Status of vacuum & interconnections of the CLIC main linac modules C. Garion TE/VSC TBMWG, 9 th November 2009.

Slides:



Advertisements
Similar presentations
CLIC two-beam module integration issues 4 th CLIC Advisory Committee (CLIC-ACE), May 26-28, 2009 CLIC two-beam module integration issues G. Riddone on.
Advertisements

MICE RF and Coupling Coil Module Outstanding Issues Steve Virostek Lawrence Berkeley National Laboratory MICE Collaboration Meeting October 26, 2004.
5th Collaboration Meeting on X-band Accelerator Structure Design and Test Program. May 2011 Review of waveguide components development for CLIC I. Syratchev,
RF aspects of module vacuum system Riccardo Zennaro CERN.
NEW DESIGN FOR RF FINGERS C. Garion 5 June, 2012TE-VSC1 Acknowledgements to A. Lacroix and H. Rambeau for materials and help.
Cell-Coupled Drift Tube Linac M. Pasini, CERN AB-RF LINAC4 Machine Advisory Committee 1 st meeting CERN January 29-30, 2008.
1 Presented at ColUSM by D. Ramos on behalf of the Cold Collimator Feasibility Study Working Group Longitudinal.
Vacuum, Surfaces & Coatings Group Technology Department Vacuum tests for CLIC module prototypes 6 November 2013 C. Garion2 Outline: Reminder: specification.
Aluminum bellows for experiments
Vacuum system in the main Linacs C. Garion CERN/TE/VSC CLIC09 workshop, October.
K. Alam, CLIC workshop, October 16-18, CLIC workshop, October 2007 Working group “ Two beam hardware and integration” Test module in the two.
CIEMAT CONTRIBUTION TO TBL PETS (January 2009) David Carrillo on behalf of the Accelerators Team.
Ans Pardons 30/11/2006CNGS Reflector Technical Review CNGS reflector: Status Work remains to be done… 30/10 Introduction Drain connection Event analysis.
LINAC 4 Project L4T/L4Z Design Status J.Humbert / B.Riffaud on behalf of EN-MME design team 1 st September 2011 LINAC4 – BEAM COORDINATION COMMITTEE B.Riffaud.
INTEGRATION OF RF STRUCTURES IN THE TWO-BEAM MODULE DESIGN G. Riddone, CERN, Geneva, Switzerland A. Samoshkin, D. Gudkov, JINR, Dubna, Russia Abstract.
CTC, Two-beam module program (WP CTC-004) CLIC Modules (boundary conditions, technical system design and integration) CDR modules Prototypes.
ELENA – Electron Cooler Vacuum design Benjamin Moles March 26 th 2015 on behalf of Electron Cooler team : Gerard Tranquille Jean Cenede Lars Soby Lars.
BDS 11 Vacuum System for BDS [Completeness of RDR] Y. Suetsugu J. Noonan and P. Michelato Design principle Basic design Cost estimation.
06-November-2013 Thermo-Mechanical Tests BE-RF-PM Review of the CLIC Two-Beam Module Program Thermo-Mechanical Tests L. Kortelainen, I. Kossyvakis, R.
1 Status of the CLIC two-beam module program A. Samochkine, G. Riddone Acknowledgements to the Module WG members 4 February 2014 CLIC Workshop 2014 (3-7.
Status of the activities on vacuum system C. Garion TBMWG, 20/06/2012.
41 st IUVSTA Workshop, Brdo pri Kranju, 21/06 – 24/06/2004 L. Schulz SLS Vacuum System Lothar Schulz Theo Bieri Nazareno Gaiffi Martin Steinacher.
1.3GHz Input Coupler for ILC
TCLDA Design status Collimation Upgrade Specification Meeting L. GENTINI.
Preliminary calculations for the vacuum system of ELENA R. Kersevan TE/VSC-IVM – 21/6/2012 The vacuum sectors, the position of vacuum pumps, flanges, and.
CLIC08 workshop CLIC module layout and main requirements G. Riddone, on behalf of the CMWG Home page of the TBM WG:
Workshop Chamonix XV27-January-2006 DivonneMassimiliano Ferro-Luzzi 1 State of LHCb for the Sector Test  Overview  Agreement  Status of –VELO –exit.
Study Plan of Clearing Electrode at KEKB Y. Suetsugu, H. Fukuma (KEK), M. Pivi, W. Lanfa (SLAC) 2007/12/191 ILC DR Mini Work Shop (KEK) Dec.
CLIC Workshop th -17 th October 2008 Thomas Zickler AT/MCS/MNC 1 CLIC Main Linac Quadrupoles Preliminary design of a quadrupole for the stabilization.
