AWAKE electron source New Electron Source WP at CERN

Slides:



Advertisements
Similar presentations
Areal RF Station A. Vardanyan RF System The AREAL RF system will consist of 3 RF stations: Each RF station has a 1 klystron, and HV modulator,
Advertisements

Diagnostics and commissioning on ERLP Yuri Saveliev ASTeC CONFORM Project: EMMA Design Review Workshop February 2007, Daresbury Laboratory.
1 Low-energy RHIC electron Cooler (LEReC) Update November 17, 2014.
Before aperture After aperture Faraday Cup Trigger Photodiode Laser Energy Meter Phosphor Screen Solenoids Successful Initial X-Band Photoinjector Electron.
Cecile Limborg-Deprey Injector October Injector Physics C.Limborg-Deprey Diagnostics and Commissioning GTL measurements.
Beam loading compensation 300Hz positron generation (Hardware Upgrade ??? Due to present Budget problem) LCWS2013 at Tokyo Uni., Nov KEK, Junji.
AWAKE workshop, Greifswald, September 24 th -26 th, 2014Steffen Döbert, BE-RF AWAKE electron source update.
AWAKE RF Synchronization and LLRF Budget Review Reported by Wolfgang Hofle Acknowledgement: A. Butterworth, H. Damerau, S. Doebbert, J. Molendijk, S. Rey.
Carbon Injector for FFAG
The AWAKE Project at CERN and its Connections to CTF3 Edda Gschwendtner, CERN.
R&D proposals for EuCard 2 EuCard2, April 21Steffen Döbert, BE-RF  SRF basic research (W. Weingarten)  CTF3 and CTF3+, possible infra - structure for.
ASTA roadmap to EPICS and other upgrades Remote monitoring and control DAQ Machine protection Dark current energy spectrometer.
IWLC - 21st october 2010Califes CTF3 probe beam - Wilfrid Farabolini1 CTF3 Probe Beam Status 1.
Recent Experiments at PITZ ICFA Future Light Sources Sub-Panel Mini Workshop on Start-to-End Simulations of X-RAY FELs August 18-22, 2003 at DESY-Zeuthen,
1 CTF3 collaboration meeting 2007 G.Geschonke Status Status of CTF3 G.Geschonke CERN.
Electron Source Configuration Axel Brachmann - SLAC - Jan , KEK GDE meeting International Linear Collider at Stanford Linear Accelerator Center.
9 th AWAKE Technical Board 11 March Actions from Last Technical Board WP laser and MPP: decide until March 2015 which compressor design will be.
CLARA Gun Cavity Optimisation NVEC 05/06/2014 P. Goudket G. Burt, L. Cowie, J. McKenzie, B. Militsyn.
Kévin Pepitone 1CLIC project meeting, CERN, December 1st, 2015 Kevin PEPITONE, BE-RF Drive Beam Injector Gun.
Accelerator Science and Technology Centre Extended ALICE Injector J.W. McKenzie, B.D. Muratori, Y.M. Saveliev STFC Daresbury Laboratory,
Laboratoire de Chimie-Physique CNRS – Université Paris-Sud UMR ORSAY Cs 2 Te photocathodes at ELYSE.
NSLS-II Transfer Lines BUDKER INSTITUTE OF NUCLEAR PHYSICS NOVOSIBIRSK.
CLIC work packages CTF3-003 (TBL+) CLIC0-001 (CLIC DB injector) CLIC0-002 (photo injector option for CLIC DB injector.
LINAC4 and the Upgrade of the LHC Injector Complex R. Garoby 26 February, 2013.
Electron Source Design Dr Tim Noakes ASTeC, STFC Daresbury Laboratory.
People Xavier Stragier Marnix van der Wiel (AccTec) Willem op ‘t Root Jom Luiten Walter van Dijk Seth Brussaard Walter Knulst (TUDelft) Fred Kiewiet Eddy.
1 CTF3 CLEX day July 2006 CLEX day 2006 Introduction G.Geschonke CERN.
S. Bettoni, R. Corsini, A. Vivoli (CERN) CLIC drive beam injector design.
Proton-Driven Plasma Wakefield Acceleration CERN Project Structure Edda Gschwendtner, CERN Lisbon Meeting, 22 June 2012Edda Gschwendtner, CERN2.
Awake electron beam requirements ParameterBaseline Phase 2Range to check Beam Energy16 MeV MeV Energy spread (  ) 0.5 %< 0.5 % ? Bunch Length (
First Electrons at the Fermilab superconducting test accelerator Elvin Harms Asian Linear Collider Workshop 2015, Tsukuba 24 April 2015.
Development of High Current Bunched Magnetized Electron DC Photogun MEIC Collaboration Meeting Fall 2015 October 5 – 7, 2015 Riad Suleiman and Matt Poelker.
Construction, Commissioning, and Operation of Injector Test Facility (ITF) for the PAL-XFEL November 12, 2013 S. J. Park, J. H. Hong, C. K. Min, I. Y.
AWAKE: A Proton-Driven Plasma Wakefield Acceleration Experiment at CERN C. Bracco on behalf of the AWAKE collaboration C. Bracco - ICHEP2014.
European Advanced Accelerator Concepts Workshop, Elba, September 14 th -18 th, 2015Steffen Döbert, BE-RF Electron accelerator for the AWAKE experiment.
CLIC DB injector facility, photo-injector option studies LCWS, Granada, September 26 th -30 th,2011Steffen Döbert, BE-RF  CLIC DB injector  Thermionic.
Linac4 BCC 14/10/2010 Linac4 Measurement and Dump Lines BCC on the Linac4 Transfer Line Status.
PAL-XFEL Commissioning Plan ver. 1.1, August 2015 PAL-XFEL Beam Dynamics Group.
B. Marchetti R. Assmann, U. Dorda, J. Grebenyuk, Y. Nie, J. Zhu Acknowledgements: C. Behrens, R. Brinkmann, K. Flöttmann, M. Hüning,
Status and plans of drive beam components and tests Status and plans of drive beam components and tests CLIC review, March 1 st, 2016Steffen Döbert, BE-RF.
Development of High Brightness Electron Photoinjectors at ASTeC B.L. Militsyn Accelerator Science and Technology Centre Science & Technology Facility Council,
Present and possible future schemes for hadron therapy linacs Alberto Degiovanni for the ADAM team HG2017 Workshop , Valencia.
Phil Oxford , june 18 Photoinjector at.
Linac beam dynamics Linac dynamics : C. Bruni, S. Chancé, L. Garolfi,
EAAC, Isola d’Elba, September 2017, WG1
PHIL: A TEST BEAMLINE AT LAL Specifications of PHIL
Abstract EuSPARC and EuPRAXIA projects
CLEX Building Layout, Conventional Facilities, TL2, TL2’,
Sara Thorin, MAX IV Laboratory
CLEX* Status and Plans CTF3 complex CLEX
Status of the CLIC main beam injectors
Ideas for medium and long term facility upgrade Roberto Corsini for the CLIC Accelerator Collaboration.
Operation of the High-Charge PHIN RF Photoinjector with Cs3Sb Cathodes
AWAKE proposals for BE/BI
Have a chance to operate your own beam at CERN
WP11: electron and proton beam testing
9/10/2018 News on operation Second commissioning phase from 30th of March to 9th of April Aline Curtoni, Claire Simon, Franck Peauger, Wilfrid Farabolini.
LCLS Gun Commissioning Status & Plans David H
Electron Source Configuration
Status of the CLIC Injector studies
Injector: What is needed to improve the beam quality?
Advanced Research Electron Accelerator Laboratory
ATF project meeting, Feb KEK, Junji Urakawa Contents :
Compact linear accelerator FLUTE: status update
INJECTOR (WBS 1.2.1) Jym Clendenin, SLAC April 23, 2002
Linac LLP Outline LINAC Long Lead Procurements
CLIC Feasibility Demonstration at CTF3
Injector Experimental Results John Schmerge, SSRL/SLAC April 24, 2002
LCLS Injector/Diagnostics David H. Dowell, SLAC April 24, 2002
J. Seeman Perugia Super-B Meeting June 2009
Presentation transcript:

