Emerging Legal Issues Chuck Sensiba, Van Ness Feldman LLP Northwest Hydroelectric Association Annual Conference February 18, 2014.

Slides:



Advertisements
Similar presentations
Alaska Department of Natural Resources, DML&W Water Resources Section Putting It All Together Alaska Coastal Management Program Annual Conference April.
Advertisements

SW101 The NPDES Industrial Storm Water Program. What Does the Industrial Program Cover? F Storm Water Discharges Associated with Industrial Activity l.
Structuring and Implementing a Truly International ERO Kevin Kelly Director, Policy Analysis and Rulemaking Office of Markets, Tariffs and Rates Federal.
SAFETEA-LU Efficient Environmental Review Process (Section 6002) Kelly Dunlap.
PSC Update: Wind Energy Issues James W. Ellars, P.E. Chief Utilities Manager, Engineering Division Public Service Commission of West Virginia.
The Entergy facility is a boiling water reactor with a rated core thermal power level of 1912 MW, providing a gross electrical output of 620 MW. The facility.
NEPA Environmental Procedure Pam Truitt, Grants Management Consultant  September 4, 2014.
36 CFR 218.  Moves projects documented in an Environmental Assessment (EA)/Decision Notice (DN) or Environmental Impact Statement (EIS)/Record of Decision.
Agency Drafts Statement of Scope Governor Approves (2) No Agency Drafts: Special Report for rules impacting housing Fiscal Estimate.
LNG USA 2005 IQPC Houston, Texas November 9, 2005 Bruce F. Kiely Baker Botts L.L.P. Washington, D.C.
1 Licensing in the Energy Sector Georgian National Energy And Water Supply Regulation Commission Nugzar Beridze June 27 – July 3, 2008.
FOIA and NEPA Federal Highway Administration Environmental Conference June 2006.
Tidal Energy in Alaska Permitting Issues Michael Murphy Devine Tarbell & Associates.
Eric J. Tomasi – Project Manager Division of Gas – Environment & Engineering Office of Energy Projects Federal Energy Regulatory Commission Northeast Energy.
Proposed Rules under the FDA Food Safety Modernization Act
FERC & Hydrokinetic Projects Ocean Energy for New England Conference Hosted by the Marine Renewable Energy Center at the Advanced Technology and Manufacturing.
Drought and the Central Valley Project August 2014.
Lassen Lodge Hydroelectric Project Public Scoping Meetings November 5, 2014 (Sacramento and Red Bluff) State Water Resources Control Board Division of.
Environmental Assessment in Newfoundland & Labrador Environmental Assessment in Federations: Current Dynamics and Emerging Issues Conference Current Dynamics.
NRCS Watershed Rehabilitation
Final Rule Setting Federal Standards for Conducting All Appropriate Inquiries U.S. EPA Brownfields Program.
ALASKA NATURAL GAS SYMPOSIUM Regulatory Update J. Mark Robinson, Director Office of Energy Projects Federal Energy Regulatory Commission December 2, 2004.
Washington State Energy Facility Site Evaluation Council Region 10 Regional Response Team Northwest Area Committee Seattle, WA February 12, 2014 EFSEC.
Wyoming Infrastructure Authority Developing Electric Infrastructure for the Future of the West Energy Gateway Update Presented by Darrell T. Gerrard Vice.
Future of the Columbia River Treaty A British Columbia Perspective 2014 PNWA Summer Conference Coeur d’Alene June 23, 2014 Kathy Eichenberger B.C. Ministry.
State of Oregon New Hydroelectric Projects Mary Grainey October 2008 Oregon Water Resources Department.
Water Supply Planning Initiative State Water Commission November 22, 2004.
2  Large Service Area ◦ Copper Basin and Valdez  Electrically isolated from neighboring utilities  50% Hydro / 50% Fossil Fuels  Current Rates ◦ 18¢/kWh.
Citizens Advisory Committee to the Chesapeake Executive Council November 29, 2012.
Kathy Alexander, Ph.D. Technical Specialist Water Availability Division Texas Commission on Environmental Quality.
FERC Relicensing of the Toledo Bend Project – Hydroelectric Power Generation Drought Hydroelectric vs. Water Supply Sabine River Authority Issues.
Jason King, P.E. State Engineer WSWC/NARF Symposium on the Settlement of Indian Reserved Water Right Claims August 25-27, 2015 Pyramid Lake Paiute Tribe’s.
B r a z o s R i v e r A u t h o r i t y FERC Encroachments.