cern.ch 1 A. Samoshkin 28-Feb-2011 Progress on CDR module design.
UK Neutrino Factory Meeting Front End Test Stand (F.E.T.S.) Engineering Status by P. Savage 22nd April 2009.
cern.ch International Workshop on Linear Colliders 2010 CLIC TWO-BEAM MODULE DESIGN & INTEGRATION 21-Oct-2010 WG 8 «TECHNICAL SYSTEMS»
C. Garion Presentation Outline  Overview of the inner triplet interconnections  Q1/Q2, Q2/Q3 interconnections  General view  Working conditions  Compensation.
Main features of PETS tank J. Calero, D. Carrillo, J.L. Gutiérrez, E. Rodríguez, F. Toral CERN, 17/10/2007 (I will review the present status of the PETS.
SKEKB Mini Work SKEKB Vacuum System – Arc Section – Contents Y.Suetsugu KEKB Vacuum Group 1.Beam Chambers 2.Pumps: Pump, Pressure,
CLIC Stabilisation Day’08 18 th March 2008 Thomas Zickler AT/MCS/MNC/tz 1 CLIC Quadrupoles Th. Zickler CERN.
cern.ch CLIC MEETING (17-Dec-2010) CLIC TWO-BEAM MODULE LAYOUT (short introduction) BE / RF 1.
Outline Injection septum SMH42 Injection bumper Resources Conclusion LIU-ABT review 20/11/2015 Status PS injection septa2.
Vacuum, Surfaces & Coatings Group Technology Department 22 nd January 2015 C. Garion2 Beam Line Interconnection: snapshot of present design principles.
THIN FILMS FOR CLIC ELEMENTS Outline Motivation The role of MME-CCS DB and MB transfer lines Main beam Main beam quadrupoles Other issues conclusions CLIC.
Status of the activities on the vacuum system C. Garion TBMWG, 27/03/2013 Outline: ON/OFF mechanism: tribology study Pumping technology: MB quad VC Accelerating.
CLIC workshop ”Two beam hardware and integration” working group Module layout and main requirement G. Riddone, A. Samoshkin
Alignment system and impact on CLIC two-beam module design H. Mainaud-Durand, G. Riddone CTC meeting –
LARP LHC PHASE II COLL RC1 TESTS - S. Lundgren 30 Jan 2007 No 1 /13 LARP Phase II Secondary Collimator RC1 Collimator Development and Test Program Status.
LEB 14 X 11 C. Garion Aluminum bellows for LHC experiments C. Garion, TE/VSC.
LHC Beampipes Ray Veness / AT-VAC FP XII 08Beam Vacuum- R.Veness.
ColUSM #63 18 th September, 2015 D. Ramos, C. Mucher, L. Gentini, H. Prin, Q. Deliege, A. Bastard, J. Hrivnak.
Module layout and types Two-beam module review, September 2009 Module layout and types G. Riddone for the CMWG,
Status of the CLIC module R&D G. Riddone on behalf of the CLIC module WG (special contributions from A. Samoshkin, D. Gudkov, A. Solodko, N. Gazis)
325 MHz Superconducting Spoke Cavity Coupler status. T. Khabiboulline Power Coupler design for Superconducting Spoke cavities. Originally.
Two-beam module layout
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
LCWS11 WG4 Fully featured accelerating structure engineering design
CLIC Parameter Working Group Two Beam Module Design
CLIC module working group
Alignment methods developed for the validation of the thermal and mechanical behavior of the Two Beam Test Modules for the CLIC project Hélène MAINAUD.
Thermal-Structural Finite Element Analysis of CLIC module T0#2
Status of design and production of LEP connection cryostat
A. Vande Craen, C. Eymin, M. Moretti, D. Ramos CERN
Challenges of vacuum chambers with adjustable gap for SC undulators
Preliminary Y-chamber specifications – First draft
Cedric Garion, TE-VSC-DLM, WP12
List of changes and improvements for the next generation CLIC module
The 11T cryo-assembly: summary of design and integration aspects
Système à vide du CLIC: activités en cours
Challenges for FCC-ee MDI mechanical design
XFEL Collimation and Beam Switchyard Vacuum Issues
Cooling aspects for Nb3Sn Inner Triplet quadrupoles and D1
Accelerator R&D Results from the B-factory
Vacuum in LER and HER. First estimation for the pumping system requirements A.Variola for B.Mercier, C.Prevost, F.Letellier.
Presentation transcript:

Status of vacuum & interconnections of the CLIC main linac modules C. Garion TE/VSC TBMWG, 9 th November 2009

Outline Vacuum system for the modules  vacuum chambers  pumping system Interconnections  drive beam  main beam Summary & conclusions

Vacuum system of the module Vacuum chambers PETS Accelerating structures Vacuum chambers are mainly PETS or AS Spec: EDMS ,  P MB ~ 10nTorr  Ri MB P 3 mm (now baseline is 4 mm)  material: copper (or Cu coated) Spec: EDMS  Ri DB P 11.5 mm

Vacuum chambers of the drive beam Drift tubeQuadrupole For both cases, precision tubes in stainless steel can be used (  23 *1 in 316L). The length is ~270mm or ~580 mm for long drift tubes. Vacuum chamber will be copper coated. Quadrupole chambers can be centered with 2 “soft” rings (PEHMW). Pipe Pole Ring Tolerances on quad poles are needed to fix the design.

Vacuum chambers of the main beam quad Design:  Stainless steel vacuum chamber, squeezed in the magnet  NEG strips sited in 2 antechambers  Copper coated (thickness to be defined) NEG strip 8-10 mm 50 mm Stainless steel Ceramic support Spacer Tooling has been done for Quad radius of 4 mm  to be redone for final aperture (  10 mm)  Final cross section is needed to check integration of the vacuum chamber in the magnet  Supporting or insulation of NEG strips have to be improved  Spacer have to be improved Probably not needed for module prototypes

Pumping system Vacuum equipment (version sealed disk):  manifolds around the accelerating structures linked to a common tube  Tanks around the PETS linked to a common tube  MB and DB vacuum coupled via the common manifold and the waveguides  pumping system: mobile turbomolecular station + holding ion and cartridge pumps Ion pump 2 NEG cartridges pumps Tank 4 linked Manifolds/AS

Pumping system performances: static vacuum  P 100h ~8.7E-9 mbar (for a link tank/manifold with a radius of 30mm) Assumptions: q~10-10mbar.l/s/cm2 (after 100 hours of pumping) Pumping speed for 1 accelerating structure= 300 l/s 4 manifolds 30 mm*30 mm At that time, a minimum radius of 30 mm has to be reserved for the tank/manifold link Model based on thermal/vacuum analogy 140mm

Assumptions: –10 12 H 2 molecules released during a breakdown –Gas is at room temperature (conservative) Dynamic vacuum in the accelerating structures MC model Thermal model Monte Carlo model and thermal study are in good agreement

Dynamic vacuum in the accelerating structures  Not a “big” difference between 1 or 4 manifolds Depending on the species, the local pressure doesn’t exceed the range mbar after 20 ms.  Only 1 manifold could be needed (to be confirmed) Other issues: other dynamic effects (RF, beams) to be considered

