Paulo Manso CDM EB September, 2011 Proceeder for Submission & Approval Standardized Baselines.

Slides:



Advertisements
Similar presentations
· © 2011 Perspectives GmbH Towards practical application of CDM Standardized Baselines – Perspectives experience.
Advertisements

The CDM Project Activity Cycle UNFCCC CDM joint workshop March 2003 Bonn Kai-Uwe Barani Schmidt UNFCCC/Cooperative Mechanisms
The Integration of PoA and NAMA; how can one support the other Ingo Puhl South Pole Carbon Asset Management Ltd. Bonn, 8. May 2011 Prepared by South Pole.
CONOR BARRY, Team Lead OSD UNFCCC Secretariat SDM programme Setting expectations of the workshop Bonn, 7- 8 May 2011 Workshop on Programme of Activities.
Key provisions and institutional arrangements of the CDM Christine Zumkeller UNFCCC/Cooperative Mechanisms
BASELINE STANDARD UNFCCC secretariat workshop
T HE W ORLD B ANK C ARBON F INANCE U NIT UNFCCC W ORKSHOP : S TANDARDS FOR BASELINE SCENARIO IDENTIFICATION AND BASELINE EMISSION CALCULATIONS M ARCH 2011.
SDM programme, UNFCCC secretariat Kishor Rajhansa, Programme Officer STATUS AND WAY FORWARD ON STANDARDIZED BASELINES UNFCCC Joint coordination Workshop.
Durban Decisions on the Clean Development Mechanism DUAN Maosheng Chair of the CDM Executive Board First SDM Joint Coordination Workshop Bonn,
Regional Distribution
Transparency and promotion of the CDM
UNFCCC secretariat, Sustainable Development Mechanisms Verónica Colerio, Standard Setting Unit Standardized Baselines in the CDM: Decisions and Way Forward.
JI Governance – review of JI Guidelines
The CDM Policy Dialogue Margaret Mukahanana-Sangarwe Member, High-level Panel on the CDM Policy Dialogue FIRST SDM JOINT COORDINATION WORKSHOP Bonn, Germany,
CDM Regional Distribution Ensuring Broader Participation in the CDM Presented by: Albert Altarejos MAGALANG DNA Forum Chairing Committee.
Defining Standardized Baseline: The role of DNAs Malin Ahlberg Co-Chair of the DNA Forum 13 March 2011, Bonn.
Enhancing Interaction between the DNA Forum and the Executive Board Presented by: Albert Altarejos MAGALANG DNA Forum Chairing Committee.
UNFCCC secretariat, Sustainable Development Mechanisms Programme Modalities and procedures for direct communication with stakeholders 3/CMP 6, para. 21,
UNFCCC secretariat, programme Fleur Newman, Programme Officer Breakout session 4.2 Procedure on significant deficiencies CMP & EB Mandates and 2012 Process.
IPCC Good Practices Guidance and the electronic reporting of GHG inventory tables: useful tools for improving the quality of national GHG inventories of.
1 Validation and registration Verification and issuance Technical Workshop on CDM Paramaribo, 20 June 2008 Adriaan Korthuis.
CDM – LULUCF Project Cycle Winrock International Sandra Brown Training Seminar for BioCarbon Fund Projects.
Validation and Verification of CDM Projects Climate Change Kiosk on CDM/DNA, COP9 December 6, 2003 Marco van der Linden SGS Climate Change Programme.
Module 1: Introduction and recap M1. M1. Introduction and recap This first workshop covers all the following contents – as per work plan: CDM modalities.
UNFCCC Secretariat SDM programme Wrap-up Session: Key Issues Identified and Proposals discussed Practitioners’ workshop on Standardized baselines Bonn,
SDM programme UNFCCC secretariat Session 2: The CDM project cycle Monitoring, Verification and CER issuance Training-Workshop to support the “Uganda Municipal.
UNFCCC Secretariat Status of negociations on CDM Perumal Arumugam Regional Workshop on CDM and NAMAs for Latin America and the Caribbean,Bogota, (31 –
Baselines and Additionality Executive Board decisions so far Steve Thorne SouthSouthNorth COP 9 5 th December 2003.
Ms. Daniela Stoycheva Chair of the JISC COP/MOP 2, Nairobi 14 November 2006 JI Track 2 procedure and its role in JI Track 2 projects UNFCCC Side Event.
Accreditation of Independent entities under JI - Status of JISC work Georg B ø rsting UNFCCC Technical Workshop on Joint Implementation, 9-10 March 2006.
PDD Preparation Cairo, June 14 th -15 th, 2004 TIMS/EEAA CD4CDM- Third National Workshop (Phase II) UNEP RISO / APEXPDD Preparation Process and Format.
Enhancement of participation of local stakeholders, key to success of CDM projects: Current rules and procedures under the CDM Fatima-Zahra Taibi, UNFCCC.