INTRODUCTION TO SECTION 4(f) Presented by Ian Chidister Environmental Program Manager FHWA – Wisconsin Division December 4, 2013.
U N I T E D S T A T E S D E P A R T M E N T O F C O M M E R C E N A T I O N A L O C E A N I C A N D A T M O S P H E R I C A D M I N I S T R A T I O N State.
“FERC-LITE,” WHOLESALE REFUND AUTHORITY, AND RELATED PROVISIONS NOVEMBER 10, 2005 ROBERT R. NORDHAUS VAN NESS FELDMAN WASHINGTON, DC (202)
GKRSE law offices of GKRSE 1 Federal Regulatory Issues Affecting the Development of Hydro in the Northeast Nancy J. Skancke Law Offices of GKRSE Washington,
1 CEQA and CEQA-Plus Presented by Cookie Hirn, Lisa Lee, and Michelle Jones Regional Programs Unit July 2008.
2014/2024 Review Columbia River Treaty Bonneville Power Administration - U.S. Army Corps of Engineers Briefing for the Central Asian Delegation January.
Kilarc-Cow Creek Hydroelectric Project Decommissioning FERC Project No. 606 Technical Meeting May 16, 2007, 1-4 pm Red Lion Redding, CA.
1 | Program Name or Ancillary Texteere.energy.gov Percheron Power, LLC’s Proof of Power Project on Potholes East Canal (POP ‐ PEC) 2011 Water Power project.
The Energy Policy Act of 2005 and Its Revisions to PURPA November 11, 2005 Grace D. Soderberg Assistant General Counsel National Association of Regulatory.
Amendments to the Work Permit Rules: Problematic Issues Alex Nisengolts 28 April 2011.
Endangered Species Act 2005 Legislative Action. House of Representatives  On Sept. 29, 2005 the House passed H.R. 3824: Threatened and Endangered Species.
BUILDING STRONG SM Northwestern Division Presented by Lori Rux Chief, Program Support Division June 11, 2009 BPA Direct Funding for Corps Hydropower Projects.
February 18, 2014 Federal Energy Regulatory Commission 1.
Kilarc-Cow Creek Hydroelectric Project Decommissioning FERC Project No. 606 Shasta County Board of Supervisors March 4, 2008.
Environmental Assessment in British Columbia Forum of Federations Conference September 14, 2009.
PPP Legal & Regulatory Framework. PPP Policy In July 2008 GOK approved the PPP policy directive through which: PPPs are identified as a method for investing.
Investigational Devices and Humanitarian Use Devices June 2007.
Columbia River Treaty Past, Present and Future Status of Columbia River Treaty Discussions: a BC government perspective October 7, 2015 Osoyoos, BC Kathy.
Overview of Proposed Alaska National Wildlife Refuges Regulatory Changes U.S. Fish and Wildlife Service.
Non-Federal Development at Reclamation Facilities.
How Tribes Can Influence State Title V Permits Virgil Frazier Southern Ute Indian Tribe Virgil Frazier Southern Ute Indian Tribe.
Water Quality Certification for hydropower licensing in Wisconsin.
Rulemaking by APHIS. What is a rule and when must APHIS conduct rulemaking? Under U.S. law, a rule is any requirement of general applicability and future.
Regional Planning CCRPC Board Training March 21, 2012.
S.B Municipality Fees. S.B – Environment Budget Reconciliation Bill Enacted during the 2011 regular legislative session and becomes effective.
Chapter 19 Environmental Law Copyright © 2015 McGraw-Hill Education. All rights reserved. No reproduction or distribution without the prior written consent.
Federal Energy Regulatory Commission 1 Overview of the Federal Energy Regulatory Commission (FERC) Roland W. Wentworth Office of Markets, Tariffs and Rates.
November Final Rule Setting Federal Standards for All Appropriate Inquiries Patricia Overmeyer EPA Office of Brownfield Cleanup and Redevelopment.
Water Quality/Stormwater Seminar September House Bill 2031 Requires TCEQ to adopt an expedited permitting process for discharge permits for treated.
Thursday, October 8, Kevin D. Johnson Stoel Rives LLP Thursday, October 8, 2015 Environmental and Regulatory.
Ontario’s Drainage Legislation
HB 328 SITING OF SOLID WASTE MANAGEMNT FACILITIES
SSA Adverse Decisions and Administrative Finality
Michigan Dept. of Environmental Quality Water Resources Division
OFFICE OF THE CITY CLERK FEBRUARY 15, 2018 ADOPTION OF RESOLUTIONS CALLING FOR A SPECIAL MUNICIPAL ELECTION TO BE HELD IN THE CITY OF PASADENA AND THE.
National Association of State Conservation Agencies
Session Law Water Quality Permitting for Composters
Presentation transcript:

Emerging Legal Issues Chuck Sensiba, Van Ness Feldman LLP Northwest Hydroelectric Association Annual Conference February 18, 2014

Key Cases and Orders Simmons v. Sabine River Authority State of Louisiana, 732 F.3d 469 (5th Cir. 2013) FFP Qualified Hydro 14, LLC, 145 FERC ¶ 61,255 (2013) Power Site Reservation Fees Group, 142 FERC ¶ 61,196 (2013)

Simmons v. Sabine River Authority State of Louisiana, 732 F.3d 469 ◘In October 2013, the Fifth Circuit rules that state- law tort claims that seek to alter operations of a FERC-licensed hydro project are preempted by the Federal Power Act (FPA).

Simmons v. Sabine River Authority State of Louisiana, 732 F.3d 469 ◘Despite FPA § 10(c), which preserves state law claims for damages inflicted on the property of others, the Fifth Circuit held that state tort laws impeding FERC’s operational control over dam operations are preempted. Prior FERC proceeding FERC findings of fact ◘Plaintiffs filed a Petition for a Writ of Certiorari with the U.S. Supreme Court on January 7, 2014.

FFP Qualified Hydro 14, LLC, 145 FERC ¶ 61,255 (2013) ◘FERC holds that municipal preference under FPA § 7(a) applies only to hydropower projects located in the “vicinity” of the municipality. ◘Muni should receive preference to develop “nearby hydropower sites” but not in public interest to grant preference for project “far from the site of the municipality.” ◘Muni in case was located almost 400 miles from the project site – deemed to be outside of vicinity.

FFP Qualified Hydro 14, LLC, 145 FERC ¶ 61,255 (2013) ◘Order ends FERC’s existing practice of applying muni preference to any state or municipal application for preliminary permit or original license without regard to location of project. ◘Could significantly reduce the use of muni preference in future permitting and licensing decisions. ◘Rehearing is pending. Project Nos and

Power Site Reservation Fees Group, 142 FERC ¶ 61,196 (2013) ◘FERC holds that it will no longer assess annual charges for non-federal lands at hydropower projects that are subject to a federal power site reservation under FPA § 24. ◘Changes longstanding FERC policy dating to ◘Will result in significant reductions in federal land use annual charges for numerous projects, particularly in Alaska and other areas in the West.

Major Policy Initiatives HREA Implementation Columbia River Treaty Renewal

Implementation of Hydropower Regulatory Efficiency Act ◘On August 9, 2013, the President signed into law H.R. 267, the Hydropower Regulatory Efficiency Act of 2013 (HREA). ◘First energy law passed by Congress in more than 5 years. ◘Significant update in FERC’s regulation of small hydropower development.