Pumping system Still to be done: -Link between the loads and the tank -Compensation and connections between the tank and the main and drive beams (for the prototypes, maybe a bellows with 2 standard flanges)

Interconnections - Drive beam PETS/BPM QUAD/PETS QUAD/PETS IC (or QUAD/drift tube IC) Free space: 20mm Free space: 30mm

Drive beam – QUAD/PETS intramodule interconnections Vacuum enclosure delimited by a bellows and knife flanges Electrical continuity done by a copper based flexible element Installation position Working position Flange integrated at the PETS extremity (to have same “free” plane as MB for tunnel installation). Is it acceptable?

Drive beam – QUAD/PETS intramodule interconnections Stainless steel flange brazed on the PETS Spring washers Stainless steel bellows: ID:45 mm, OD: 58 mm, 5 convolutions, 0.1mm thick, Pitch: 4 mm Flexible “tube” Copper rings Gasket/flange assembly (with screws) Schematic artistic view of the flexible element Thin foil (0.1mm) in copper based material Is there any requirement for the electrical conductivity?

Drive beam interconnections Design of drive beam interconnections exists. To be confirmed: Space available in the magnet extremities (outer diameter of the bellows) Number of cycles needed for the design of the flexible element To be done: Detailed design of the flexible element (geometry and material) PETS/drift tube connection: permanent or dismountable connection? Optimisation of the flange and knife (not mandatory neither for the module prototypes nor for the CDR) QUAD/PETS intermodule interconnections: same interconnection as QUAD/PETS Intramodule but with longer flexible element and bellows (6 convolutions) PETS/BPM intermodule interconnections: same interconnection as QUAD/PETS intermodule but with different flange on PETS

QUAD/AS AS/BPM IC (or AS/AS IC) AS/AS Free space: 30mm20 mm 15mm Interconnections - Main beam

Main beam – QUAD/AS intra & intermodule interconnections intramodule intermodule Damping material What is the maximum transverse displacement expected (1mm)? Copper tube Stainless steel bellows: ID:25 mm, OD: 36.5 mm, 4 or 9 convolutions, 0.1mm thick, Pitch: 2.7 mm Updated from Riccardo’s inputs

Main beam – AS/AS intermodule interconnections Gap 9 mm Copper tube Damping material Stainless steel bellows: ID:146 mm, OD: 166 mm, 4 convolutions, 0.1mm thick, Pitch: 4 mm Screws?

Main beam – AS/AS intramodule interconnections Copper “flexible” element Requirement for the electrical conductivity? Case 1: only 1 longitudinal fixed point for all AS on the module AS Precision of the longitudinal assembly?

Main beam – AS/AS intramodule interconnections Copper “flexible” element Requirement for the electrical conductivity? Case 2: 1 longitudinal fixed point on each AS on the module AS A bellows is needed

Main beam interconnections Design exists for main beam interconnections. To be confirmed: Space available in the magnet extremities (outer diameter of the bellows) Maximum misalignment to be compensated. Fixed point for the accelerating structures To be done: Interconnection AS/BPM: critical because tight space and transition with the quad vacuum chamber. Optimisation of the flange and knife (not mandatory neither for the module prototypes nor for the CDR)

Optimization has been done Prototypes have been manufactured and are being tested (to be sent to SLAC) Interconnections – inter beam waveguide flanges

Conclusion Concepts for the vacuum system and the interconnections exist. Distributed pumping for main beam quad Common tank equipped with pumps linked to AS, PETS and drift tubes Sealed technology of the vacuum interconnections (with electrical continuity for the drive beam and a gap for the main beam) Few questions are pending. Mainly related to: Interfaces with surrounding elements: Quad, AS, PETS, BPM, … Specifications for the interconnections: stroke and misalignment, fatigue life, electrical conductivity, Main parameters for most of the components have been determined. Detailed design can start after the green light.