Long Beach West LA/ Santa Monica East Los Angeles Pasadena/ San Gabriel Valley “Make the Right Decisions to Connect the Southern California Light Rail.

Slides:



Advertisements
Similar presentations
Zachary Zabel UP206A March 19, Facility: $1 billion (all privately funded) 68,000 seat stadium expandable to 78,000 for major events Location: On.
Advertisements

Salt Lake City Downtown Transportation Master Plan Light Rail & Bus; Presentation Background and Introduction August 23, 2006.
© 2001 Joint Venture : Silicon Valley Network. “Silicon Valley is at an important evolutionary stage... Our region needs to decide what kind of place.
Sustainable Transit as an Engine for Economic Growth Harriet Tregoning, Director of Office of Economic Resilience, U.S. Department of Housing and Urban.
Portland, Oregon: Smart Transportation Planning By: Eric Boucher Bryan Daupinais Andrew Hurczyn Matthew Pepin.
Restoration of Historic Streetcar Services in Downtown Los Angeles APTA A quick overview August 2, 2011.
Economic Development Benefit/Cost Transit Slides.
Rescue Muni’s 3-Phased Plan For Geary Corridor Rapid Transit Presented by Dan Krause, Andrew Sullivan & David Vasquez.
Twinbrook Sector Plan A New Community in the Technology Corridor
PLANNING IN A COLLEGE TOWN Implementing Smart Growth in College Park, Maryland.
1 Corey W. Hill Chief of Public Transportation May 20, 2008 May 20, 2008.
South Coast Rail Project February 28, 2014 Stoughton Town Hall.
 City of Mesa Council Presentation October 23, 2014.
Station Development Update Melissa DuMond, Director of Planning and Integration April 29, 2015.
Materials developed by K. Watkins, J. LaMondia and C. Brakewood TODs & Complete Streets Unit 6: Station Design & Access.
Presentation to the AMP Leadership Team Moving forward. April 17, 2013.
High Growth Counties: Opportunities for Pinal County Pinal County Comprehensive Plan Curt Dunham AICP Partners for Strategic Action, Inc. Comprehensive.
1 RTD TOD Program University of Denver November 2004.
Intersections Plan Outcomes  Skyway system  Downtown population  Hiawatha Light Rail Corridor  New cultural assets  Target Field  Historic.
Module 6 BUILDING MIXED-INCOME COMMUNITIES NEAR TRANSIT.
1 AASHTO: SCOPT/MTAP Winter Meeting METRO Update: Light Rail Operations and the Status of Future Corridors Wulf Grote, P.E. Director, Project Development.
Definition: The study of how people use space in cities
Center City Access Strategy A Transportation Vision for Growth and Access.
Favorite Places Evan Luton. Clearwater, Florida Clearwater started to gain reputation as a resort community in the 1890s Near Tampa Highest coastal bluff.
Realizing a Fully Revitalized Downtown Mayor’s Quality of Life Forum August 18, 2007.
Los Angeles.
Why is Downtown Important?. The mission of the Asheville Downtown Association is to be a voice of the downtown community and to promote and support quality.
Long Beach West LA / Santa Monica East LA / Whittier Pasadena / San Gabriel Valley “Make the Right Decisions to Connect the LA County’s Light Rail Network”
The 21 st Century Vision Plan for Old Town Lawrence Group | Kubilins Transportation Group | Rose & Associates.
USDOT-ECMT Workshop on Sustainable Travel November 5, 2003 Steve Heminger Executive Director Housing Incentive Program.
1 Module 8 STATION AREA PLANNING. 2 Module 8 Station Area Planning Key Concepts and Definitions Station Area Planning Process 1.Define the Station Area.
Perspectives from members of the Real Estate and Building Industry.
By Yusuf Ogretici Tourist Brochure.
