Critical Need for Communications Protection in a Deregulated Power Market 1999 IEEE/PES Ernest M. Duckworth Jr., P.E., Senior Member IEEE & John S. Duckworth,

Slides:



Advertisements
Similar presentations
Mitigation of AC Induced Voltage On Buried Metallic Pipelines
Advertisements

The Electrical GuruTM Paul W. Abernathy,CME
Earthing PRESENTATION BY: Er. Satnam Singh Lecturer(Electrical engg.)
New Energy Horizons Opportunities and Challenges Fault Current Contributions from Wind Plants Dean Miller PacifiCorp July 25,
Equipotential Grounding Jim McGrail City of Naperville Safety &Training Instructor Engineering & Operations Technical Conference April 13-18,2007.
Earth Ground Resistance The Basics
Stray Current Investigations A Method of Troubleshooting Stray Current on Underground Residential Distribution (URD) Loops Stacey Mighty Malcolm Distribution.
EE4503 Electrical Systems Design
ELECTRICAL SAFETY Safety Training for the Non-Qualified.
Guide to Network Cabling Fundamentals
AC Mitigation Overview
Lecture 1: Safety and Protection. 1. A robot may not injure a human being or, through inaction, allow a human being to come to harm. 2. A robot must obey.
EET Survey of Electronics
“Equipment bonding jumpers: are they always necessary?” Massimo Mitolo, Senior Member, IEEE.
Proposed Design and the Operation of a Disconnecting Device for Small EG Installations Prepared by Hendri Geldenhuys.
Electrical Power Systems
Disconnect Switches There are many purposes for disconnect switches in substations and power lines. They are used to isolate or deenergize equipment for.
CONSTRUCTION BLUEPRINT READING
Bonding, Grounding and the NEC  Presented by The National Association of Certified Home Inspectors
UMKC Senior SUBSTATION DESIGN TEAM
1 EXPERIENCE AND RELIABILITY. 2 Short circuit loop measurements EN EN
 Volt- Is the measurement unit of the electrical potential.  Electrical Potential- The difference of voltage between two points in a circuit. It is.
Confidential and proprietary materials for authorized Verizon personnel and outside agencies only. Use, disclosure or distribution of this material is.
Safety Training For The Non-Qualified
Electrical Principles and Wiring Materials. Principles of Electricity n Electricity is a form of energy that can produce light, heat, magnetism, chemical.
IEEE Wind Farm Collector System Grounding for Personal Safety Summary of Topics.
Radian Research, Inc. Radian Research, Inc. an employee owned company Power and Energy Measurement Specialists 3852 Fortune Drive.
Grounding, bonding, and ground fault currents
Electrical Safety.
Applied Circuit Analysis Chapter 3 - Power and Energy Copyright © 2013 The McGraw-Hill Companies, Inc. Permission required for reproduction or display.
SWER New Zealand & Australian Experience
Wiring and Grounding.
Copyright  Progressive Business Publications Electrical Safety.
Integrated Grounding, Equipotential Bonding and Lightning Protection in Smart Grids and Smart Buildings – A Multi-Faced Approach Ladies and gentlemen,
1a.  Exposed part  Live or energized part  De-energized part 1a.
Ground loops Why grounding is so important ?DefinitionGround loops :(Introduction)where ground loops affect ?Ground loops are created by :Solutions.
SIGMA INSTITUTE OF ENGINEERING
SAFE PRACTICES IN POWER DISTRIBUTION SYSTEM UNDER NESCO.
07 - Winter 2005 ECE ECE 766 Computer Interfacing and Protocols 1 Grounding Grounds: –Common reference for the circuit –Safety What is the potential problem.
Typical Telecommunications Network
Steady State Analysis Of A Microgrid Connected To A Power System
Top Ten Misunderstandings Regarding Over-Voltage Protection Mike Tachick Dairyland Electrical Industries Inc. SIEO, Jan 2016.
ON 400 KV GSS RAISER JAIPUR ROAD ,BIKANER
132KV GSS PIPAR CITY JODHPUR
A SEMINAR ON 400 KV GSS(RRVPNL) BIKANER.
Atlanta IAS Presentation November 2015 Presentation by: Hilton Mills Hood-Patterson & Dewar 850 Center Way, Norcross GA
CMTF GROUNDING FOR PIP-II K. Carlson PXIE Electrical Coordination Meeting December 19 th, 2013.
Programmable Logic Controller & Distributed Control System Yoon-Je Choi 17 th June 2006.
Earthing in an electrical network ensures your safety.
Permanent Solutions to Temporary Loads: An Alternate Approach to Electrical System Design for Short Term and Mobile Industrial Loading Presented by: Eli.
6 Week industrial Training Presentation
Chapter 30 Electrical Wiring Copyright Goodheart-Willcox Co., Inc. May not be posted to a publicly accessible website. Define basic electrical terms.
STUDY OF ELEMENTS OF A 220/132/33KV SUBSTATION
Fall River Electric Infrastructure in Island Park Bryan Case, CEO.
Copyright 2014 Associated Research, Inc.
Radio Base Stations Sited on Power Line Towers
HVDC LIGHT:- NEW TECHNOLOGY FOR A BETTER ENVIRONMENT
Grounding And Safety Techniques Ms. Tahoora Qureshi, Asst. Professor
Electrical Safety Equipment
GlueX Electronics Review Jefferson Lab July 23-24, 2003
Electricity Distribution Network Design Training & Courses
Design of Electric Power Systems and Utilities
Personal Protective Equipment
Electrical Safety.
Power transmission Energy is lost in transmission lines
EET 323 – Electrical System Design Lecture 9: Grounding
Grounding System Design and Testing for Critical Facilities
Safety Meeting Topics Standby Generator Safety
Ahmed Kulab Moh. Abed Foaad Al-Habeel
Presentation transcript:

Critical Need for Communications Protection in a Deregulated Power Market 1999 IEEE/PES Ernest M. Duckworth Jr., P.E., Senior Member IEEE & John S. Duckworth, P.E.

Introduction A very effective power system operation alone will not be enough as we move into the 21st Century In a deregulated power market, the successful power company will have a very reliable wire-line communication network when fiber is not cost effective. The single most important key to success in this new age will be our ability to communicate error free and without interruption over wire-line, which still represents a large majority of the present entrance facilities.

Reliable Wire-Line Communication Into High Voltage Locations Follow ANSI/IEEE Std Follow ANSI/IEEE Std Know the fault characteristics, grid resistance, X/R ratio, etc.Know the fault characteristics, grid resistance, X/R ratio, etc. Cooperate and coordinate the protection of leased linesCooperate and coordinate the protection of leased lines Practice Personnel SafetyPractice Personnel Safety Go to TrainingGo to Training

Definitions & acronyms used in Electrical Protection High Voltage Interface (HVI) > The separation of wire-line communications conducting paths with the use of magnetic or optical isolationHigh Voltage Interface (HVI) > The separation of wire-line communications conducting paths with the use of magnetic or optical isolation Ground Potential Rise (GPR) > A voltage that develops on a grounding system from current flowing through the impedance of that groundGround Potential Rise (GPR) > A voltage that develops on a grounding system from current flowing through the impedance of that ground Ground Grid or Ground Mat > The grounding system built under a substation or power plant in which all metallic equipment and plant are bondedGround Grid or Ground Mat > The grounding system built under a substation or power plant in which all metallic equipment and plant are bonded Remote Ground > The distant end of a communications circuit that is at a different ground reference point with respect to the near endRemote Ground > The distant end of a communications circuit that is at a different ground reference point with respect to the near end

Why do High Voltage Locations Require Isolation? Ground Potential Rise (GPR)-Average of one per 100 miles of power cable plantGround Potential Rise (GPR)-Average of one per 100 miles of power cable plant Standard Gas Tube, MOV, SAD, Carbon Block, or any other shunting device does not workStandard Gas Tube, MOV, SAD, Carbon Block, or any other shunting device does not work High Voltage Interface (HVI) must be a part of the Facility EntranceHigh Voltage Interface (HVI) must be a part of the Facility Entrance Personnel Safety & Equipment Protection cannot be obtained without an HVIPersonnel Safety & Equipment Protection cannot be obtained without an HVI