AWAKE electron source New Electron Source WP at CERN Base Line Scenario Simulations Diagnostics Questions and Issues Conclusions AWAKE workshop, CERN, April 9th-11th, 2014

Layout of AWAKE Experiment CI SAC meeting 2013 Layout of AWAKE Experiment

Layout of Electron source CI SAC meeting 2013 Layout of Electron source To be developed in the future

Base line scenario Base line Use PHIN gun and equipment (convert to copper cathode ?) Klystron and Modulator from CTF3 Get booster from Cockcroft/Lancaster collaboration (specs from CERN) ? Additional equipment needed (solenoids, vacuum, wave guides, girders) Diagnostics, PHIN, CERN, INFN (to be defined) Beam dynamics simulations, CERN ,Cockcroft ? Integrated test in CTF2 in 2016, external help welcome Installation and commissioning into CNGS area in 2017, external help welcome Alternative, upgrade Look for alternative gun, Califes, Cockcroft/Lancaster, INFN ? (goal will be ultimate beam performance, tiny emittance, ultra short bunches) Evaluate performance, impact and cost

Work package responsibilities Tasks Responsible RF power CERN, Gerry McMonagle GUN CERN, Steffen, Eric Chevallay Booster STFC, Graham Burt ? Laser CERN, Valentin Fedosseev Instrumentation CERN, Lars Jensen Mechanical design CERN, Nicolas Chritin Magnets CERN, Jeremie Bauche Vacuum CERN, Jan Hansen Controls CERN, Marine Gourber-Pace Integration CERN, Fred, Ans Pardons Commissioning CERN, Steffen, Chiara Simulations CERN,STFC, Steffen, Oznur Mete ? Interlocks, Safety CERN, Rui Nunes Be aware this list is certainly incomplete and preliminary

AWAKE – INJECTOR MODULE Quadrupole Magnet Horizontal and Vertical Corrector Magnet YAG Slit YAG Booster Linac 1m long RF Gun Beam Direction Synthetic Granite Girder Ion Pump ? Support Pedestal Ion Pump Proposal by STFC Daresbury

