Space Power Facility (SPF) CEV Environmental Qualification Testing DISCLAIMER: This Initial Government Concept does not represent a preferred Government.

Slides:



Advertisements
Similar presentations
HVAC523 Heat Sources.
Advertisements

1 Optimizing the Efficiency of the NCAR-Wyoming Supercomputing Center Ademola Olarinde Team Member: Theophile Nsengimana Mentor: Aaron Andersen August.
A Retrofit Strategy for Aging Multi-unit Residential Buildings in Toronto Marianne Touchie November 29 th, 2012 Passive House Canada AGM.
EGR 334 Thermodynamics Chapter 4: Section 6-8
HVAC CONTROLS (See section 18.9)
Setup/Installation/Operation of an Environmental Control Unit (ECU)
“Do not take anyone’s advice as to how this building should be assembled.”
April 23, 2015Committee for Sustainability Building Systems and Energy Use Drexel University April 24, 2008.
Ground Loop Design. Heat Sources Horizontal ground loops  Collector pipework laid horizontally  Requires large land area  Cost.
1 National Aeronautics and Space Administration John H. Glenn Research Center at Lewis Field Dave Taylor Deputy Director, Plum Brook Station.
CNG Refuelling station. A company located in Cherasco (Italy), is among the world leaders in the field of designing and manufacturing of components and.
©2007 Armstrong International, Inc. Instantaneous Water Heater Flo-H 2 0 ™ Water to Water Instantaneous Water Heater Flo-H.
Review of Helium Venting Analyses
HEAT EXCHANGER DESIGN FOR SMALL TO LARGE SCALE LOX-LH2 CRYOGENIC PROPELLANT STORAGE TANKS Justin McCabe Mentor: Dr. Ed Canavan AETD/Code Cryogenics.
Watch the following video and answer the questions on your question sheet. Importance of Testing.
February 17-18, 2010 R&D ERL Roberto Than R&D ERL Cryogenics Roberto Than February 17-18, 2010 CRYOGENICS.
ENVIRONMENTAL TESTING OVERVIEW QUALIFICATION TESTS MIL-STD-810 F PRODUCTION SCREENING HIGH ACCELERATED TESTS (HALT & HASS) ENVIRONMENTAL STRESSES SCREENING.
STEAM HEATING.
Hydronic Mechanical Controls
TOTEM Collaboration Meeting, Feb. 2005, F. Haug, CERN Cooling System for TOTEM Friedrich Haug and Jihao Wu Cryogenics for Experiments CERN TOTEM Collaboration.
High Bay Operations1 GLAST LAT ProjectMarch 2005 LAT Engineering Meeting 14 March March 2005 LAT High Bay Operations Supporting Test Events LAT.
Fcal upgrade for sLHC: Cryogenics modifications – TE-CRG/ C.Fabre 1 ATLAS FCal Upgrade for sLHC: Modifications to the Calorimeter Cryogenic.
Crew Exploration Vehicle Project Office Cryoceiling Vendor Site Visit Solicitation Number: NNC10ZH0023J August 17, 2010.
Plan 2 – Dead-end Seal Chamber Optional Jacket
NCSX NCSX CDR May 21-23, 2002 Larry Dudek Slide 1 Facility Systems (WBS 62-65) L. Dudek, G. Gettelfinger, M. Kalish.
A3 Altitude Test Facility
LARP LQX and MQX Magnets Cryogenic Testing at Fermilab’s Industrial Building 1 Roger Rabehl Technical Division/Test & Instrumentation Department.
5-1 Constellation Space Suit System Government Capabilities and Facilities Crew and Thermal Systems Division.
Thomas Jefferson National Accelerator Facility Page 1 UITF Progress meeting Approved Labyrinth Fresh air pulled through “chicken wire” gate.
EFFECTS OF THE VENUS GROUND AMBIENT ENVIRONMENT ON MATERIALS Principal Investigator: Linda Del Castillo Co-Investigators: James Polk, Michael Pauken, Elizabeth.
1 Measurement, Integration and Test Section (376) Environmental Test Laboratory Group 3765 Themis Pre-Environmental Review 3/06.
Industry Day Vibro-Acoustic Test Capability April 3, 2007.
Utilities 14 October 2008 Martin Nordby, Gordon Bowden.
GLAST LAT ProjectI&T&C Pre PDR Presentation– Oct. 2, I&T&C Organization Chart I&T&C Manager Elliott Bloom WBS I&T Engineer B. Grist WBS
1 BROOKHAVEN SCIENCE ASSOCIATES Abstract Magnet and Girder Integration Lewis Doom, NSLS-II Project National Synchrotron Light Source II (NSLS-II) will.
