EFDA EUROPEAN FUSION DEVELOPMENT AGREEMENT FUSION REACTOR RADIOACTIVE WASTES: results, recycling, open issues and R&D W.Gulden, S.Ciattaglia EFDA Close.

Slides:



Advertisements
Similar presentations
Japan/US workshop on Fusion Power Plants, with EU participation, January 2005, Tokyo PPCS Safety and Environmental Analysis presented by Neill P.
Advertisements

1 KRB-A (Grundremmingen, Germany). 2 Type:Boiling Water Reactor Power: 250 MW(e) Started in 1966, shut down in 1977 First commercial power reactor in.
First Wall Heat Loads Mike Ulrickson November 15, 2014.
PhD studies report: "FUSION energy: basic principles, equipment and materials" Birutė Bobrovaitė; Supervisor dr. Liudas Pranevičius.
Substantive environmental provisions Prof. Gyula Bándi.
EFDA EUROPEAN FUSION DEVELOPMENT AGREEMENT EFDA CSU Garching S.Ciattaglia, page 1/25 OVERVIEW OF SAFETY OF EUROPEAN FUSION POWER PLANT DESIGNS Annual Meeting.
A Roadmap to the realization of fusion energy Francesco Romanelli European Fusion Development Agreement EFDA Leader and JET Leader 17 May 2013 Acknoledgments:
School for drafting regulations Nuclear Safety Decommissioning Vienna, 2-7 December 2012 Tea Bilic Zabric.
Fusion Power Plant Licensing and Waste Management by Antonio Natalizio for Presentation at the 9 th Course on Technology of Fusion Reactors at Erice (Monastero.
Page 1 of 14 Reflections on the energy mission and goals of a fusion test reactor ARIES Design Brainstorming Workshop April 2005 M. S. Tillack.
Status of safety analysis for HCPB TBM Susana Reyes TBM Project meeting, UCLA, Los Angeles, CA May 10-11, 2006 Work performed under the auspices of the.
University of Cambridge Stéphane Forsik 5 th June 2006 Neural network: A set of four case studies.
Overview of Advanced Design White Paper Farrokh Najmabadi Virtual Laboratory for Technology Meeting June 23, 1998 OFES Headquarters, Germantown.
ARIES Project Meeting, L. M. Waganer, 3-4 April 2007 Page 1 Groundrules, Bases, and Definitions to Scope “The Next Step” L. Waganer The Boeing Company.
Role of ITER in Fusion Development Farrokh Najmabadi University of California, San Diego, La Jolla, CA FPA Annual Meeting September 27-28, 2006 Washington,
Seminar: Safety in Nuclear Fusion Plants - La Sapienza University (Rome) – 24 April 2015 Design Basis Accidents (DBA) M. T. Porfiri – ENEA UTFUS-TECN (Frascati)
Nuclear Fusion Energy Rishi Gohil ChE 379: Energy Technology and Policy Dr. Thomas Edgar Fall 2007.
MODULE “STRATEGY DEVELOPMENT”
Mid-long term R&D step by step plan in order to implement the recycling at the maximum extension possible Gunnar Olsson and Lise-Lotte Spontón TW5-TSW-001,
OVERVIEW OF SAFETY OF EUROPEAN FUSION POWER PLANT DESIGNS
Office of Nuclear Energy U.S. Department of Energy
Recent JET Experiments and Science Issues Jim Strachan PPPL Students seminar Feb. 14, 2005 JET is presently world’s largest tokamak, being ½ linear dimension.
Associazione EURATOM ENEA sulla FUSIONE Final Meeting of the contracts TW5- TSW-001 and -002 Garching. January 17 th, 2006 Final Meeting of the contracts.
Power Plant Conceptual Studies in Europe
EFDA EUROPEAN FUSION DEVELOPMENT AGREEMENT 1 Agenda Kick Off Meeting of the contract EFDA-ENEA 05/ Task TW5-SEA 4.2 “Update Failure Mode and Effect.
Page 1 of 11 An approach for the analysis of R&D needs and facilities for fusion energy ARIES “Next Step” Planning Meeting 3 April 2007 M. S. Tillack ?
EFDA EUROPEAN FUSION DEVELOPMENT AGREEMENT V. MASSAUT 1 Kick-off Meeting TW5-TSW-001, -001B and -002 Garching 18/01/2006 Participants: CEA, ENEA, NNC,
KIT – University of the State of Baden-Wuerttemberg and National Laboratory of the Helmholtz Association STAC AHG „Objective 4“ STAC AHG Report.
KoM meeting 09 Oct 06 Kick-off-meeting of EFDA TW6-TSL-002 contracts , , , Oct 2006 Kick-off-meeting of EFDA TW6-TSL-002.
Managed by UT-Battelle for the Department of Energy Stan Milora, ORNL Director Virtual Laboratory for Technology 20 th ANS Topical Meeting on the Technology.
San Diego Workshop, 11 September 2003 Results of the European Power Plant Conceptual Study Presented by Ian Cook on behalf of David Maisonnier (Project.
Study on recycling of fusion activated materials: Identify activation levels, characteristics and decay time requirements of irradiated material (deliverable.
1 TW4-TSW-001/D1c: Watching brief activities in the field of radioactive waste management: Detritiation K. Dylst, J. Braet, A. Bruggeman SCKCEN Final meeting.
Final Meeting TW5-TSW-001 Deliverable 7 SCKCEN, L. OomsCulham, October 23–24, 2006.