TRB/APTA 2004 Bus Rapid Transit Conference When is BRT the Best Option? the Best Option? 1:30 – 2:40 p.m. Paul Larrousse Director, National Transit Institute.
1 Round One Public Outreach Workshops Fall 2005 DRAFT Bay Area Regional Rail Plan August 2007 Workshops.
Jefferson Area Eastern Planning Initiative Project Overview.
Official Plan Zoning Bylaw Land Uses
West Phoenix / Central Glendale Transit Corridor Study Public Meetings May 2013.
Why do inner suburbs have distinctive problems?
1 High-Speed Rail Evaluation October 12, 2007 Planning Committee.
The Burnham Transportation Plan of Chicago: 100 Years Later CTS-IGERT Weekly Seminar April 23, 2009 Joseph DiJohn Urban Transportation Center.
The Main Street Bike Lane Project LADOT Bike Program.
Village of Villa Park Comprehensive Plan Update CPAC Meeting December 2 nd, 2008.
San Diego Trolley. Current Current/future expansion Propose extension.
Urbanization Key Issue #4: Why do suburbs have distinctive problems?
BUILDING MIXED-INCOME COMMUNITIES NEAR TRANSIT
CAHSR Board Meeting August 6, 2009 Section Update Los Angeles to San Diego (via the Inland Empire) Slide 1 of 10.
Shaping our Future Transportation Transportation trends Influencing trends through land use decisions Alternative futures: Base Case and Scenario Complementary.
Babes-Bolyai University Faculty of Political, Administrative and Communication Science The need for Planning Diana Apostol NGO Management 1 st Year.
The 710 Freeway Threatens Pasadena Presented To The Pasadena City Council August 13, /13/2012 Item 1 Submitted by John Shaffer.
Dreamer Development, LLC Northeast Gateway A Mixed-Use Land Bridge Development Minneapolis, MN.
TOD University 2013 Housing 201: Preservation. Brainstorm: How do we lose affordable apartments? Rent raised Slumlords run building into the ground Fixed.
EASTSIDE ACTIVITY CENTER MASTER PLAN PROPOSED COMPREHENSIVE PLAN AMENDMENT CPA Board of County Commissioners Hearing May 13, 2008.
To be successful, cities need destinations. They need destinations that give an identity and image to their communities and that help attract new residents,
The CTA Gray Line A Benefit for Chicago. Overall Plan Create New CTA Gray Line –On in-city Metra Electric ROW Use Existing Infrastructure Purchase of.
C ENTRAL E STUARY P LAN A V ISION F OR O AKLAND’S W ATERFRONT Central Estuary Plan A VISION FOR OAKLAND’S WATERFRONT Specific Plan and Environmental Assessment.
CBD Characteristics You will need to be able to describe and where appropriate explain the main characteristics of the CBD. Where possible always try and.
Walkable Commercial Districts The US Experience Gary Hack Dean Emeritus and Professor of Urban Design University of Pennsylvania.
Downtown Stockton Housing Strategy Stockton City Council/ Stockton Redevelopment Agency Draft Report August 28, 2007.
Sarah, Anna, Logan, Hannah, Dylan.  Flatiron building under construction stands at intersection of 5 th avenue and 23 rd street in NYC. Opened 22 story.
Urban Land Uses 6 Land Classifications. 1.0 Residential Land Uses includes all the places where people live often takes up to 40% or more of the developed.
Walkable Commercial Districts The US Experience
Alameda Corridor CEE 587 March 30, 2011
Chapter 5: Urban Sprawl in North America: Where Will it End?
URBAN LAND USES 6 Land Classifications.
2017 Crozet Community Survey: Findings Related to Master Plan
CIVIC DESIGN ASSOCIATES
Red Line/HealthLine Extension Major
Center City Connector Fall Open House Presenter: Ethan Melone,
AN INVESTMENT IN CALIFORNIA’S FUTURE
Presentation transcript:

Long Beach West LA/ Santa Monica East Los Angeles Pasadena/ San Gabriel Valley “Make the Right Decisions to Connect the Southern California Light Rail Network” The Regional Gap

Long Beach West LA/ Santa Monica East Los Angeles Pasadena/ San Gabriel Valley “Filling the Gap ” Downtown Regional CONNECTOR

Filling the Gap: Filling the Gap: The Need and Purpose This connector will bring the currently unconnected Expo, Blue and Gold Light Rail Lines together into one Regional system, by bridging the 1.5 mile gap between 7 th St Metro Center (Blue / Expo Line) Station and Alameda / 1st St. (Gold Line) Station. By bridging the gap, two extra transfers between the Red, Blue, Expo and Gold Lines are eliminated. Eliminating these extra transfers reduces travel times. Reducing travel times makes the rail system more user friendly for current and future users. A user-friendly transit system promotes and encourages people to use the system as an alternative to the automobile.

Filling a Regional Gap The connector is more than a rail line serving Downtown Los Angeles, it is a regional transit link that will stretch from the Inland Empire to the Pacific Ocean!

Filling a Downtown Gap South Park / Staples Center / A LA Live / Convention Center Financial District / Central Library Bunker Hill / Grand Avenue / Disney Hall Los Angeles City Hall / Historic Core Little Tokyo / Artist District. The connector will allow residents and visitors access to cultural, commercial and civic attractions such as: Thus changing the perception that Los Angeles is 88 towns in search of a city.

Filling Downtown Gaps The South Park area (between Pico/Chick Hearn Station and 7 th Street Metro Center) is undergoing a major transformation that is turning the sleepy caterpillar of an industrial zone into a beautiful vibrant butterfly of urban life and 24 hour activity with projects such as LA Live, the mixed-use supermarket and other residential buildings. This area is primed to be a vibrant neighborhood that would require regional access. The Connector would help fill that gap.

Filling Downtown Gaps With new residents moving into the Pegasus and the Standard Hotel as well as the renovation of the Arco Towers and Shopping Center (now called 505 Flower), the Lower Financial District (between the existing 7 th Street/Metro Center and a future station near 4 th and Flower) anchored with landmarks such as the LA Central Library and the Bonaventure Hotel is primed to be another attraction that will transform the region. Imagine a visitor or resident being able to fly into LAX and with a single transfer from the Green Line being able to reach to their hotel or apartment Downtown. This can happen and The Connector would help fill that gap. LOS ANGELES ATTRACTIONS 2 FROM LANDMARKS AND TOURIST ATTRACTIONS TO CULTURE AND THE ARTS LOS ANGELES ATTRACTIONS 2 FROM LANDMARKS AND TOURIST ATTRACTIONS TO CULTURE AND THE ARTS LOS ANGELES ATTRACTIONS 2 FROM LANDMARKS AND TOURIST ATTRACTIONS TO CULTURE AND THE ARTS LOS ANGELES ATTRACTIONS 2 FROM LANDMARKS AND TOURIST ATTRACTIONS TO CULTURE AND THE ARTS

Filling a Downtown Gap The Bunker Hill/Music Center area (Future Station on Grand Avenue) with the Walt Disney Concert Hall, Museum of Contemporary Art and the high-profile Grand Avenue project, aspires to bring the people back to the Civic Center and generate the excitement of world class landmarks. But can these buildings do this by themselves? What are Times Square in New York, the Champs Elysees in Paris and Piccadilly Circus in London without the maze of subway and transit lines linking people from various areas to these attractions? Los Angeles’ world class civic attractions require access to mass transit. The Connector would help fill that gap.

Filling a Lifestyle Gap The connector will also allow existing regional residents and growing Downtown residents access to an urban lifestyle. There is a rapidly growing population living Downtown in areas near Staples Center, Bunker Hill, the Historic Core and Little Tokyo. Now is the time to sustain this momentum and prepare for future growth with the tools of rail.

Closing Gaps Closing Gaps By Working Together Constructing this connector will be relatively easy and cost- effective, when it is coupled with planned developments surrounding this corridor (such as the Grand Ave. Development) creating public–private partnerships in which both parties win! The parties can coordinate and preserve easements and rights- of-way that can allow grade separated trains removed from vehicle traffic while remaining pedestrian friendly which invites more people to the attractions. A local example is the Memorial Park Gold Line Station, that allowed for a below-grade station to be built at a reasonable cost. Street running of the connector will interfere with possible 90 second headways to be required for future service demands.

Downtown Regional CONNECTOR Long Beach West LA/ Santa Monica East Los Angeles Pasadena/ San Gabriel Valley Our Vision: We strongly support building the Gold Line east to Citrus Station in Azusa and the Expo Line to Santa Monica as regional priorities. To advance The Connector, we would like to: * attach The Connector to the Expo Line Phase 2 EIR/EIS. This could allow an Expo Construction Phase 2 to Santa Monica and a Phase 3 to 1 st / Alameda. * amend the definition of the project for Federal funding by redefining the eastern end of Expo as 1 st / Alameda and expanding the Expo JPA to that eastern point. * see the next round of Federal Funding cover Expo from Santa Monica to Little Tokyo. * ride the Gold Line from Pasadena to USC.

Downtown Regional CONNECTOR “Filling the Gap ” Post Office Box 567 * San Fernando, California Post Office Box 567 * San Fernando, California V: (818) * F: (818) * V: (818) * F: (818) * Designed and Prepared by Jerard Wright * Edited by Bart Reed Designed and Prepared by Jerard Wright * Edited by Bart Reed DTRC Downtown Regional Connector 12 page (Updated: 28 November 2005)