HVACR416 - Design Heat Loss / Heat Gain Part 1. Why? The primary function of Air Conditioning is to maintain conditions that are… o Conductive to human.
1 Lamp operating factor Published lumen output is based on laboratory conditions Voltage  Rated at line voltage of 115V Standard reactor ballast  Electromagnetic.
NuMI NuMI Target Hall Air System Review Introduction July 30, 2003 Jim Hylen / FNAL Page 1 NuMI Target Hall Air System Review Introduction Air system for.
Systems Integration1 GLAST LAT ProjectMarch 2005 LAT Environmental Test Planning Meeting March 2005 Thermal-Vacuum Testing LAT Environmental Test.
SC Project Review of NCSX, April 8-10, 2008 NCSX Cryogenics Systems WBS-62 Steve Raftopoulos NCSX Cryogenic Systems WBS(62)
Facilities Management and Design Chapter 7 HVAC Systems.
We can…. 2 GLOBAL REFERENCES Rev: 00 References :
LAT Environmental Test PDR1 GLAST LAT Project3-4 May 2005 LAT Environmental Test Planning and Design Review 3-4 May 2005 Operations and Logistics LAT Environmental.
Geothermal. Defining “Geothermal” Energy Dictionary definition – Relating to the internal heat of the earth The Earth acts as a giant solar collector,
1 Mice Collaboration Meeting CM33 Glasgow University 25 th – 29 th June 2012 STFC Daresbury Laboratory Electrical Infrastructure Report Authors : Ian Mullacrane.
SC Project Review of NCSX, April 8-10, 2008 NCSX Cryogenics Systems WBS-62 Steve Raftopoulos NCSX Cryogenic Systems WBS(62) Manager.
Active Solar heating Used for space and or water heating
What is a Cryocar? It is a liquid nitrogen powered vehicle. Propulsion systems are cryogenic heat engines in which a cryogenic substance is used as a.
1 PFC requirements  Basic requirements  Carbon based  Provisions for adding (interface design included in research prep budget)  NBI armor  Trim coil.
Informations and comments on ECE-TRANS-WP.29-GRB e 1 Louis-Ferdinand PARDO (France) Transmitted by the expert from France Informal document GRB
P08452: Reciprocating Compressor Install, Revamp, and Interface Dr. Margaret BaileyFaculty Guide Garry StudleyProject Manager Dave Rigolo Lead Engineer.
Solar Water Heating Bob Ramlow Chapter 3: Types of Solar Water Heaters Bruce Hesher Engineering Technology Brevard Community College.
Status of Vertical Test Stand at RRCAT P Shrivastava, P Mohania,D.Baxy, Vikas Rajput S C Joshi, S Raghavendra,S K Suhane RRCAT, Indore November 26, 2012.
Ahmed Sidi-Yekhlef, 22th-26th September 2008 Cryogenics Operations 2008, CERN, Geneva, Switzerland 1 CRYOGENICS OPERATIONS 2008 Organized by CERN CHAMBER.
Chapter Editor: John Weisend TDR Chapter 6 Cryogenic System, Vacuum System & Test Stands.
Group Status Report 2 MIDTERM Waste Heat Recovery from PV Panels.
Under floor heating Designing underfloor heating (UFH) system must always comply with the system suppliers instructions.
Integrated Design Of Beauty Center & Wedding Hall
ARAC/H/F Air-cooled water chillers, free-cooling chillers and heat pumps Range: kW.
CBETA Technical Review
IT-4189 Supply and installation of a cryogenic distribution system
Kentucky Space Facilities for satellite development, testing and operation Twyman Clements1, David Jones1 ,Jason Bratcher1, Jessamyn Delgado2, Daniel Erb1,
DVT 3-D Shaker System in House Ready for Testing
Energy Efficiency in District Coiling System
Integration and Test Organization Chart
Open Rack Specification 2.1 Update
Liquid Drainers for the Upstream, Mid-Stream, Down-Stream HPI
Conceptual design of the Cryogenic System of Comprehensive Research Facility for Key Fusion Reactor Core Systems Liangbing Hu Sep.4.
Presentation transcript:

Space Power Facility (SPF) CEV Environmental Qualification Testing DISCLAIMER: This Initial Government Concept does not represent a preferred Government approach or solution.