EFDA EUROPEAN FUSION DEVELOPMENT AGREEMENT 16th TOFE Madison, Sept , EUROPEAN TECHNOLOGICAL EFFORT IN PREPARATION OF ITER CONSTRUCTION ROBERTO.
ARIES “Pathways” Program Farrokh Najmabadi University of California San Diego ARIES brainstorming meeting UC San Diego April 3-4, 2007 Electronic copy:
Vincent MASSAUT 10/10/ EFDA Task TW6-TSS-SEA 2.1 Occupational Radiation Exposure - ALARA in ITER: further refinement Kick off meeting Garching, 10/10/2006.
Final Meeting TW5-TSW-001 Deliverable 2 SCKCEN, L. OomsCulham, October 23–24, 2006.
Main Requirements on Different Stages of the Licensing Process for New Nuclear Facilities Module 4.5/1 Design Geoff Vaughan University of Central Lancashire,
Evaluation of the radiological consequences of tritium present in radioactive components from fusion reactors Task TW4-TSW-001-D1b: Waste and decommissioning.
ITER and Fusion Safety Aspects H.-W. Bartels, ITER Prague, 13.November 2006.
MODULE “PREPARING AND MANAGEMENT OF DOCUMENTATION” SAFE DECOMMISSIONING OF NUCLEAR POWER PLANTS Project BG/04/B/F/PP , Programme “Leonardo da Vinci”
MODULE “PROJECT MANAGEMENT AND CONTROL” WASTE MANAGEMENT SAFE DECOMMISSIONING OF NUCLEAR POWER PLANTS Project BG/04/B/F/PP , Programme “Leonardo.
1 A Consultancy on management of large amounts of radioactive waste after an emergency situation ~ Experience on aftermath of Fukushima Daiichi NPS accident.
Programmatic issues to be studied in advance for the DEMO planning Date: February 2013 Place:Uji-campus, Kyoto Univ. Shinzaburo MATSUDA Kyoto Univ.
KIT Objectives in Fusion by 2020 Workshop on the European Fusion Roadmap for FP8 and beyond April 13 – 14, 2011; IPP Garching.
Associazione EURATOM ENEA sulla FUSIONE Final Meeting of the Tasks TW5-TSW-001, 001B, October 2006, UKAEA, Culham, UK Final meeting tasks TW5-TSW-001,
1 ESTABLISHMENT OF REQUIREMENTS Module “DECOMMISSIONING PROCESS” Project BG/04/B/F/PP , Program “Leonardo da Vinci”
El Cabril near surface disposal facility
IAEA International Atomic Energy Agency Methodology and Responsibilities for Periodic Safety Review for Research Reactors William Kennedy Research Reactor.
Associazione EURATOM ENEA sulla FUSIONE KOM Meeting of the contracts TW5- TSW-001 and -002 Garching. January 18 th, 2006 Kick Off Meeting of the contracts.
MONITORING MEETING EFDA Technology Workprogramme 2005 Activities Field: Safety and Environment Task Area: Waste Management TW5-TSW-001 Mol, June.
Vincent MASSAUT 24/10/ of ? slides Final meeting tasks TW5-TSW-001, -001B, -002 Recycling issues Introduction V. Massaut October 2006 UKAEA,
International Atomic Energy Agency Regulatory Review of Safety Cases for Radioactive Waste Disposal Facilities David G Bennett 7 April 2014.
Legal challenges in reviewing application for final disposal of spent fuel Tomas Löfgren.
EFDA EUROPEAN FUSION DEVELOPMENT AGREEMENT V. MASSAUT 1 Monitoring Meeting TW5-TSW-001, -001B and -002 Mol 27/06/2006 Participants: ENEA, NNC, STUDSVIK,
1 TW6-TSW-003 Kick off meeting EFDA Garching October 9 th, Kick off meeting TW6-TSW-003-D1 Watching activities: Study and analysis of detritiation.
IAEA International Atomic Energy Agency Presenter Name School of Drafting Regulations for Borehole Disposal of DSRS 2016 Vienna, Austria Siting Strategies.
ZHENG Guo-yao, FENG Kai-ming, SHENG Guang-zhao 1) Southwestern Institute of Physics, Chengdu Simulation of plasma parameters for HCSB-DEMO by 1.5D plasma.
Low Power and Shutdown PSA IAEA Training Course on Safety Assessment of NPPs to Assist Decision Making Workshop Information IAEA Workshop City, Country.
Associazione EURATOM ENEA sulla FUSIONE Monitoring Meeting of the Tasks TW5-TSW-001, 001B, June 2006, SCKCEN, Mol, Belgium Monitoring Meeting.
Study on recycling of fusion activated materials: Identify activation levels and decay time requirements of irradiated material (deliverable 3) R. Pampin.
DECOMMISSIONING OF NUCLEAR POWER PLANTS IN THE CZECH REPUBLIC Peter Lietava Division of Radioactive Waste and Spent Fuel Management State Office for Nuclear.
Some technological problems of fusion materials management Boris N. Kolbasov a *, Laila El-Guebaly b, Vladimir I. Khripunov a, Youji Someya c, Kenji Tobita.
Garching, January 17th, 2006: L. Ooms EFDA Technology Workprogramme 2005 Activities Field: Safety and Environment Task Area: Waste management.
Pierre SARDAIN 1 Power Plant Conceptual Study Approach to wastes management.
US Participation in the
South Carolina Perspective on Part 61 Proposed Revisions
The European Power Plant Conceptual Study Overview
Presentation transcript:

EFDA EUROPEAN FUSION DEVELOPMENT AGREEMENT FUSION REACTOR RADIOACTIVE WASTES: results, recycling, open issues and R&D W.Gulden, S.Ciattaglia EFDA Close Support Unit, S&E Field, Garching Germany Outline Introduction Radioactive waste from Fusion Reactors categorization and quantification acceptability in EU repositories recycling (operating experience, open issues) Strategy and R&D Conclusions

EFDA EUROPEAN FUSION DEVELOPMENT AGREEMENT Introduction The four (+1) conceptual design for commercial fusion power plants differ in their dimensions, gross power and power density but All models meet the overall objectives of the PPCS: design, safety, economics. Confirmed the intrinsic safety characteristis of all the models Comprehensive safety analysis of PPCS has showed “No evacuation” criteria is met with margin also in case of BDBA driven by internal events Intrinsic-passive safety features have been confirmed also from the bounding accident sequence analyses Model B, BDBA LOFA + in-vessel LOCA provides the largest environmental source terms (well below the evacuation limit: 0.42 versus 50 mSv) ORE needs attention Radioactive wastes amount are significant

EFDA EUROPEAN FUSION DEVELOPMENT AGREEMENT Radioactive waste from fusion reactors ÜThe fusion radioactive wastes are characterised by low heat generation density and low radiotoxicity. ÜTherefore recycling could be a viable option ÜStoring the fusion radioactive materials for years on the plant allows reduction of radioactivity level waste masses ÜTheir amount is significant in terms of amount and volume ÜRadioactive wastes represent a very important aspect with respect to Ä Cost Ä Licensing Ä Public acceptance Therefore significant effort have to be pursued in order to reduce their amount

