The n- 3 He Project Christopher Crawford University of Kentucky for the n- 3 He Collaboration n-3He Technical Review ORNL, TN 2013-01-08.

Slides:



Advertisements
Similar presentations
Development of Spherical Neutron Polarimetry Device
Advertisements

PEPPo Weekly Status Meeting February 16, 2011 & 6MSD Planning Meeting February 23, 2011 Part 1 – Technical summary of layout Part 2 – Month-by-Month Installation.
Spin Filtering Studies at COSY and AD Alexander Nass for the collaboration University of Erlangen-Nürnberg SPIN 2008, Charlottesville,VA,USA, October 8,
1/22 MOLLER Juliette M. Mammei. 2/22 Working Groups Polarized Source Hydrogen Target Spectrometer Integrating Detectors Tracking Detectors Polarized Beam.
Overview of GRETINA I-Yang Lee Lawrence Berkeley National Laboratory GRETINA Auxiliary Detector Workshop Washington University January 2006.
T2K – Canada Accelerator & Detector Status D. Karlen University of Victoria & TRIUMF ACOT meeting, May 12, 2007.
AMS-02 tracker mechanics status of assembly and integration at UniGe Outer planes: - Tests of evaporator (cooling loop) integration - Tools to develop.
Background – Maxwell Equations The Maxwell equations arise out of the electromagnetic force laws (Coulomb’s law and the Biot-Savart law) by separating.
AMS-02 tracker mechanics status of assembly and integration Inner tracker integration completion: - Assembly and cabling - Temperature and magnetic field.
TAGGER MAGNET DESIGN Presented by Tim Whitlatch Hall D Tagger Magnet Design Review July 10,
Helium 3 Neutron Precision Polarimetry CHRISTOPHER CRAWFORD, ROEL FLORES, CHRISTOPHER MENARD*, ELISE MARTIN, University of Kentucky *present address: Washington.
We are Here! Gluex Collaboration Meeting May Engineering Status - Presented by Tim Whitlatch1.
The n- 3 He Experiment Christopher Crawford University of Kentucky for the n- 3 He Collaboration FnPB PRAC ORNL, TN
RF Cavity / Coupling Coil Module
The n- 3 He Project Christopher Crawford University of Kentucky for the n- 3 He Collaboration n-3He Technical Review ORNL, TN
Proposal Update: the n- 3 He Parity Violation Experiment Christopher Crawford University of Kentucky for the n- 3 He Collaboration FnPB PRAC Meeting ORNL,
The n 3 He Experiment Probing the Hadronic Weak Interaction Abstract: Although QCD has had tremendous success in describing the strong interaction at high.
MICE RFCC Module Update Allan DeMello Lawrence Berkeley National Laboratory MAP Winter Collaboration Meeting at JLab, Virginia February 28, 2011.
1 Overview of the NPDGamma Experiment at the Fundamental Neutron Physics Beamline Geoff Greene UT/ORNL.
N- 3 He Experiment: overview and updates Christopher Crawford University of Kentucky n- 3 He Collaboration Meeting ORNL, TN
Status of the FETS Laserwire Scanner David Lee UKNFIC Meeting
WBS1 SBS Basic: Magnet and Infrastructure Robin Wines 11/4/ SBS DOE Review.
Slide 1 6-Nov-98PHOBOS Review: Cost & Schedule Cost & Schedule S. Steadman, MIT PHOBOS Cost & Schedule Review Technical Advisory Committee BNL November.
EDM Magnetic Shielding (WBS 5) and Magnets (WBS 6) B. Filippone and B. Plaster Caltech Internal Cost and Schedule Review February 11, 2004.
Status update of n- 3 He experiment DOE FnPB Review, ORNL D. Bowman, S. Penttila Oak Ridge National Laboratory M. Gericke University of Manitoba.
John LeRose March 12, A Program of three “projects” to assemble the Super BigBite Spectrometer for a series of experiments in Hall A There is a.
October 4-5, Status of ARRA funded AIPs Electron Lens Scope, Cost, and Schedule Wolfram Fischer October 4, 2010 Electron Lens.
The Bigbite second GEM tracker. SBS GEM Trackers Front Tracker Geometry x6 18 modules In Italy  50 cm x 40 cm Modules are assembled to form larger chambers.
Normalization of the NPDGamma Experimental Data F. Simmons, C. Crawford University of Kentucky, for the NPDGamma collaboration Background: NPDγ Experiment.
Systematics of the SNS n- 3 He Experiment Christopher Crawford University of Kentucky for the n- 3 He Collaboration APS April Meeting Denver, CO,
