Safeguards Training Ankara, Turkey May 17, 2011 Simplified Checklist EMP for Small Scale Civil Works – Introduction and Exercise.

Slides:



Advertisements
Similar presentations
Recommendations of the Initial Environmental Assessment (IEE) According to the SIEE, the project is identified as a category of B under the ADB environmental.
Advertisements

How to Use the Bayanihang Eskwela Checklist G-Watch Ateneo School of Government joint government-citizen action for good governance.
The Student Handbook to T HE A PPRAISAL OF R EAL E STATE 1 Chapter 10 Improvement Analysis.
PARKVIEW APARTMENTS 20 Unit Rehabilitation & Site Work ISLA VISTA, CA. Joint Cities-County Affordable Housing Task Group October 23, 2008.
Training Workshop for Financial Intermediaries and Implementing Agencies Kiev, May 2011 Ruxandra Floroiu Senior Environmental Engineer, ECA Region, World.
World Bank Safeguard Training Ankara March 31, 2010.
Training Workshop for Financial Intermediaries and Implementing Agencies May 2011 Ruxandra Floroiu Senior Environmental Engineer, ECA Region, World Bank.
RELATIONSHIP between WB and NATIONAL REQUIREMENTS ENVIRONMENTAL ASSESSMENT Esra ARIKAN Environmental Specialist ECA Safeguard Training for PIUs, Ankara.
Ealing Estates Review EDAW and dba. Ealing Estates Review Prioritise 34 estates into ‘bands’ of regeneration need/potential Develop design interventions.
Writing a Preliminary Assessment (The example of the Environmental Review Report) [DATE][SPEAKERS NAMES]
USAID Africa Bureau EIA Procedures for Sub-Projects
Introduction to World Bank Safeguard Policies and Project Preparation
Project funded by The European Union Government of the Republic of Serbia European Integration Office INDUCTION TRAINING SEIO GENERAL FRAMEWORK CREATED.
ENVIRONMENTAL MANAGEMENT PLAN
Topic 6 Environmental Impact Assessments. EIA – Introduction The start Effectiveness?
THE PROJECT TEAM TYPICAL REQUIREMENTS AND RESPONSIBILITIES OF THE PROJECT TEAM TRADITIONAL TEAM ORGANIZATION AND VARIATIONS THE OWNER’S TEAM THE DESIGN.
Paul Mundy Concept notes A brief summary of your project idea.
Involuntary Resettlement 0P 4.12: Financial Intermediaries and Resettlement Planning Instruments.
Overview of Environmental and Social Safeguards Environmental Management Plan Checklist for Simple Civil Works Zagreb, May 6-8, 2009 Presenter: Natasa.
Disclosure and Public Consultation Transparency and Participation in the Application of Safeguard Policies Johnson Appavoo Operations Analyst WB Safeguards.
Disclosure and Public Consultation Transparency and Participation in the Application of Safeguard Policies.
Peter Defranceschi ICLEI - Local Governments for Sustainability An Introduction European Commission GPP Training Toolkit.
OP/BP 4.01 Environmental Assessment Zagreb, May Presenter: Natasa Vetma Presentation prepared by Ruxandra Floroiu.
CDBG 2015 Technical Compliance. Sections 4.4 – 4.7 Handbook & Application 4.4 – 4.6: Projects 4.7: Residential Rehab Programs.
Chapter 8: Problem Solving
EIA: A framework for ESDM. EIA: A Framework for ESDM. Visit Defining EIA Environmentally Impact Assessment is A formal process for.
Is NEPA Preventing Energy Development? Bryan Hannegan, Ph.D. Associate Director – Energy and Transportation White House Council on Environmental Quality.
King County Wastewater Treatment Division What you need to know about WTD’s Technical Standards.
Module 6: PINs M6. M6. PINs Contents: Project Identification Notes – how to structure them (including eligibility, baselines and additionality) Two projects.
Integrating Environmental Management Plans into Project Operational Manuals Agi Kiss Safeguards Training Workshop, Chisinau, Oct 28-31, 2008.
World Bank Safeguards Training Workshop
An Introduction to World Bank Organization and Operations Jean-Charles Crochet Senior Transport Economist World Bank.
Module 23 Environmental Safeguards Accreditation Training, January 21 – 25, 2013 Public Consultation.
The CDM Project Cycle. The first step -- submit a PIN (template on Description of Project Proponent Type of Project Location of.
The BioPreferred SM Federal Procurement Preference Program.
U N I T E D S T A T E S D E P A R T M E N T O F C O M M E R C E N A T I O N A L O C E A N I C A N D A T M O S P H E R I C A D M I N I S T R A T I O N State.
Safeguard Training Workshop Zagreb, Croatia May 7, 2009 Ruxandra Floroiu (Environmental Engineer)
Gulana Hajiyeva Environmental Specialist World Bank Moscow Safeguards Training, May 30 – June 1, 2012.
World Bank Safeguard Workshop Training
Case Study – Preparation of an EMP Integrated Ecosystem Management of Sunshine-Moon River Basin (SMRB) Project.
Mini-Case / Quiz Topic: EA Categorization and EMP Requirements By Victor B. Loksha ECA Safeguards Team Europe and Central Asia Region The World Bank Discussion.
Financial Intermediary Lending World Bank Safeguards Workshop May 2013.
Writing the IEE (EPTM Chapter 4). EA Training Course Tellus Institute 2 Writing the IEE IEE Review  Used when at least one screening outcome is “IEE.
Writing the IEE. EA Training Course 2 Writing the IEE IEE Preparation  Suggested steps in preparing an IEE are:  assembling relevant information resources.
Environmental Management Plan (EMP) Required for: Full EIA based on Palestinian EIA Policy Category A projects based on World Bank Policy.
Mitigation and Impact management
Resource consents and earthquake rebuilding works ViaStrada Ltd Jeremy Phillips.
1 UNEP/IETC EST Initiative Proposed Cooperation Framework 4 December 2003 Otsu, Japan.
Overview of Environmental and Social Safeguards Environmental Management Plan Checklist for Simple Civil Works Chisinau, October 28-31, 2008 Ruxandra Floroiu,
Property Inspection & Analysis: The Improvements
SR 256 Road Rehabilitation Town of Austin January 18, :00pm Austin Elementary School.
RISK MANAGEMENT IN PROJECT DELIVERY (CONSTRUCTION)
URBAN STREAM REHABILITATION. The URBEM Framework.
Gulana Hajiyeva WB Safeguards Training Workshop Almaty, December 2012.
Construction treatment in conducting international comparison of GDP.
Disclosure and Public Consultation Transparency and Participation in the Application of Safeguard Policies Presenter: Johnson Appavoo Presentation prepared.
Capacity Assessment of Implementers LFA PSM expert workshop January 2014.
Construction Foundations of Technology Construction © 2013 International Technology and Engineering Educators Association STEM  Center for Teaching and.
CLIL PROJECT Content and Language Integrated Learning THE ITALIAN CADASTRE CONTENT MAPS School Year 2015/2016 Class: 5 CAT DNL: Estimo Theacher: Prof.
Governor’s Office of Emergency Services 1 The Governor’s Office of Emergency Services Application and Benefit Cost Analysis (BCA) Training.
ISO Session 3 Environmental Management and Ethics in Management.
EIAScreening6(Gajaseni, 2007)1 II. Scoping. EIAScreening6(Gajaseni, 2007)2 Scoping Definition: is a process of interaction between the interested public,
Environmental Safeguards
EIA approval process, Management plan and Monitoring
GCF’s Environmental and Social Safeguards
Selected Project Covenants (1)
Involuntary Resettlement 0P 4.12: Planning Instruments
URBAN STREAM REHABILITATION
The Asset Management Journey for Building Assets
GPP Training Toolkit An Introduction European Commission
Presentation transcript:

Safeguards Training Ankara, Turkey May 17, 2011 Simplified Checklist EMP for Small Scale Civil Works – Introduction and Exercise

Checklist EMP: Rationale and Beginnings 2007 review of SG implementation in health & education sectors indicated: –Most of the projects Category “low B” –Environmental impacts usually related only to small scale construction / building rehabilitation –EMPs existed on paper but were long, complex, impractical – and mostly ignored… in most cases, no environmental site management at all Recognition that issues for small scale construction/rehabilitation are fairly standard… no need to continually “re-invent the wheel” ConclusionConclusion: need a streamlined, practical instrument, which would be standardized, easy to prepare, implement and monitor, specifically tailored to small scale infrastructure

Checklist EMP: Eligibility Criteria Category “low B” Project Environmental issues known and limited to small scale construction/rehabilitation works* Area of impact clearly defined & limited: either within an existing “footprint” or relatively small new areas known not to have major environmental or social issues * We’re thinking of developing one for rehabilitation of irrigation & drainage … ideas for other potential applications?

Checklist EMP: Structure and Function components Basic information on project activities Environmental baseline information Part 1: Datasheet Grouped according to various themes or impact types Themes / types to be checked as applicable 2: Screening: potential impacts Each checked item from Part 2 triggers specific mitigation measures / parameters and specific, concrete activities to be implemented on site 3: Mitigation measures for each potential impact Focuses on reasonable, meaningful, practical monitoring parameters for key mitigation measures and impacts 4: Monitoring plan

Parts 1 & 2Parts 1 & 2: description of sub-project and identification of potential impacts: for use by screener/approver Part 3Part 3: identifies issues and associated mitigation measures: becomes part of construction contract Part 4Part 4: monitoring/supervision plan to verify effective mitigation: for use by construction site supervisor and PMU 5 How EMP Checklist is used

6 Typically a project financing small scale works will include multiple sub- projects Project level (prior to Appraisal): a brief EMF, describing scope of sub-projects and potential issues Sub-project level (during implementation): an Checklist EMP completed for each sub-project Note: Checklist EMP approach can also be applied to one project component, with regular EMP or EA applied to others

Example: Country X Real Estate & Cadastre Project (XRECP) prior to Introductory information (to be filled in prior to Appraisal): Project will finance rehabilitation of 15 Cadastre office buildings, all currently in use (sub-projects) No new construction or extension of facilities – all works within existing footprint All buildings located in urban areas on commercial streets with moderate to heavy traffic. Some may be registered historical buildings Rehabilitation will be interior and exterior and may include: repair or replacement of roofs & windows, rewiring, removal/replacement of insulation, masonry repairs, repair/replacement of floors, repair/replacement of plumbing, painting each A site-specific Checklist EMP form will be completed for each sub-project and will be attached to the construction works contract

8 Sub-project Example: Cadastre office construction in Town A Part 1 (Site Description Section )

9 minor issues only Part 2: Screening/ identification of issues (minor issues only) Question: what kind of issues might lead to decision that Checklist EMP is not appropriate?

Part 2 completed for Town A Cadastre Office sub-project

delete any which do not apply Part 3: Mitigation Measures ( delete any which do not apply )

Part 4: Monitoring Plan for selected potential impacts and mitigation measures 12