Space Power Facility Cutaway View

Facility Architecture for CEV Testing Random and Acoustic Vibration Test Area Thermal/Vacuum and EMI/EMC Test Area Assembly and Integration Area

Operations Flow * SPF Specific Schemes/Techniques Provide Low Risk Handling of Hardware

Major Area for Facility Upgrades Vibration Test Area

EMI/EMC Testing All tests are performed inside the aluminum vacuum chamber using the chamber as an RF shield Minimum facility modifications required Facility survey was performed showing very low RF noise Utilizes large chamber size to position EMI equipment using movable platforms

EMI/EMC Testing Aluminum vacuum chamber is well suited for radiated susceptibility testing, and for radiated emissions testing Data traces shown in figure indicate that the RF energy penetrating into the chamber is below thresholds used in the International Space Station Program

Random Vibration Testing Large 3 axis state-of-the-art shaker system sized to test CEV full stack and LSAM (LSAM mass 120,000 lbs) 7 shaker system allows for ease of changeover to vertical axis testing 4 – 45,000 lb horizontal 3 – 65,000 lb vertical New data acquisition and control system 450 channel data acquisition system will be used for both random and acoustic vibration testing 1.4 million lb seismic mass installed in high bay Shaker slip table below grade allows for full stack testing Facility can be modified to handle tanks filled with isopropyl alcohol

Acoustic Vibration Testing Chamber Characteristics Build a new 80,000 ft3 (40ft x 45ft x 46 ft tall) RATF with capability of 163 dB in the empty chamber The design of this chamber utilizes known state-of-the-art technology for acoustic testing at these levels and is considered the most powerful chamber that can be built of this size Chamber size is large enough to test the integrated SA/SM/CM/LAS boost cover and the LAS tower as a separate test Chamber size and chamber access doors are large enough to allow testing of the LSAM GRC Utilized Wyle Laboratories for proposal information (worlds leading expert in building acoustic facilities) Typical 60,000 ft3 Reverberant Acoustic Test Facility

Thermal Vacuum Testing Cryogenic Systems Reconfigure existing shroud panels to 40 foot tall x 40 wide x 80 ft long envelope Cryopanel end walls will swing open to allow test article insertion Assembly platform with attached cryofloor will be used for build-up of test article in Assembly Area and allow integrated unit to be moved to test chamber on rail system ISS Testing Cryoshroud Configuration Solar Simulation Build test specific lamp structure Full surround lamp structure with movable sections to allow deployments Existing Power Supply/Controllers 14 zones (7.2 MW) Maximum 400 kW/zone. SCR control Existing chamber penetrations utilized Orion Cryoshroud Concept with Doors Closed

Thermal Shroud System Designed for LSAM Testing CEV Testing Deployable Structures LSAM Testing in Lunar Surface Configuration

Existing Cryogenic Systems Capable of removing up to 14 MW of heat 28 K GAL LN2 STORAGE (60 PSI SUPPLY) 200 K LN2 TANK LOW PRESSURE STORAGE ELECTRIC LN2 VAPORIZER FOR GN2 GN2 STORAGE ~ 70,000 SCF @ 2600 PSI CRYOSHROUD GN2 RECIRCULATION COOLED WITH LN2 DESUPERHEATER LN2 SUPPLY FOR CRYOSHROUD AND DIFFUSION PUMP BAFFLES AND TEST SPECIFIC HARDWARE 11,000 CFM COMPRESSORS CIRCULATE GN2 THRU CRYOSHROUD SPF LN2 & GN2 Distribution Systems

Infrared Lamp System INFRARED HEAT LAMP SYSTEM DESIGN CHARACTERISTICS USES TUNGSTEN QUARTZ LAMPS AUTOMATIC HEAT FLUX CONTROL CLOSED LOOP TEMP CONTROL VARIABLE TEMPERATURE RANGE INDEPENDENT CONTROLLED BANKS 7 MW POWER AVAILABLE INSIDE CHAMBER

Ancillary Facility Support Systems General Maintenance and certification is in progress for the following systems Chamber door and bridge systems 8000 GPM closed system cooling tower Gaseous nitrogen system Facility service air system - 110 psig Electrical substation - 14 MW available Emergency power generator Facility Lifting Devices