1 Cigre Study Committee C5- Brazilia workshop Market Structures and Institutions RISK MANAGEMENT Svein Storstein Pedersen Convenor of TF C5-01-02.

Slides:



Advertisements
Similar presentations
The EU I2010 benchmarking framework and its implementation GENEVE 29 June 2008.
Advertisements

Access to long-term capacity for electric interconnections: toward a single European set of rules 2 nd common RCC CSE-CWE regions 28 September 2010 Milan.
Airi Asperk Estonian Competition Authority Baltic Electricity Market Mini-Forum Jurmala Conclusion of the Monitoring WG 2 nd meeting.
ERGEG Advice Comitology Guidelines on Fundamental Electricity Data Transparency Florence Forum 13 December 2010 Bente Danielsen.
Transposition of Consumer Rights ERGEG Monitoring Report Christina Veigl-Guthann, ERGEG Task Force Chair.
FOURTH MEETING OF THE OIC MEMBER STATES’ STOCK EXCHANGES FORUM Istanbul, October 2-3, 2010 Hüseyin Erkan Istanbul Stock Exchange Chairman & CEO 1.
Walter Boltz, Vice-President CEER 20 th Madrid Forum September 2011 Gas Target Model State of play.
Number of players The number of players at wholesale level is very limited (more then 97% of sources /production + import/ in one /incumbent/ hand) New.
Trading rules in Lithuania Giedrius Radvila Lietuvos energija AB 3 July 2006, Riga II MINI-FORA.
© 2002 KPMG – Dr. Kölschbach – IFRS for Insurance Contracts – 1.
14 th RCC meeting 10 March 2009 ERGEG European Regional Initiative Central-South Region Interconnection report: contents and implementation.
Intraday cross border continuous market and optional Intraday auctions “Economically optimized nomination phase”
1 PROPOSAL FOR PROCEDURES AND SCOPE OF SHA DATA COLLECTION UNDER THE CO-OPERATION BETWEEN OECD, EUROSTAT AND WHO 7 th Meeting of Health Accounts Experts.
Action for establishing a Single Auction Office for CSE Electricity Regional Initiative - Central-South Region 2 nd Stakeholders Group Meeting 21 April.
September  In 1998 Queensland Electricity customers exceeding 40GWH were given the opportunity to enter the National Electricity Market (NEM).
Valeria Termini Member of the CEER GA FTS-CEER bilateral meeting, Florence 06 th February 2012 Investment planning rules in Europe.
Microgeneration and new end-use technologies in ADDRESS, INCA and SEESGEN-ICT Jussi Ikäheimo (VTT) (& Regine Belhomme, Giovanni Valtorta) IEA DSM 17 workshop.
1 The availability, timeliness and quality of rapid estimates UNCTAD experience Henri Laurencin INTERNATIONAL SEMINAR ON TIMELINESS, METHODOLOGY AND COMPARABILITY.
Ricardo CARDOSO DE ANDRADE, DG COMP B-1 6 September 2006 Competition Directorate-General Energy Sector Inquiry – findings and the way forward Presentation.
Electricity Regional Initiative Central South European Region Draft Report on Transparency for the CSE-Region Jan Müller Bundesnetzagentur ERI Central.
Market Design of SE Europe: Reflections from the 3rd Forum on the Way Forward 6 th Permanent High Level Group Meeting Athens, 07 December 2003.
Association of Energy Regulators for Eastern and Southern Africa EgyptEra Electricity Market and Regulators Status in COMESA General Assembly Meeting Lusaka,
Croatian Power System 1 The Electric Power System - Croatia -
The Bolkestein Directive at the European Union level Marjatta Melto EI Pan-European/ETUCE Vice-President.
Ainārs Meņģelsons Public Utilities Commission Latvia 11th Baltic Energy Regional Initiative October 1, 2010 Jūrmala, Latvia ELECTRICITY REGIONAL INITIATIVE.
Energy Agency of the Republic of Serbia
Electricity Regional Initiative Central Eastern European Region Market Entry Barriers – Regulators’ View Walter Boltz E-Control CEE Stakeholder Group Meeting.
Directorate General for Energy and Transport European Commission Directorate General for Energy and Transport Regulation of electricity markets in the.
XIV th Florence Forum 24/25 September 2007 Tahir Kapetanovic / Nicolas Bonnesoeur Chairmen of the CEER Electricity Security of Supply TF C07-SOS-03-03a.
Eurostat ESTP course on International Trade in Goods Statistics April 2013 Point 2 of the agenda Legal framework for EU trade statistics.
Commission’s Proposal for the empowering of the National Regulators and the Agency for the Cooperation of Energy Regulators (ACER ) Alexia Trokoudi Head.
Cross border redispatching Central West Electricity Regional Energy Market Mini Forum Alain Marien 20 th of June 2006.
Exit Capacity Substitution and Revision Transmission Workstream meeting, 3 rd December 2009.
1 Regional electricity market Belgrade, 23. April Ljiljana Hadzibabic Council member Energy Agency of the Republic of Serbia.
Power Sector Reform in Russia: Results and Steps Forward Y.A. Udalcov, Board Member, Head of the Reform Management Centre JSC “Unified Energy System of.
ERGEG Public Hearing 30. June 2005 Congestion Management Guidelines.
Benoît Esnault (CRE) 17 th Madrid Forum 14 January 2010 Pilot framework guideline on capacity allocation mechanisms.
EGEE-II INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks Going from EGEE-NA ES cluster to EGI SSC.
Northern Mini Forum Copenhagen, 27 June 2006 Gunnar Lundberg Chair of the EURELECTRIC WG Wholesale Markets & Trading Vice Chair of the Markets Committee.
Regional Programme of Statistics in the Mediterranean Region MEDSTAT Phase II This project is funded by the European Union 1 Workshop on Data Compilation.
CIGRE TF C5-2-1: Classification of Electricity Markets Worldwide
Ainārs Meņģelsons Public Utilities Commission Latvia 10th Baltic ERI June 4, 2010 Kuressare, Estonia IMPLEMENTATION OF 3-rd EC PACKAGE IN LATVIA.
1 IFAD consideration of a Code of Conduct for Executive Board Representatives Historical Background Presentation to an Informal Seminar of the Executive.
Gas Regional Initiative North West Region - Draft Framework Guidelines Capacity Allocation Mechanisms BNetzA/CRE Pre-Comitology Meeting Bonn – 26 May 2011.
1FTS-CEER bilateral meeting, St Petersburg, 17 May 2011 Peter Plug Chairman of the electricity working group Use and management of interconnections – The.
Overview of Market Reforms and the WESM
Role Of ERC in the WESM To enforce the rules and regulations governing the operations of the WESM and monitors the activities of the Market Operator and.
CONFERENCE IMPLEMENTATION OF MARKETS IN FINANCIAL INSTRUMENTS DIRECTIVE -MiFID- Split, June 2007 OPENING SPEECH Ante Samodol President of the Board.
European Developments Transmission Workgroup 3 rd May 2012.
Guidelines on Transmission Tarification ERGEG Public Hearing 30. June 2005.
Electricity licensing and trading rules in Latvia Mini-Forum, July 3, 2006 Sandija Audzere, Head of Energy Unit, Legal Department Public Utilities Commission.
Christophe Gence-Creux SG FUI, Paris, 4 th November. Target models and roadmap proposed by the PCG.
Driving Innovation DALLAS Mike Biddle Assisted Living Innovation Platform (ALIP) Leader 8 th June 2011 – ALIP Showcase.
Integration of Demand Side Management, Distributed Generation, Renewable Energy Sources and Energy Storages Task status report, Task XVII EXCO meeting.
Customer Focus Group Status Reports
ERGEG Gas Regional Initiative NW 5th Stakeholder Group Meeting
(UNSD introduction followed by open discussion)
ETSO Comments on the draft Congestion Management Guidelines
ERERA AND ECOWAS ELECTRICITY MARKET DEVELOPMENT AND REGULATION
Update on European Network Codes
Economy-wide Material Flow Accounts (EW-MFA) (point 4 of the agenda)
Andrius Šimkus │ Energy Community Secretariat Tbilisi, 5 October 2018
TF environmental transfers
Long-term Capacity Market
Exit Capacity Substitution and Revision
Back-up flexibility for this winter Slow R3 non-reserved power
Item 7 - Roadmap and mandate for the Task Force on UOE Education Expenditure Data Eurostat Education and Training Statistics Working Group - Luxembourg,
PaP Product Definition
Item 5.1 Update on the modernisation of social statistics
FRIBS project – progress report
Presentation transcript:

1 Cigre Study Committee C5- Brazilia workshop Market Structures and Institutions RISK MANAGEMENT Svein Storstein Pedersen Convenor of TF C

2 Electricity as a Risky Commodity Basic Electricity regulation changed Division between competitive sector and the natural monoplies introduced Developing market institutions Tailor-made spotmarkets on national traditions together with the bilateral contracts Increased cross-border trading International harmonisation of national markets lacking New market participants In addition to the producers, the end-users and the traders enter the markets and get commercially exposed Spot and forward prices High volatility makes a profitable business for some and a risky business for all

3 Liberalisation of Electricity Markets

4 Risk Management of Electricity Possible definitions Risk: Costs of future uncertainty –Involves also technical, institutional and legal issues Risk Management: Cost-reduction tool –Risk Management of Electricity is a mixture of standard economical theory and tailor-made solutions based on the maturity of the actual electricity market

5 TF C Risk Management Previous Cigre-work TF Methods and tools for contracts in a competitive framework TF Portfolio and Risk Management for Power Producers and Traders in an Open Market Final Report July 2001

6 TF C Risk Management Scope of the new task force The new TF shall give a detailed exploration of risk management methods for market players in a competitive electricity market taking into account previous CIGRE work. The detailed scope of new TF should be discussed and decided by the participants at the first meeting. Previous to this meeting all the participants should be familiar with the previous CIGRE work.

7 TF C Risk Management The detailed discussion of the scope (1) Type of contract portfolio Contracts defines the rights and obligations for a market participant. Trading portfolios consisting of only financial contracts are very different from portfolios consisting of physical generation. Transmission rights and tariffs Contracts offered from the grid owner/operator for the connection of a market participants and the corresponding rights and obligations for the use of the grid. Handling of congestions and risk management products for the use of the grid.

8 TF C Risk Management The detailed discussion of the scope (2) Market institutions Mature markets includes more advanced financial contracts and thus more risk management flexibility Market imperfection The risk management methods might be very different for markets where some players may apply market power.

9 TF C Risk Management Initial proposed timetable December 2003 – Develop and determine questionnaire April 2004 – Collect and compile information August Discuss and determine scope of final report April 2005 – Discuss and prepare draft final report June 2005 – Final report

10 TF C Risk Management Additional TF-members requested Nomination of TF-members from SC- members to the TF-convenor Asking for new nominations in addition to the existing ones Preferable time limit for new nominations: November 1st 2003