AWAKE electron source schematic Klystron Incident, Reflected Power and phase A,f Spectrometer Laser +Diagnostics Incident, Reflected, transmitted Power E, DE MTV Matching triplet FCT Emittance MS FC BPR BPR BPR RF GUN VPI MTV, Emittance Corrector Accelerator Length ~ 4 m

Awake electron beam requirements Parameter Phase 1 Phase 2 Beam Energy 13-16 MeV 20 MeV Energy spread (rms) 0.1 % Bunch Length ~ 4 ps < 1 ps Laser/Rf synchronization 1 ps 0.1 ps Free Repetition Rate 10 Hz Synchronized repetition rate 0.03 Hz Beam Focus Size < 250 mm Divergence < 3 mrad Normalized Emittance 2-5 mm mmrad 0.5 mm mrad Bunch Charge 0.2 nC 1 nC

Phin gun, 20 MV/m structure, 0.1 nC, 1 mm 3 ps laser Awake simulations Phin gun, 20 MV/m structure, 0.1 nC, 1 mm 3 ps laser

Phin gun, 20 MV/m structure, 0.2 nC, 1 mm laser Awake simulations Phin gun, 20 MV/m structure, 0.2 nC, 1 mm laser

Phin gun, 20 MV/m structure, 0.2 nC, 1 mm laser, Awake simulations Phin gun, 20 MV/m structure, 0.2 nC, 1 mm laser, 1 ps laser

Phin gun, 20 MV/m structure, 0.1 nC, 0.5 mm laser Awake simulations Phin gun, 20 MV/m structure, 0.1 nC, 0.5 mm laser

Awake simulations Phin gun, 20 MV/m structure, 0.1 nC, 0.25 mm laser Many variants are possible Clear laser and beam parameter specification are needed for the simulations Should define reference scenarios for the simulations

Booster structure Some rough numbers 1 m long constant gradient structure f= 2998.55 MHz Q ~ 15000 r/Q ~ 70 MW DV= 15 MV Tf= 280 ns, 2a ~ 2 cm Po = 11 MW PHIN gun needs about 10 MW for 85 MV/m Roughly 30 MW needed to power the injector (one klystron)

Define rough commissioning scenario, what do we measure where and how Beam instrumentation Instrument How many Resolution Precision BPMs 3 50 mm ? ? Phase monitor 1 ps ? Screen 20 mm ? Multi slit < mm mrad ? FCT pC ? Faraday Cup Spectrometer 10 keV ? Streak Camera < ps ? Laser diagnostics: laser power, position, virtual cathode, micro pulse length RF diagnostics: rf power signals, rf phase Define rough commissioning scenario, what do we measure where and how

Klystron Issues Transport: Study of transport and possibility to exchange klystron in situ has to be done, likely a local lifting device is needed Synchronisation: 3 GHz synchronized signal is needed as well as a number of timing triggers Safety: The modulator contains Oil together with high voltage, the waveguide may contain SF6 A risk assessment has to be done to determine fire protection measures !! Remote control: We usually have access to those klystron while running beam, likely need to improve the remote control capabilities

Questions A few question to trigger discussions: Timing: How is it organised, beam, controls, data acquisition Controls: Guidelines for the control system, hardware, FESA, data base Experiment data taking: which information we need synchronized, sampling rate (BPM’s protons, electrons, Laser, spectrometer )? Location of electronics for power supplies, diagnostics and data acquisition

Rough time line 2014 2015 2016 2017 Beam line design Booster design Infrastructure definition Rough Integration Detailed Component design and fabrication Detailed integration Infrastructure installation (Water, Power, Ethernet, klystron handling) Installation and commissioning In CTF2 (may be not all hardware) Infrastructure installation, electron source shielding, access system, racks Installation of source and commissioning in AWAKE Infrastructure and issues before installation: Water, power, Ethernet, klystron handling equipment, racks for electronics, electron source shielding, access system, laser beam line, alignment concept, commissioning concept, controls

Conclusions New CERN work package for the electron source in place Many open questions we have to address in the future Beam requirements for first phase likely possible with PHIN gun and booster Some useful equipment should be available from CTF3 Need detailed beam and laser specifications Requirements for second phase challenging to fulfil simultaneously A lot of work ahead, help is very welcome

End

Awake electron beam work package reflections Questions: Access scenario, where can we go during experiment Location of power supplies, electronics, data acquisition, vacuum equipment Location of klystron/modulator elements Transport of klystron/modulator items, crane for mounting klystron ? Safety requirements, restrictions Electron source housing, how does it look like Beam diagnostics, what has been done for the beam line yet, BPMs, correctors Control system, beam, vacuum Water, electricity availability Clarify collaborations, with UK, Frascati ? Define time constraints, milestones

Single plasma cell @side injection

2 plasma cells/on-axis injection

Phin gun, 20 MV/m structure, 0.01 nC, 0.5 mm laser Awake simulations Phin gun, 20 MV/m structure, 0.01 nC, 0.5 mm laser