 SAP AG 2007, Title / Dr. Stefan Scheidl / 1 WP6: Integrated prototype development WP1: Project management WP2: Requirements specification and analysis.

Slides:



Advertisements
Similar presentations
MS-Access XP Lesson 3. Validation Rule Property 1.Validation rule defines limitations to the data in a filed. Field Name:Marks Type:Number Validation.
Advertisements

© NCSR, Paris, December 5-6, 2002 WP1: Plan for the remainder (1) Ontology Ontology  Enrich the lexicons for the 1 st domain based on partners remarks.
UGDIE PROJECT MEETING Athens September WP6 – Assessment and Evaluation  Evaluation Results  Deliverable D 13 (first release issued and delivered.
01/05/2015 | slide 1 Programme Value Chain Vision, Outcomes & Blueprint Design From o.uk/msp/2007/09/25/pro gramme-value-chain/
Online Hotel Reservation System
1 Financial Mathematics Clicker review session, Final.
Cycles of the Sky Chapter 3:. The Tidally Locked Orbit of the Moon The moon is rotating with the same period around its axis as it is orbiting Earth (tidally.
I.1 ii.2 iii.3 iv.4 1+1=. i.1 ii.2 iii.3 iv.4 1+1=
Phase Difference = Phase Difference = 0.05.
I.1 ii.2 iii.3 iv.4 1+1=. i.1 ii.2 iii.3 iv.4 1+1=
Soft. Eng. I, Spring 07Dr Driss Kettani1 CSC-3324: Chapter II The Software life cycle & Software engineering process models Reading: I. Sommerville, Edition.
PRIME Economics WP Sub-contractors Meeting Thursday 16th December, – In Den Rustwat.
Instructional Design Hany Alzahri. Instructional Design Instructional Design is a systematic process that is well designed in order to improve the education.
End User End User Product/ Service Product/ Service Commercial Prototype Commercial Prototype Technical Prototype Technical Prototype Applied Research.
Software Development *Life-Cycle Phases* Compiled by: Dharya Dharya Daisy Daisy
EIDA Project ( Proposal ) Research and Technical Background Emergency Intelligent Decision Assistant: Emergency Intelligent Decision Assistant: Toolkit.
KICK-OFF MEETING - Brindisi 21 July 2011 EcoPlasBrick Work Package 4 Environmental compatibility analysis The environmental compatibility analysis, based.
Page 1 Road map for e-business implementation in Extended Enterprise Project funded by the European Community under the ‘Competitive and Sustainable Growth’
LIFELONG LEARNING GRUNDTVIG MULTILATERAL PROJECT
Methodologies. Contents Waterfall Model Evolutionary Models Incremental Development.
User interface design and human computer interaction Xiangming Mu.
ELT 415 MATERIAL ASSESSMENT PART V 1. COURSE DESIGN FOR BUSINESS ENGLISH 1. Course objective: based on learners ’ language level, target learners, and.
8.1.4 Can it still be factored? Factoring Completely I can factor out a common factor.
1 Infra-SAN: Technical architecture buildup. 2 Technical architecture buildup Purpose : Service driven Formalise the test definition and realisation Technical.
Ryton Associates LtdGateshead UK - Slide N°1 Alan Rooks – Project Manager Annual Project Review Newcastle, 19th April 2004 Architectural Environments for.
Project overview objectives, work plan, milestones and deliverables Mark Stevenson, University of Sheffield Kate Fernie, MDR Partners PATHS Final Project.
IEEE MEDIA INDEPENDENT HANDOVER DCN: Title: Ambient Networks Update Date Submitted: January 17 th 2007 Presented.
CC20O7N Software Engineering 1 CC2007N Software Engineering 1 Part 1 Introduction to Software Engineering.
© Services GmbH Project work plan 2/20/ St. Petersburg, May 18, 2011 Dr. Andrey Girenko
Describe a layered S-DWH Technology Architecture Information Systems Architecture Business Architecture.
0 DOD/DT/CEDCV – October 2015 Milano meeting WP3 Activities Technical and Semantic Interoperability C2-Sense project Milano– 12 th to 14 th October 2015.
4.1 NOTES. x-Axis – The horizontal line on the coordinate plane where y=0. y-Axis – The vertical line on the coordinate plane where x=0.
© The InfoCitizen Consortium Project Presentation Agent based negotiation for inter- and intra-enterprise coordination employing a European Information.
REVIEW. A. All real numbers B. All real numbers, x ≠ -5 and x ≠ -2 C. All real numbers, x ≠ 2 D. All real numbers, x ≠ 5 and x ≠ 2.
ΟΡΓΑΝΩΣΗ ΚΑΙ ΔΙΟΙΚΗΣΗ ΕΠΙΧΕΙΡΗΣΕΩΝ 3 Ο ΜΑΘΗΜΑ. ΟΙ ΜΕΓΑΛΕΣ ΕΠΙΧΕΙΡΗΣΕΙΣ Η δημιουργία μεγάλων επιχειρήσεων είναι ένα από τα χαρακτηριστικά του 20 ου αιώνα.
Presentation Title.
Presentation Title.
Object-Oriented Analysis & Design
The Integrated Food Security Phase Classification in Sudan –Next Steps
The Perfect Marriage! Ephesians 5:21-33.
WP1 Video analysis and annotation WP5a Architecture and Interfaces
PI: Michael Richardson
Algebra 1 Notes Lesson 4-1: The Coordinate Plane
פחת ורווח הון סוגיות מיוחדות תהילה ששון עו"ד (רו"ח) ספטמבר 2015
Transformations.
Development of integrated project and financial management tools in conformity with the 2003 FPA The report “cycle” In collaboration with.
Nathalie BERNARD Marketing Director
Development of integrated project and financial management tools in conformity with the 2003 FPA The report “cycle” In collaboration with.
Gulf of Honduras Task Group 1 Process
Group 1 Group 1 Group 1 Group 1 word word word word word word word word word word word word word word word word word word word word word word word.
First and Second Quarter
ОПЕРАТИВНА ПРОГРАМА “ИНОВАЦИИ И КОНКУРЕНТОСПОСОБНОСТ“ „Подобряване на производствения капацитет в МСП“
EDLC(Embedded system Development Life Cycle ).
Project Phases ‘98 ‘00 ‘02 ‘04 ‘06 Preparatory Phase
Project Title Group member names
ХУД 34-р сургуулийн нийгмийн ухааны багш О. БАЯРЦЭЦЭГ
Relations and Functions
Relations, Domain and Range
Solving Equations 3x+7 –7 13 –7 =.
Lesson 1.4 Page 25 Ordered Pairs and Relations.
ESS.VIP Validation Item 5.1
Example Make x the subject of the formula
Presentation Title Your information.
Gulf of Honduras Task Group 1 Process
ESSnet #2 Implementing Services 13 December Luxembourg
ESSnet #2 Implementing Services 14 December Luxembourg
Presentation of Project Joint meeting of the ESS.VIP.BUS ICT Project
Evaluate the integral {image}
U A B II III I IV 94.
Presentation transcript:

 SAP AG 2007, Title / Dr. Stefan Scheidl / 1 WP6: Integrated prototype development WP1: Project management WP2: Requirements specification and analysis WP3: Service discovery and assembly WP4: Domain- independent designs for DODEs WP5: Domain- specific design WP7: Prototype validation WP8: Dissemination and exploitation RTD Activities Horizontal Activities U-SAY

 SAP AG 2007, Title / Dr. Stefan Scheidl / 2 Q1Q2Q3Q4Q5Q6Q7Q8Q9Q10Q11Q12 time (quarters) WP2: Requirement spec. and analysis WP7: Prototype validation WP6: Integrated prototype development WP3: Use of architectural (design) information WP4: Domain-independent designs WP5: Design of DODE requirements; generic methods, designs and developments project phases specific methods, designs, development: first cycle specific methods, designs, development: second cycle Formative Evaluation Summative Evaluation M6 ▼ M15 ▼ M21 ▼ M36 ▼ M32 ▼ M23 ▼

 SAP AG 2007, Title / Dr. Stefan Scheidl / 3 milestones Milestones (MS?) MS1: Requirements rough (M6) MS?: Empty shell prototype, methods rough (M12) MS?: First generation functional prototypes (M21) MS?: Formative evaluation, lessons learnt from first cycle, requirements refined (M23) MS?: Second generation functional prototypes (M32)

 SAP AG 2007, Title / Dr. Stefan Scheidl / Phase I: requirements, generic methods, design and development Phase II: specific methods, design and development (first cycle) Phase III: Formative evaluation Phase IV: specific methods, design and development (second cycle) Phase V: Summative evaluation Requirements Empty shell prototype First gen. functional prototype Refined requirements, lessons learnt Second gen. functional prototype Final validation Phases Time [months] Milestones