Inner bearing Outer & Thrust bearing TWO GASTURBINES DRIVING PROCESS COMPRESSOR Compre ssor EQUIPMENT TRAIN ARRNAGEMENT.

Slides:



Advertisements
Similar presentations
Vibration Analysis (cont)
Advertisements

JET ENGINE MECHANICAL ARRANGEMENT
Status of Cryogenics at point 4 following the power cut L. Tavian 20 August 2011.
Engine Systems J-52-P408 &J-52-P6/P8
Basic Refrigeration Cycle
Perform Control Test. Check for Consistent Liquid Temperatures Entering and Leaving Liquid Temperatures should be close when the water pumps are on but.
Four Stroke SI Engine Stroke 1: Fuel-air mixture introduced into cylinder through intake valve Stroke 2: Fuel-air mixture compressed.
JET PROPULSION Part 3 The Jet Engine.
Labyrinth seal into two halves
ENGINE ROOM LOG.  During the watch a log is kept of the various parameters of the main and auxiliary equipment. This may be a manual operation provided.
______________________________________________ LECTURE 10 Machines that Store and Transfer Energy Thermodynamics and Energy Conversion ________________________________________.
BHEL, POWER SECTOR – TECHNICAL SERVICES (HQ), NOIDA
Boone County ATC Diesel Technology DIT150: Powertrain Mr. Hillenbrand Spring 2015 Torque Converters.
Converting Journal Bearings to Tilting Pad Bearings to Control Oil Whip & Vibration in a Gas Turbine Tony Dzubay Rochester Public Utilities E & O TECHNICAL.
1 Oil oxidation impact on Feed pump and turbine performance Presenter: Walter Bischoff.
Gas turbine cycles for aircraft propulsion In shaft power cycles, power is in form of generated power. In air craft cycles, whole power is in the form.
Introduction to Transient Simulations
Parameters monitored by Quick 1.Vibration (5 Hz) Up to 4 vibration channels usually configured to monitor the same vibration transducer at different frequency.
Presentation On Vibration Analysis
COMPRESSOR BASICS.
CMS FPIX Cooling Prototype Phase One Estimate and Conceptual Design R. L. Schmitt 10/28/2009.
Where We Go Wrong - With Compressors Dick Hawrelak Presented to ES-317y in 1999 at UWO.
1 Simulation and Implementation of Turbocharging a 600cc Engine for Formula SAE Mario Farrugia Nicholas Grech Marlon Chircop Jean Paul Azzopardi.
Results from CO 2 heat pump applications Ullrich Hesse, Zexel Valeo Compressor Europe GmbH.
Analysis of Turbofan Engine
Left side compressor behind Left control box Right side compressor behind Right control box.
MineralScan Fill Level Signal Examples & Explanations - RNMC Introduction The MineralScan MillSlicer system normally consists of two fixed vibration sensors.
Gas Turbine Theory and Construction
Endend Oil and gas market. endend Customer requirements High reliability Low operating costs Low first cost Local codes and standards Domestic content.
Motor Testing (Motor Only)
Gas Turbine Theory and Construction. Introduction Comprehend the thermodynamic processes occurring in a gas turbine Comprehend the basic components of.
1 CRITICAL ROTATING EQUIPMENT CRITICAL ROTATING EQUIPMENT PACKAGES – 12 FOR POWER GENERATION INCLUDING STEAM TURBINES and 14 FOR GAS COMPRESSION.
Steve’s Handy Guide to Orbits
Rolling Element skidding
MakeFLENDER ModelKMP-440 Main Gear Box TypePLANETARY GEAR BOX Serial Number Rating1, KW Main Gear Box Ratio30.6 Input RPM
Turbocharger matching While the operating engineer will not normally be involved in turbo-charger matching, a familiarity with the procedure will lead.
Unit 2 -Gas And Diesel Power Plants
Review of Components Analysis Aerospace Engineering, International School of Engineering (ISE) Academic year : (August – December, 2012) Jeerasak.
Experimental and numerical studies on the bonfire test of high- pressure hydrogen storage vessels Prof. Jinyang Zheng Institute of Process Equipment, Zhejiang.
Federal Aviation Administration 0 Composite Wing Tank Flammability November 20, Composite and Aluminum Wing Tank Flammability Comparison Testing.
Find phrases from the text which mean: went up and down frequently: did not change: went up a little: went up very quickly: arrived at its highest point:
Presented by: Timothy S. Irwin, P.E. Senior Mechanical Engineer
Date of download: 6/2/2016 Copyright © ASME. All rights reserved. From: Effect of Cooling Flow on the Operation of a Hot Rotor-Gas Foil Bearing System.
WORK Work = Force x Distance POWER power = work done ÷ time taken ENERGY 1-POTENTIAL ENERGY (Potential Energy = Force x Distance ) 2-KINETIC ENERGY Energy.
TYPE “HOS” 6” Stroke Compressor & Ancillary Equipment
2015 Operations Stay Treat CHL2 4K Cold Box Modifications SC1 2K Cold Box CC4 Failure Helium and LN2 Losses Contamination Operations Stay Treat.
Advantages of Rotating Machines Less balancing problems Low lubricating oil consumption Higher reliability.
Des. Ton Nguyen. MAIN PARTS  Fan  Compressor  Combustor  Turbine  Nozzle.
18 MW TURBINE CONTROL PANEL
VARIOUS FUNCTIONS OF OIL Lubrication and cooling of Bearing. Jacking up the shaft and to provide hydrostatic lubrication during low speed operation through.
IN THE NAME OF ALLAH, THE BENEFICENT, THE MERCIFUL
WELCOME Starting System of 2x14.45 MW GasTurbine & Gas Analyser
Starting SYSTEM.