When is an HVI Required? GPR exceeds 1000V-Peak-AsymmetricalGPR exceeds 1000V-Peak-Asymmetrical Regardless of the GPR if circuit reliability (Class A Service) is a requirementRegardless of the GPR if circuit reliability (Class A Service) is a requirement Ultimately when the responsible design Engineer perceives its placement as necessary for the protection of personnel and equipmentUltimately when the responsible design Engineer perceives its placement as necessary for the protection of personnel and equipment

Where is an HVI Physically Located? Within the boundary of the ground grid or ground matWithin the boundary of the ground grid or ground mat Where the station cables will have the shortest lengthsWhere the station cables will have the shortest lengths Where it can be maintained properly and sheltered from the elementsWhere it can be maintained properly and sheltered from the elements

How is an HVI Placed? Follow IEEE Std , Guide for the Protection of Wire-Line Communication Facilities Serving Electric Power StationsFollow IEEE Std , Guide for the Protection of Wire-Line Communication Facilities Serving Electric Power Stations Conceptually visualize the HVI as having two sidesConceptually visualize the HVI as having two sides High Voltage Side is the hot side or front side and it connects to wire-line pairs that leave the high voltage location (HVL). Must be in nonmetallic (PVC) conduit with floating shieldHigh Voltage Side is the hot side or front side and it connects to wire-line pairs that leave the high voltage location (HVL). Must be in nonmetallic (PVC) conduit with floating shield Low Voltage Side is the cold side or back side and it connects to wire-line pairs that must stay within the HVL. Must be in metallic (steel) conduit with shield groundedLow Voltage Side is the cold side or back side and it connects to wire-line pairs that must stay within the HVL. Must be in metallic (steel) conduit with shield grounded Never place hot side pairs closer than 5 inches from any groundNever place hot side pairs closer than 5 inches from any ground Never place cold side pairs closer than 5 inches from hot side pairsNever place cold side pairs closer than 5 inches from hot side pairs Never work on an HVI without standing on an 18kV rubber blanket and wearing rubber glovesNever work on an HVI without standing on an 18kV rubber blanket and wearing rubber gloves

Conclusions The three examples listed in the paper were actual cases of lost revenue from not isolating wire-line communications servicesThe three examples listed in the paper were actual cases of lost revenue from not isolating wire-line communications services In a deregulated power market, costs will be the control like never before and the loss of communications will mean disasterIn a deregulated power market, costs will be the control like never before and the loss of communications will mean disaster Don’t gamble with the possible loss of real time information by not properly isolating your wire-line communications. It is just not worth itDon’t gamble with the possible loss of real time information by not properly isolating your wire-line communications. It is just not worth it Electric Companies properly utilizing isolation equipment on their wire- line communication facilities will be prepared to compete head-on in the new age of a deregulated power marketElectric Companies properly utilizing isolation equipment on their wire- line communication facilities will be prepared to compete head-on in the new age of a deregulated power market Are you ready now? Are you trained? Do you have the right tools?Are you ready now? Are you trained? Do you have the right tools? A good number are and do!A good number are and do! A good number aren’t and don’t! Which one are you?A good number aren’t and don’t! Which one are you?

References, Training & Tools in Mastering Electrical Protection IEEE Std. 487, IEEE Std. 367, U S WEST Reference Publication “Special High Voltage Protection” #77321,June 1998, and Bell Practice IEEE Std. 487, IEEE Std. 367, U S WEST Reference Publication “Special High Voltage Protection” #77321,June 1998, and Bell Practice Protection Technologies Inc training in Electrical Protection by William (Bill) Petersen. Two day engineering and installation seminars. Call Protection Technologies Inc training in Electrical Protection by William (Bill) Petersen. Two day engineering and installation seminars. Call Web Site: Site: Expert system software: GPR-Expert by Expert Systems Inc., Expert system software: GPR-Expert by Expert Systems Inc., Richard Knight-Engineering Manager Positron Industries, , Lewis (Lew) Stone-Technical Specialist, Richard Knight-Engineering Manager Positron Industries, , Lewis (Lew) Stone-Technical Specialist,

THANKS FOR BEING HERE TODAY Ernest M. Duckworth Jr., P.E. VP-Power Products Division Positron Industries Inc. 962 Coronado Drive Sedalia, CO PH: Fax: John S. Duckworth, P.E., CEO Expert Systems Programs and Consulting (703)