The African CDM Training Workshop and Preparatory UNFCCC COP9 Meeting Addis Ababa, Ethiopia, October 20 – 21, 2003 INSTITUTIONAL SET-UP FOR CDM Dr Youba.
1 Asian Regional Workshop on “Capacity Development for the Clean Development Mechanism” October 2005 AIT, Bangkok, Thailand Institutional Building:
Implementation of standardized baselines guidelines and procedures: Possible Barriers and Challenges, from the DNA perspective Ms.Tsendsuren Batsuuri,
Capacity Development for CDM - RW4 Tunis, August Capacity Development for CDM General Description of the Project Cycle Tunis, August.
Overview of the draft work programme of the CGE First meeting of reconstituted Consultative Group of Experts on National Communications from Parties not.
Björn Zapfel UNFCCC secretariat JI small-scale projects Fourth meeting of the Joint Implementation Supervisory.
UNFCCC Secretariat Utilizing the existing CDM institutional arrangements for NAMAs Perumal Arumugam Regional Workshop on CDM and NAMAs for Latin America.
CDM Project Cycle & Project Design Document Project Design Document First Extended & Regional Workshops CD4CDM Project Siem Reap, Cambodia March.
Kai-Uwe B. Schmidt Maria Netto Cooperative Mechanisms UNFCCC secretariat Clean Development Mechanism (CDM) under the Kyoto Protocol.
© 2006 UNDP. All Rights Reserved Worldwide. Proprietary and Confidential. Not For Distribution Without Prior Written Permission. CDM Project Cycle Anna.
Baselines and Additionality Executive Board decisions so far Steve Thorne SouthSouthNorth Accra, Ghana 7 th and 8 th November 2005.
CDM Project Cycle LGED Bhaban, Dhaka 8 – 9 April 2008 Presented by Khandaker Mainuddin Fellow, BCAS.
Conclusions Buenos Aires, – December 5 th, 2004 CDM Methodologies and Project Design Workshop for CDM Project Developers.
Transitional Committee for the Design of the Green Climate Fund – Workstream II Mandate – status of work, and work plan ecbi Seminar, Bonn 12th June 2011.
Kai-Uwe B. Schmidt Maria Netto Cooperative Mechanisms UNFCCC secretariat Clean Development Mechanism (CDM) under the Kyoto Protocol.
Introduction of information note Compilation and analysis of available information on the scope, effectiveness and functioning of the flexibility mechanisms.
The Role of Designated Operational Entities in the CDM High-Level Roundtable on CDM Reform World Bank Carbon Finance Business Washington, D.C., October.
Steps for Submission of New Baseline Methodologies National Workshop on Baseline Methodologies CD4CDM Project (Phase II) 31 March – 1 April 2004 Sami Mostafa.
CDM: ISSUES FOR CMP 2 AND THEIR IMPLICATIONS TO LDCS Presentation made to the LDC Negotiators Workshop, Nairobi, 3 November, 2006 Richard Muyungi United.
BACKGROUND TO THE CDM By Philip M. Gwage. Structure of Presentation Background  Climate Change Convention  Kyoto Protocol The Clean Development Mechanism.
Introduction to the Project Cycle Jane Ebinger Senior Energy Specialist Sustainable Development Department The World Bank.
Activities on regional distribution of Clean Development Mechanism (CDM) Projects With reference to LDCs.
Determinations / verifications under JI – Experience to date UNFCCC Technical Workshop on Joint Implementation Bonn, February 13 th, 2007 For the benefit.
Update on Methodological Issues Annual Meeting of the Host Country Committee Köln, May 2006.
Francisco Arango UNFCCC secretariat JI section Joint Implementation State of Play UNFCCC Technical Workshop on.
Capacity Development for the CDM (CD4CDM) First National Workshop - SURINAM Host Country Institutional Issues Miriam Hinostroza UNEP.
1 CDM institutional framework Maria Netto UNFCCC secretariat Addis Ababa 21 October 2003
Stage 3. Consultation and Review Standard Setting Training Course 2016.
Clean Development Mechanism
Standardized baselines
EIA approval process, Management plan and Monitoring
JISC – work accomplished and challenges ahead
Implementation Subprogramme
Data warehouse & associated reports
Grid Code What is the Standard Modification Process? Panel
CDM Capacity Development Lessons learnt in Ghana, India, Indonesia, South Africa and Tunisia Anja Wucke DNA Forum, Addis Ababa, 6 October 2007.
Development of determination and verification manual (DVM)
Work Accomplished by JISC
Presentation transcript:

Paulo Manso CDM EB September, 2011 Proceeder for Submission & Approval Standardized Baselines

MANDATE CMP 6 The CMP decided that Parties, project participants, as well as international industry organizations or admitted observer organizations through the host countrys designated national authority, may submit proposals for standardized baselines applicable to new or existing methodologies for consideration by the Executive Board of the clean development mechanism EB 60 The Board requested the secretariat to draft new procedures for submission and assessment of standardized baselines for consideration of the Board at the latest at its sixty-third meeting Operationalizing these decisions needs: Guidelines Procedure

CHARACTERISTICS OF THE GUIDELINES DEFINITION – Standardized baseline = Baseline established for a Party or a group of Parties to facilitate the calculation of emission reductions (and removals) and the determination of additionality for CDM project activities, while assuring environmental integrity. The objective is to translate actual methodology requirements into simple criteria for baseline setting and additionality demonstration on a sector level.

BASIS OF THE PROPOSED APPROACH Guidelines for the Development and Assessment of SBs Baseline setting & PL for additionality Sector Emission Factor if relevant Enough objective and simple both at the setting and at the use of the standard First level of standardization Second level of standardization

Procedure SCOPE – The procedure applies to proposed standardized baselines developed using an approved methodology or tool, or the Guidelines for the establishment of sector specific standardized baselines Note:The procedure does not apply for submission and approval of new methodological approaches to develop a standardized baseline should follow a procedure on submission and approval of proposed new methodologies or revision to approved methodologies.

MAIN ELEMENTS OF THE PROCEDURE (1) ASSESSMENT REPORT ON DATA COLLECTION, PROCESSING AND COMPILATION – To be included in the submission from DNA – Assessment to be done by a DOE contracted by DNA – Parties with less than 10 CDM projects as of 31 Dec 2010 may: Request for financial support to prepare the assessment report only for the first submission The Board may allow funding for subsequent submissions, or Omit assessment report only for the first submission The Secretariat prepares assessment report

MAIN ELEMENTS OF THE PROCEDURE (2) CONSIDERATION PROCESS – Secretariat conducts initial assessment and prepares a draft recommendation – Consultation with 2 panel/WG members If both members agree with the draft recommendation Board If at least one member disagrees with the draft recommendation, or requests panel/WG consideration Panel/WG – Possible consultation with panel/WG – Possible clarification requests to DNA – Possible direct communication with DNA in case further clarification needed – Recommendations to the Board are always either approve or not to approve the proposed standardized baseline –Not to approve recommendation at any stage will be submitted to the Board for its final decision

Parties, PPs, International industry organizations, UNFCCC admitted observers Secretariat 2 panel/WG members Board DNA Initial-assessment 21 days Draft recommendation 28 days Recommendation 7 days Missing doc 42 days 14 days Further information request 28 days Panel/WG Max 2 meetings Further information request Further information 28 days

KEY AREAS FOR CONSIDERATION The Board consider, inter alia: – Whether the conditions for funding for preparation of assessment reports are appropriate, – Whether the roles and involvement of the Secretariat and Panel/WG (members) in preparing a recommendation are appropriate, – Whether it is appropriate to always pass a negative decision to the Board, even for incomplete submissions or DNAs non-response to clarification requests.

Conclusion The submission and appoval proceeds focus on DNAs, The role of the DOEs is minimized and in part substituted by the CDM EB support team at the Secretariat, Lower transaction costs because the finacial support from the Secretariat, If CMP extend the mandate to others activities from the CDM project cycle the PDD, Monitorng, and othersprocessess could be standardized.