EFDA EUROPEAN FUSION DEVELOPMENT AGREEMENT Plants main features Model AModel BModel CModel D Structural materialEurofer SiC/SiC CoolantWaterHeliumLiPb/HeliumLiPb BreederLiPbLi4SiO4LiPb TBR Structural materialCuCrZrW alloy SiC/SiC Armour materialW alloy Blanket DV

EFDA EUROPEAN FUSION DEVELOPMENT AGREEMENT Decay Heat Models A & B

EFDA EUROPEAN FUSION DEVELOPMENT AGREEMENT Specific activity of the mid-plane outboard first wall in four Plant Models Dominant radioisotopes ÜH3, Be10, Ni 63, C14, Co60, Nb94, Ag108m, Activation of tokamak structures and components

EFDA EUROPEAN FUSION DEVELOPMENT AGREEMENT Categorisation and quantification ÜEvaluated the operational and decommissioning waste quantity ÜA useful classification considered till now (waste as PDW, CRM, SRM, NAW) is under discussion in order to Ä take into account the operating experience with NPP wastes Ä Include the limits of the actual repositories Ä consider the possible results of a dedicated R&D programme for Fusion waste recycling

EFDA EUROPEAN FUSION DEVELOPMENT AGREEMENT For ALL the Models: ÜActivation falls rapidly: by a factor 10,000 after a hundred years ÜSignificant contribution to SRM and CRM from operational wastes ÜPotentiality to have no waste for permanent repository disposal ÜPresence of tritiated +  activated wastes too Wastes from model B Waste Management: evaluation and categorisation

EFDA EUROPEAN FUSION DEVELOPMENT AGREEMENT Waste Management: masses

EFDA EUROPEAN FUSION DEVELOPMENT AGREEMENT If no recycling is planned, the amount of wastes to be disposed after 100 years, is equal to the CRM+SRM amounts Suitability and capability analyses of the final waste repositories in a few EU countries to store the PPCS wastes were performed (Konrad and Gorleben in Germany, SFR and SFL 3-5 in Sweden, CSA in France, El Cabril and DGR in Spain) With reference to Model B and German regulations, the fusion reactor waste can be all disposed in Konrad. For a few ones, detritiation is necessary to meet the relevant limits Acceptability in EU repositories

EFDA EUROPEAN FUSION DEVELOPMENT AGREEMENT Recycling Present operating experience basically limited to SRM Üthe melting process is applied in fission to homogenize the material (easy to measure), to separate the contamination from the base melt and for a volume reduction (~80%) Ümelting of slightly radioactive metallic materials is well developed for NPP on materials with low activities, 200 Bq/g as average (limit from ORE to the staff) Üan activity level of 1000 Bq/g should be feasible to handle without remote control Üsome melting facilities are set up to perform “hands on” recycling; only the furnace is in some cases fed by an automatic system. Others are mostly remote controlled, but some operations demand still the operator intervention Üthe development of a reliable melting facility completely remote controlled is feasible (some R&D is necessary) Ümaterials treated up-to now: Al, Stainless Steel, Carbon Steel, Pb, Cu, Zn, Brass Üthe products of a melting are simple ingots; if the material is re-used afterwards it is melted again and mixed with other materials Üthe melting facilities are equipped with test furnaces which can be used for test on fusion materials. Such tests will already give an idea of the applicability of the melting process in fusion recycling

EFDA EUROPEAN FUSION DEVELOPMENT AGREEMENT Open Issues The NPP waste recycling techniques are not mature/ extendible to Fusion wastes ÜLimits (Activity) too severe, high dose rate even after 100 years of decay : needs of RH ÜThe materials treated up to now are limited and the products are simple (e.g. ingots) ÜThe tritium present in the fusion materials is a problem for the off-gas treatment Ü Some fusion materials can not be submitted to the melting process (i.e. those joined by special bonding techniques). Other techniques are necessary to be developed During fabrication the fusion materials are submitted to sophisticated testing Some parameters are not yet known when using recycled materials:  Influence of the impurities  Influence of the build up of activation products  Influence on material properties  Dose rate and activity level  As RH is unavoidable, the recycling process could be done immediately (i.e. for operational wastes) or after decommissioning: here a decay period can have a lot of advantages Recycling

