PROJECT COMPLETION TIMELINE

Slides:



Advertisements
Similar presentations
Project Management For the last day and a half we’ve talked about the APD process – how to get the funding and approval for your project. There is one.
Advertisements

Domino.Doc Project Overview Project Rollout/Schedule Preview Eastman Kodak Health Imaging Doug Smith.
Project Management Information Systems and Management.
Project Management Information Systems and Management.
PROJECT TITLE Project Leader: Team: Executive Project Sponsor (As Required): Date: Month/Day/Year 110/17/2014 V1.
PROJECT TITLE Project Leader: Team: Executive Project Sponsor (As Required): Date: Month/Day/Year 110/17/2014 V1.
Program Management Office Department of Innovation & Technology City of Boston Kickoff Meeting.
Technology Solutions, LLC MU April Thompson – Project Manager Neera Desai – Operations Advisor Charles Lively – Technical Advisor.
A&D High Tech Project Team 2:
CS CS 5150 Software Engineering Lecture 4 Project Management.
BIG Process Flow Annexure A1. Call for Proposals Opens Call for Proposals Closes BIG Partners assigned proposals to review Preliminary screening by BIG.
1 Fundamental Principles of Solution Design and Implementation Chapter 3.
1 CS 501 Spring 2008 CS 501: Software Engineering Lecture 4 Project Management.
The Analyst as a Project Manager
Agenda Background Project Approach & Timeline
Greendale Baseball Stadium
Project plan for ISO implementation Subtitle or presenter.
Managing Outsourced SW Projects Lesson Learned Manoj Singh, PMP.
Papa John’s PeopleSoft Upgrade Supply Chain and Financials Success Story Kara Marado – Zanett Commercial Solutions Christal Williams – Papa John’s.
January 8, 2009 TAC Texas Nodal Program Implementation: P rogram Update Ron Hinsley.
WU1 - Management S. Gammino (INFN). WU1 Management and TDR preparation: overview and criticalities 2 The WP6 aim is to define the best design of the Warm.
Enterprise Product Implementation Process. Components of a Successful Implementation  A detailed Scope Document for customer review and signoff  Creation.
Systems Analysis – ITEC 3155 Feasibility Analysis
CHPT 3 Phase 1: Define The Project. Phase I – Define The Project DiscoveryClarificationPlanning Gathering Info with Client Survey ( redesign.com)
CS 5150 Software Engineering Lecture 6 Project Management.
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS-II Project Baseline Jim Yeck NSLS-II Deputy Project Director NSLS-II PAC Meeting November 20, 2007.
InverstorTech Hadas Mendes. Last Few years ? √ What was missing? - BackWeb Market analysis Product defects (bugs) Higher costs Poor Timing (and positioning.
Slide 1 Project Management Chapter 4. Slide 2 Objectives ■ Become familiar with estimation. ■ Be able to create a project workplan. ■ Become familiar.
Fleming College Quality and Risk Management Review Summary February 2, 2006.
CS 501: Software Engineering Fall 1999 Lecture 6 Management I: Project Management.
Example NAMEROLE Ron LilleyProject Manager ???Project Inspector ????County Planner ????Zoning Inspector HBACivil Engineer ????Architect ????Mechanical.
Lead from the front Texas Nodal 1 Texas Nodal Critical Path Update TPTF Date xxx.
Project Management All projects need to be “managed” –Cost (people-effort, tools, education, etc.) –schedule –deliverables and “associated” characteristics.
1 PROJECT RISKS IMPORTANCE OF COOPERATION BETWEEN PMs AND TEAM LEADs AUGUST 5, 2015.
1 CS 501 Spring 2003 CS 501: Software Engineering Lecture 4 Project Management.
PMC xx/xxxx Project Title & Project Code Presenter:
Phase One – Project Initiation and Set Up Project Name Your Area Health Service.
Works Management Using the Works Management functions.
Strykowsky 1Project Review November 2, 2005 NCSX Project Review November 2, 2005 Cost and Schedule Ron Strykowsky.
OPIM 5894 Advanced Project management A&D High Tech case
Establishing Project Scope 1. Factors Affecting Project Scope  The functionality that must be delivered to meet the user’s needs  The resources available.
Resource Analysis. Objectives of Resource Assessment Discussion The subject of the second part of the analysis is to dig more deeply into some of the.
Chapter 3 : Designing a Consolidation Strategy MCITP Administrator: Microsoft SQL Server 2005 Database Server Infrastructure Design Study Guide (70-443)
ISIS Project Status Report May 18, 2006 Prepared by MAXIMUS, Inc Education Systems Division for the ABT Committee.
Planning & Scheduling a Production Activity BRITA LYONS HEGARTY, MARKET KNOWHOW 16 TH NOVEMBER 2015 TRADEIT: SMART USE OF ITWORKSHOP.
Presentation to Board of Education 1 August 2014 Facilities Capital Plan Board of Education Update August 18,
> Blueprint Executive Summary >. Presentation Purpose; This Executive Summary captures the key details and outputs which merit stakeholder alignment to.
Designing Measurable Expected Outcomes & The Work Plan.
CMM Tech Refresh Project Update
UNIFY Performance - Summary Plans
STUDY TITLE Presenter Name Presenter Title Duty Location
Project Management Chapter 3.
Systems Analysis and Design in a Changing World, 4th Edition
Natural Gas Infrastructure Assessment
Total Reinforcment Solution “So you can work on something else”
LS2 session J.M Jimenez, J.-P. Tock, K. Foraz 24/11/2017
Project Genome Mapping
Overall Project RAG Status
What would improve the RAG status when red or amber
Project Status: [Project Name]
Figure 3: Risk Analysis Model
Project Charter / Kick-off
introducing MICHELLE SLY
The emphasis of Construction Management and Preconstruction Services in the AEC industry Preconstruction Services Construction Management.
What would improve the RAG status when amber or red
What would improve the RAG status when amber or red
Setting up a project file
XRN November 2019 Release - Status Update
Overall Project RAG Status:
Key Activities/ Milestones
Presentation transcript:

PROJECT COMPLETION TIMELINE A & D High Tech Case PROJECT COMPLETION TIMELINE TEAM 3

A & D High Tech Project Plan Project Go-Live Date 11/15/2002 [Assuming Project start date of 06/03/2002] Project Completion Date 11/29/2002 Total Cost Labor Cost = $834,030.00 Capital Cost = $98,500.00 Total Cost = $932,530.00

A & D High Tech Project Plan Critical Path

A & D High Tech Case Plan Potential of the project to be completed on time - Feasible The online store project is feasible and could go live before the holiday season Extensive testing phase should highlight potential problems Strong Project Management & history of timely delivery project Simple and clearly defined project scope Detailed Project Plan Strong Support from Upper Management

A & D High Tech Case Plan Risks & Mitigations Scope Creep - Incorporate Checkpoints & Milestone, Functionality Vs Aesthetics, No changes after Functional Requirements Human Resources - Hire only experienced resources with both prior Domain and Technical experience Resource Back Up - Take services of another Consulting Firm Mythical Man Month - Resource Leveling and Loading Room for Accommodating Scope Changes Minor alterations to existing requirements are feasible but no big changes can be accommodated e.g. adding/changing few fields vs adding a new page.

QUESTIONS??????