GROUND SERVICING OF VARIOUS SUB SYSTEMS
Gas Turbine Theory and Construction
GROUND SERVICING OF VARIOUS SUB SYSTEMS
Overview Focused on trip that took place on February 19, around 4:11 PM. Includes data to help understand the nature of the trip. Roughly 2 minutes prior.
Introduction to Electrical Drive
air cycle cooling systems
Fans & Heaters technical seminar
Introduction to Transient Simulations
ITEMS TO CHECK ON Running Pumps
Motor-CAD Software General Presentation
Trane Care Energy RTHD Adaptive Frequency Drive retrofit.
ENGINE PERFORMANCE The performance data for takeoff and landing an aircraft can be obtained from the aircraft's flight manual or pilot's operating handbook.
Unit 6 Turbine Vibration Investigation - Observation by PMT
Presentation transcript:

Inner bearing Outer & Thrust bearing TWO GASTURBINES DRIVING PROCESS COMPRESSOR Compre ssor EQUIPMENT TRAIN ARRNAGEMENT

Inner beari ng Outer & Thrust bearing

Train Arrangement RR-Avon gas generator aerodynamically coupled with Cooper Bessemer PT at both end of refrigeration compressor. Discussion Major Problem is high vibration in outer bearing which has fluid film bearings and orthogonal proximity probes set up. Keyphasor is not active due to non availability of notch in the installed spare rotor. but the equipment is connected with system 1 online monitoring. Vibration trend was steady and stable for more than 6 months, Due to ambient temperature rise ( 48 deg c) sudden peak in vibration noticed in Power turbine outer bearing from 0.7 mills to 2.2 mills. Rise in outer bearing sustains more than minutes. After the rise again it reaches the base line value and maintains on it. Event doesn't follow any particular time based cycle. Inner bearing followed that but resulted with slight rise also randomly noticed slight drop in amplitude while outer bearing vibration ramp up. No significant vibration changes observed in other (compressor, lead power turbine) bearings during high vibration of outer bearing and normal running. Vibration Spectrum clearly shows only 1x (70 %of direct value) of PT speed and smaller quantity of harmonics. And noticed significant rise in Process variables. All the process variables such as compressor load, Gas Generator fuel flow, EGT, bearing oil pressure, Temperature … trend checked no correlation to the event.

47 MIN 3 MIN STAY OUTER BRG VIBRATION TREND Y 0 deg X 90deg

Y 0deg

NOTE; random Drops in Inner bearing while rise in outer bearing