EFDA EUROPEAN FUSION DEVELOPMENT AGREEMENT Decay 60 dDecay 1 yDecay 10 y Decay time Activity of the fusion materials in comparison with the activity limits of the present recycling facilities

EFDA EUROPEAN FUSION DEVELOPMENT AGREEMENT Strategy and R&D  show to the public that recycling can be applied on fusion materials and there is no waste burden for future generations. (Future generations can then decide whether recycling is economically acceptable at that time)  the material cycle of the fusion material and equipment should be studied in detail. Where necessary and if possible, the material design could be adapted for easy recycling afterwards  There are still many years before the production of Fusion reactor wastes: an R&D plan has to be launched  Benefiting from NPPs waste recycling as far as possible  Defining an ad-hoc programme considering the peculiarities of Fusion Wastes  Close feedback with designers of structural components to take into account the waste issue in their R&D programme at the highest importance

EFDA EUROPEAN FUSION DEVELOPMENT AGREEMENT 2 tasks are going to be launched Study on Recycling of Fusion Activated Materials 1.strategies, feasibility and limitations for recycling structural material 2.detritiation needs, the relevant technique available and/or their feasibility for the most relevant tritiated components 3.consideration about the cost of recycling considering a few significant scenarios 4.limitations to the practical recycling of fusion materials, possibly leading to a re- assessment of the criteria to be adopted in the categorisation of waste materials from a fusion power plant 5.proposal for a mid-long term R&D step by step plan in order to implement the recycling at the maximum extension possible Complex Recycling of Fusion Wastes 1.a completion of the status and what is on going or planned in the fission industry about recycling/reuse of radioactive waste. Extrapolation to fusion power reactor wastes and feasibility of recycling and reuse of fusion materials A big effort is necessary in the mid-long term R&D

EFDA EUROPEAN FUSION DEVELOPMENT AGREEMENT Conclusions The four(+1) PPCS conceptual design for commercial fusion power plants differ in their dimensions, gross power and power density All models meet the overall objectives of the PPCS: design, safety, economics Comprehensive safety analysis of PPCS has showed “No evacuation” criteria is met Intrinsic-passive safety features has been confirmed Model B, BDBA LOFA + in-vessel LOCA provides the largest environmental source terms ORE needs attention Wastes amount are significant but they are characterised by low decay heat and low radiotoxicity. There is the potentiality to have no need of permanent disposal waste after 100 years from shutdown if complex recycling is applied

EFDA EUROPEAN FUSION DEVELOPMENT AGREEMENT Most of the open issues are relevant to the short life time of first wall components This issue is leading most of the future R&D Physics advanced plasma scenarios (improved confinement), in particular good confinement regime with divertor tolerant ELMs regimes with large fraction of plasma current is driven not inductively control of plasma transients: ELMs, VDEs and disruptions SOL, particle exhaust and control Materials&components optimisation of low activation martensitic steels, use of ODS development of more advanced materials (e.g. W as structural material and SiC/SiC) He cooled divertor development and test of blanket and divertor systems development and qualification of RH Safety Control of dust and tritium in the VV (source terms) Lack of operating experience (Reliability of prototypes, ORE minimisation) Waste management: quantity of operational waste, tritiated +  waste disposal Detritiation Recycling Conclusions: issues and relevant R&D

EFDA EUROPEAN FUSION DEVELOPMENT AGREEMENT Answers expected from ITER operation EFDA R&D technology programme DEMO power plant study Strategy and R&D on reactor fusion wastes Benefit from Recycling of NPP wastes as much as possible Detritiation needs and relevant techniques Reduction of wastes as one of the power plant design criteria of highest importance R&D on existing/modified recycling facilities with reference to fusion specific wastes RH development Cost considerations-optimisations Reduction of waste is possible through a mid-long term strong-focussed R&D programme Conclusions: issues and relevant R&D