Beam Polarimetry Matthew Musgrave NPDGamma Collaboration Meeting Oak Ridge National Laboratory Oct. 15, 2010.
To measure the beam intensity a sampling method was used where two cadmium apertures (P1 and P2) are placed to cut the beam down so the neutron counts/sec.
The HYSPEC Polarized Beam Spectrometer Mark Hagen, Barry Winn, Melissa Graves-Brook Neutron Scattering Science Division David Anderson, Xin Tony Tong Neutron.
Projected performance of NPDGamma and new systematics introduced by SM polarizer Christopher Crawford University of Kentucky NPDGamma Collaboration Meeting.
MICE RFCC Module Update Allan DeMello Lawrence Berkeley National Laboratory MICE CM29 at RAL, UK February 17, 2011.
SksMinus status Hyperball collaboration meeting 2009/3/11 K. Shirotori.
Transversity Readiness and Timeline Xiaodong Jiang, March 17th, This document specifies the overall readiness for Hall A experiments E06-010/E
RSVP AGS Upgrade Projects MECO RSVP Preliminary Baseline Review Brookhaven National Lab April 6-8, 2005 D. Phillips.
BDS: 1 October 13, 2007 BDS KOM EDR planning discussion Andrei Seryi October 13, 2007.
The NPD  Experiment David Bowman IScientific goals IIStatus.
EDM collaboration meeting WBS 9.0: Slow controls, Simulations, DAQ/data analysis Chris Gould- North Carolina State University and Triangle Universities.
Yousef I. Makdisi DIS03 St. Petersburg April 24,2003 Polarized Jet target status The overall view The Dissociator stage The Atomic Beam stage The RF transitions.
DAQ Subsystem Christopher Crawford University of Kentucky Robert Grzywacz University of Tennessee April DoE, Germantown MD.
Spectrometer Solenoid Fabrication Status and Schedule RF Cavity / Coupling Coil Module Plan and Progress Steve Virostek Lawrence Berkeley National Lab.
RSVP AGS Upgrade Projects MECO RSVP Preliminary Baseline Review Brookhaven National Lab April 6-8, 2005 D. Phillips.
The n- 3 He Parity Violation Experiment Christopher Crawford University of Kentucky for the n- 3 He Collaboration NSAC Review Meeting Chicago, IL,
Takeyasu Ito University of Tennessee/Oak Ridge National Laboratory EDM Cost and Schedule Review February, 2005 Beam Splitter / State Selector, Polarizing.
Conceptual Design of the Neutron Guide Holding Field Christopher Crawford, Yunchang Shin University of Kentucky nEDM Collaboration Meeting
Hall D infrastructure and integration Elton Smith Hall D Collaboration Meeting September 9-11, 2004.
Summary Plans Content Module assembly at CERN and Dubna Readout DAQ Procurement Stacking Summary.
MICE RF System Overview Derun Li Center for Beam Physics Lawrence Berkeley National Laboratory Andrew Moss STFC Daresbury Laboratory MICE UK.
Technical Readiness Review of the n-3He Experiment Seppo Penttila ORNL P-div At SNS Jan
Moving the NPDGamma Experiment to the SNS FnPB Christopher Crawford University of Kentucky overview of NPDGamma transition to the SNS expected.
Assembly 12/14/06 #1 Assembly and Commissioning Paul Huffman.
PXIE Beam Instrumentation Status Update – Preparing for MEBT 1.1 Beam Vic Scarpine Feb. 9, 2016.
The n- 3 He Experiment Christopher Crawford University of Kentucky for the n- 3 He Collaboration FnPB PRAC ORNL, TN
10/3/2003Andreas Jansson - Tevatron IPM review1 Tevatron IPM Proposed design.
PIP-II Beam Instrumentation Vic Scarpine PIP-II Machine Advisory Committee Meeting March 2016.
Fundamental Neutron Physics BL-13
Transverse RF Spin Rotator for the n-3He experiment
The NPDGamma Experiment at the SNS FnPB
I Alexander Nass for the JEDI collaboration
n3He Experiment: Spin Flipper and Neutron Polarimetry
The Parity Violating Longitudinal Asymmetry in
Resonant Frequency Spin Rotator For the n3He Experiment
The n3He Experiment Michael Gericke for the n3He collaboration
Cryomodule Assembly Plan
The n-3He Experiment Christopher Crawford for the n-3He Collaboration
Setup for testing LHCb Inner Tracker Modules
Polarized 3He target installation
Presentation transcript:

The n- 3 He Project Christopher Crawford University of Kentucky for the n- 3 He Collaboration n-3He Technical Review ORNL, TN

Outline  Experiment design Physics reaction and observable Experimental setup Installation in the FnPB cave Commissioning and run plan ES&H issues  Collaboration Organization Manpower  WBS subpackages Neutron beamline Magnetic field RF Spin Rotator Target Chamber Preamps Data Acquisition Stand / Alignment  Timeline  Resources P-Division needs

n- 3 He PV asymmetry  Sensitive to isoscalar couplings (I=0) of the Hadronic Weak Interaction  Complementary to NPDGamma (I=1) and p-p scattering (I=0 & 2)  Large asymmetry A = 1.3 x Viviani, et al., PRC 82, (2010), PV observables: Tilley, Weller, Hale, Nucl. Phys. A541, 1 (1992) n n + n n p p p p n n p p n n + p p n n p p n n p p

10 Gauss solenoid RF spin rotator 3 He target / ion chamber supermirror bender polarizer (transverse) FnPB cold neutron guide 3 He Beam Monitor FNPBn- 3 He Experimental setup  longitudinal holding field – suppressed PC nuclear asymmetry A=1.7x10 -6 (Hales) s n  k n x k p suppressed by two small angles  RF spin flipper – negligible spin-dependence of neutron velocity  3 He ion chamber – both target and detector

Assembly in the FnPB cave

Commissioning / run plan 1. Field map in RFSR/Target region 2. Scan beam profile upstream and transfer centroid to crosshairs 3. Scan beam profile downstream 4. Align theodolite to crosshairs 5. Align field probe with theodolite and trim the field to longitudinal 6. Align the position / angle of target with theodolite / autocollimator 7. Tune RSFR / measure polarization 8. Measure physics asymmetry

ES&H Issues  Radiation much lower than from NPDGamma IRR will cover 3 activities: -Front and back beam scans 3 He detector + 6 Li aperture -Polarimetry 3 He polarizer + 3 He monitor -Physics data run 3 He target/detector Beam friendly materials -Aluminum windows transparent to neutrons - 3 He, 6 Li have large cross section with no γ radiation Graduate student will create MCNP model based on NPDG -Will be validated by radiation group  No other safety concerns No HV, Pressure, vacuum, cryogenics, ladders, …

n-3He collaboration  Spokespersons D. Bowman, M. Gericke, C. Crawford  Local Project Manager S. Penttila  Project Engineer Rick Allen  Work Subpackage Leaders M. Gericke Beam monitors G. Greene Polarimetry L. Barrón Magnetic fields C. CrawfordSpin rotator M. Gericke Target chamber J. HamblenPreamplifiers I. NovikovData acquisition D. BowmanAlignment J. Calarco Shielding

