissioning & operation in 2006 P. Urschütz for the CTF3 operations team  Commissioning of the Delay.
R. Corsini, CTF3 results in /2/2011 CLIC MEETING 1 CTF3 Experimental results in 2010 R. Corsini for the CTF3 Team.
Two-Beam Test Stand results 5th Collaboration Meeting on X-band Accelerator Structure Design and Test Program SLAC, Stanford, CA, USA Erik Adli, University.
Erik Adli CLIC Project Meeting, CERN, CH 1 Erik Adli Department of Physics, University of Oslo, Norway Input from: Steffen Doebert, Wilfried Farabolini,
Some Results and Analysis from CTF3 1HG2012-April-18 Some Results and Analysis from CTF3 W. Farabolini - A. Palaia.
Injector Options for CLIC Drive Beam Linac Avni Aksoy Ankara University.
1 CTF3 CLEX day July 2006 CLEX day 2006 Introduction G.Geschonke CERN.
S. Bettoni, R. Corsini, A. Vivoli (CERN) CLIC drive beam injector design.
Interface between TAC SR and SASE FEL Possibility for testing CLIC structure Avni AKSOY Ankara University.
Summary of XFEL uses for CALIFES Erik Adli (University of Oslo, Norway)
Oleksiy Kononenko CERN and JINR
TBL experimental program Status and Results  Introduction  Status  Experimental program for 2010 and beyond  Outlook ACE, Steffen Döbert.
Drive Beam Injector Drive Beam Accelerator X 2 Delay Loop X 5 Combiner Ring Two-beam Test Area 3.5 A  s 150 MeV 35 A ns 150 MeV 150 MV/m 30.
CLIC Re-baselining CSC, October Possible CLIC stages studied 2.
X-band Based FEL proposal
CLIC DB injector facility, photo-injector option studies LCWS, Granada, September 26 th -30 th,2011Steffen Döbert, BE-RF  CLIC DB injector  Thermionic.
High-efficiency L-band klystron development for the CLIC Drive Beam High-efficiency L-band klystron development for the CLIC Drive Beam CLIC workshop,
Status of CTF3 G.Geschonke 1CTF3/CLIC Collaboration Board
AWAKE Run 2 : 1) Interstage considerations 2) CALIFES as plasma technology test facility Erik Adli and Carl A. Lindstrøm University of Oslo, Norway AWAKE.
TBL experimental program, evolution to RF power testing in TBL ACE 2011, February 2-3Steffen Döbert, BE-RF  Current status of TBL  Experimental program.
CALIFES A proposed electron beam test facility at CERN
First Year of Operation at the Two-beam Test Stand
Steering algorithm experience at CTF3
CLEX* Status and Plans CTF3 complex CLEX
S. Bettoni for the CTF3 commissioning team CTF3 commissioning status
Status of the CLIC main beam injectors
TBL, Status, Plans, Experiments
CLIC Rebaselining at 380 GeV and Staging Considerations
Have a chance to operate your own beam at CERN
CTF3 Collaboration Technical Meeting January 2008
LCWS 2017 – 26th October C. Rossi
CLIC Drive Beam Stabilisation
Measurements, ideas, curiosities
Status of the CLIC Injector studies
ATF project meeting, Feb KEK, Junji Urakawa Contents :
Explanation of the Basic Principles and Goals
CLIC Feasibility Demonstration at CTF3
Presentation transcript:

Drive Beam and CTF 3 International Workshop on Linear Colliders 2010 October 22, 2010 Erik Adli, Department of Physics, University of Oslo and CERN Bernard Jeanneret, CERN Roger Rober, University of Uppsala for Working Group 6

Drive Beam and CTF 3 2 CLIC drive beam: rf source delivering very high power (135 MW x 1500 x 48) in very short rf pulses (240 ns). CTF3: test facility to demonstrate drive beam generation (acceleration, frequency multiplication), two-beam acceleration and deceleration. CLIC Drive Beam CTF 3 To reach a CDR for CLIC: * conceptual design for all parts of the drive beam * feasibility demonstration of unproven concepts and technologies Since last workshop, an impressive amount of work has gone into both design studies and CTF3 experimental studies.

Reminder 3 Decelerator: power source for main linacs. Requirements for 1% luminosity loss: E/E < 7 x Converted to drive beam requirements, for the relevant frequencies : D. Schulte, WG2,6,7,8, Wednesday 14:00 Important driver for the drive beam studies.