Implementation of Hydropower Regulatory Efficiency Act ◘HREA provisions: 2-Year Pilot Licensing Process: Mandated FERC to investigate a 2-year licensing process for certain projects Qualifying Conduit Facilities: Created new class of 5 MW facilities that are excluded from FERC jurisdiction Extended Preliminary Permit Terms: Authorized FERC to extend by 2 years permit terms at its discretion Conduit Exemptions: Increased capacity limit (from 15 to 40 MW) for FERC conduit exemptions sought by non- municipalities Small Hydropower Exemptions: Increased the capacity limit (from 5 MW to 10 MW) for small hydro project exemptions

Implementation of Hydropower Regulatory Efficiency Act ◘Two-Year Licensing Process ◘Eligible projects must: (1) be located at a non-powered dam or be a closed-loop pump storage project; (2) cause little to no change to existing surface and groundwater flows and uses; and (3) be unlikely to adversely affect federally listed threatened and endangered species. ◘Additional Requirements for some projects: Located at or will use a federal dam – include a letter from the dam owner that the applicant’s plan of development is conceptually feasible Use any public park, recreation area, or wildlife refuge established under state or local law – include a letter from the managing entity indicating its approval of the site’s use for hydropower development Closed-loop pumped storage – not continuously connected to a naturally flowing water feature

Implementation of Hydropower Regulatory Efficiency Act ◘Two-Year Licensing Process ◘Requests to use the 2-year licensing process must be filed between February 5 – May 5, ◘Requests must include: An adequate consultation record, Pre-application document, Proposed study plan, Potential environmental impacts of the project, and Process plan and schedule. ◘Keys to Success: Solid project proposal Early outreach to Federal and State regulators Early outreach to FERC ◘FERC staff has signaled a willingness to work with developers after the May 5th deadline to develop an efficient process.

Implementation of Hydropower Regulatory Efficiency Act ◘Qualified Hydropower Conduit Facilities Qualifying Criteria  Must use only the hydroelectric potential of a non-federally owned conduit  Conduit must be operated for the distribution of water for agriculture, municipal, or industrial consumption and not primarily for the generation of electricity  Installed capacity does not exceed 5 MW  Facility is not licensed or exempted by FERC at time the law was enacted

Implementation of Hydropower Regulatory Efficiency Act ◘Qualified Hydropower Conduit Facilities Statistics to Date: 23 Notices of Intent to Construct Qualifying Conduit Facilities filed 19 approved 3 rejected (1 later re-filed and approved) 1 is pending FERC says average processing time is 63 days

Implementation of Hydropower Regulatory Efficiency Act ◘Preliminary Permit Extensions FERC may extend permits by two years (total of five years) Standard for extension (additional two years) is “good faith and with reasonable diligence”  No notice or opportunity for competing application, comment, or intervention  Issued very quickly  Must be filed “not less than 30 days prior to the termination of the permit.” 18 C.F.R. § 4.82 FERC standard for successive permit “good faith and due diligence”  Filed after expiration of existing permit  Notice and opportunity for intervention and competing applications

Implementation of Hydropower Regulatory Efficiency Act ◘Preliminary Permit Extensions Appears as though FERC has applied same standard for extensions as its long-standing standard for subsequent permits: Case 1: In denying an extension, FERC found that the information in progress reports was similar and doubts over economic viability of project. Case 2: In granting an extension, FERC noted that the permittee had conducted economic and financial analysis and filed its NOI, PAD, and request to use the TLP. It is unclear whether FERC will continue to issue successive permits, or whether it interprets the HREA to limit a permit term to no more than five years.

Columbia River Basin Treaty Renewal ◘1961 Treaty between United States and Canada. ◘Governs cooperative development and operation of Columbia River basin water resources for flood control and power. ◘Requires Canada to provide reservoir storage for flood control and generation, in exchange for one half of the downstream power benefits, delivered as energy and capacity, and currently valued between $ million annually.

Columbia River Basin Treaty Renewal ◘Either party can terminate Treaty on or after September 16, 2024, with minimum 10 years’ written notice (earliest notification date: September 16, 2014). ◘On December 13, 2013, the U.S. Entity delivered its final recommendation to the U.S. Dept. of State. ◘Recommended renegotiation of a “modernized” Treaty that addresses power production, flood risk management, and ecosystem-based function as the primary purposes of the Treaty. ◘Next steps: Department of State coordinates federal, interagency review under direction of National Security Council on behalf of President.

For more information: Chuck Sensiba