Neutron beamline  Scope : FnPB guide, polarizer, beam monitors (existing, NPDG) Beam profile scanners, polarimetry  Status : All equipment exists except aluminum aperture / crosshair Must design shielding to accommodate xy-scanner Must design mount for 3 He analyzer

Magnetic field  Scope : Magnetic field simulations to verity adiabatic spin rotation and uniformity Design and construct longitudinal solenoid and frame Unistructure frame to support RFSR, Target, alignment jigs, mounts on NPDG detector stand.  Status : Conceptual design, preliminary calculations indicate adiabaticity 15 coils, 15 cm apart, 35 cm radius, 150 A turns

Transverse RF spin rotator  Scope: Design and construct RF resonator Driving circuit (use NPDG electronics)  Status: Prototype built and tested, DC current Final design completed Al shell & nylon winding forms machined Need to wind RF coils and map field NPDGamma windings n- 3 He windings

3 He Target / Ion Chamber  Scope : Vacuum chamber, HV + sense wire frames. Gas handling system  Status : Chamber and Macor wire frames delivered Beginning to string wire frames

Preamps  Scope$15k 4 boxes with 32 channels each Design and fabricate circuit, and mechanical enclosure Connector to Target Chamber port and cabling to DAQ module  Status – on critical path Have preliminary design (from NPDG preamps) Must modify circuit for n- 3 He (10x larger signal)

Data Acquisition  Scope: 128 channels of 16/24 bit ADC, > 60 KS/s $25k data acquisition software; RAID storage array $15k  Progress: selected candidate system D-tAcq CQ196CPCI Each card 96 sim. channels + antialias filters + FPGA signal proc. runs Linux on 400MHz XScale processor with gigabit ethernet Inexpensive cPCI chasis used only for power and cooling DAQ software included with hardware – turn-key system awaiting funds to purchase and test system

Alignment  Scope: Aperture / crosshairs for beam scan Support stand and xy-adjustment for theodolite Alignment V-block for trimming B-field Optical system and adjustable mount for target  Progress: Conceptual design

Equipment summary  FnPB / NPDG hardware 3 He beam monitor SM polarizer Beam position monitor Radiation shielding Pb shield walls Beam Stop  New equipment Longitudinal field solenoid mounted on stand Longitudinal RFSF resonator mounted in solenoid 3 He target/ion chamber mounted in solenoid Preamps mounted on target Data acquisition system + RAID storage  NPDG electronics B-field power supply RFSF electronics Trigger electronics SNS / chopper readout Fluxgate magnetometers Computer network

Timeline  Construction of subsystems in parallel Expect to be ready for beam at beginning of cycle Aug 2014 Critical path: preamp design and construction (possibly DAQ) Will stage experiment in EDM building and perform dry run of field map, beam map, and alignment procedures  Milestones Integration of experiment on common stand IRR – begin commissioning phase Begin physics data taking  Runtime 45 days commissioning (all equipment pre-assembled) 15 days PC transverse asymmetry 1.7 x ± 1 x days PV longitudinal asymmetry 1.3 x ± 1 x 10 -8

Resources  All equipment funded except Preamp, DAQ, RAID ($60k) UNAM: (CONACYT $31k) Solenoid and support stand U. Kentucky: (NSF $23k)RF spin rotator U. Manitoba: (NSERC $111k)Target chamber  Minimal utilization of SNS crafts Most equipment mounted on single support structure, staged in the EDM building, craned onto NPDG det. support 3D solid model will be drafted by graduate (Mark McCrea), reviewed by SNS engineer, and incorporated into SNS model MCNP radiation simulation will created by UKy graduate, validated by radiation group Machining will be done at university shops Alignment is relative to beam scan  P-Division operations budget request ($75k) Mainly for Engineering/Radiation support, removal of NPDG See budget spreadsheet for details