A. Cappelletti, WG6, Wednesday 10:30 Design: decelerator 4 42 km of beam line, BPMs, quads (tunable), PETS. Powered magnets with serial fault tolerant energy efficient powering scheme, and tunable permanent magnets presented, and up to spec. A. Cappelletti, WG6, Wednesday 10:30 E. Adli, WG6, Wednesday 09:00 A. Vorozhtsov, WG6, Wednesday 09:30 J. Clarke, WG6, Wednesday 11:40 D. Siemaszko, S. Pittet, WG6, Wednesday 09:50 Decelerator prototype: Test Beam Line, commissioning of beam line and instrumentation going well; however, only 1 of 16 PETS installed. 8 PETS, 25-30% deceleration expected mid R. Lillestøl, WG6, Wednesday 11:00 R. Lillestøl, WG6, Wednesday 11:00

Design: frequency multiplication Design for rings in an advanced stage. Still challenges to reach good momentum acceptance due to non-linear dispersion. Reminder: frequency multiplication system also used for: beam loading compensation, low-energy running operation and drive beam dispersion-free steering : Optimized Energy Spread along the Main Beam: adjusting switching for frequency multiplication P. Skowronski, WG6, Thursday 09:30 O. Kononenko, WG6, Wednesday, 11:20 B. Jeanneret, WG6, Thursday 09:00

Design: drive beam accelerator 1 GHz structure design with >97% rf to beam efficiency, based on proven CTF3 structures. Short-range wake well contained with FODO cells. Power production requirement gives tough phase-requirements, beam phase of 0.1 deg. Injector: first design in place. Challenge of satellite population after 0.5 GHz bunching must be addressed further (ideas exist). A. Aksoy, WG6, Thursday 09:30 S. Bettoni, WG6, Thursday 15:20 R.Wegner, WG4+6, Thursday 12:00 Alternative injector: photo- injector, where phase-coding is performed by the laser. Experimental studies (PHIN), has shown promising results for such a drive beam injector for CLIC. O. Mete, WG6, Thursday 15:00

CTF3: two-beam acceleration 7 Accelerating gradient of 55 MV/m reached in the Two-beam Test Stand (PETS with feedback). Impressive joint effort drive beam team, TBTS team, laser team. Still work to be done to fully characterize all the power flow in the system. However, we have every hope to reach CLIC target of 100 MV/m this year. A. Palaia, WG6, Thursday 14:00 W. Farabolini, WG6, Thursday 14:20 M. Csatiri, WG6, Thursday 14:40 Laser shared between probe beam (short pulse) and PHIN (long pulse). Probe beam (CALIFES) in very good state; almost all parameters up to spec.

CTF3: Instrumentation 8 Precise diagnostics are fundamental to benchmark CTF3 beam power production against predicted power (form factor; bunch length and bunch phases) and energy gain and loss (time resolved spectroscopy). An impressive amount of instrumentation in installed in CTF3 the last few years, allowing also for precise phase measurements. More beam time needed for calibration. BPMs: a total of 137 BPMs. Most have performed very well, however, we observe some problems with drive beam in CLEX; under investigation. In general a challenge for machine operation: instrumentation or electronics prototypes is used for machine commissioning. A. Dabrowski, WG6, Wednesday 16:10 L. Soby, WG6, Wednesday 16:50 Novel Coherent Diffraction Radiation experiment also installed in CTF3. Good progress (but yet for for operational use). K. Lekomtsev, WG6, Wednesday 17:20 CLEX BPM sum signals

CTF3: critical view 9 Sample TBL measurement (uncombined beam) Form factor fit from sample TBL measurement (combined beam) Note: CTF3 is not CLIC drive beam complex; CTF3 has rf pulse compression. Much of problems with getting flat pulses in the power structures believed. CTF3 experience: rf pulse-compression is Very Bad for pulse stability (pulse to pulse, and along the pulse). F. Tecker, WG6, Thursday 16:10 Rf pulse generated in PETS is still quite far from CLIC-type. Round-table WG6, Thursday 17:10 Reaching the desired beam current is not enough; it is the rf power produced that counts.

CTF3: progress and outlook 10 CTF3 performance and stability is continuously improving. Some highlights : Klystrons / PC : Beam current : Machine tuning for power production: Large effort from CTF3 operator core team to minimize phase-variations along beam, despite pulse compression. A. Dubrovskiy, WG6, Wednesday 17:50 G. Sterbini, WG6, Wednesday 17:30 CTF3 outlooks : R. Corsini, WG6, Thursday 16:40 CTF3 linac current stability is now better than the CLIC requirements. One line of though: combining CLEX and CTF2, making room for < 20 full CLIC-like modules; all structures can be powered with PETS + priming. CTF3: several interesting upgrade scenarios for the next phase.