Www.egi.eu EGI-InSPIRE RI-261323 EGI-InSPIRE www.egi.eu EGI-InSPIRE RI-261323 Unified Middleware Distribution (UMD): SW provisioning to EGI Mario David.

Slides:



Advertisements
Similar presentations
EGI-InSPIRE RI EGI-InSPIRE EGI-InSPIRE RI The EGI Software Vulnerability Group and EMI Dr Linda Cornwall, STFC, Rutherford.
Advertisements

LCG Milestones for Deployment, Fabric, & Grid Technology Ian Bird LCG Deployment Area Manager PEB 3-Dec-2002.
EGI: A European Distributed Computing Infrastructure Steven Newhouse Interim EGI.eu Director.
EGEE is a project funded by the European Union under contract IST JRA1 Testing Activity: Status and Plans Leanne Guy EGEE Middleware Testing.
EGI-InSPIRE RI EGI-InSPIRE EGI-InSPIRE RI Future support of EGI services Tiziana Ferrari/EGI.eu Future support of EGI.
EMI INFSO-RI EMI Quality Assurance Processes (PS ) Alberto Aimar (CERN) CERN IT-GT-SL Section Leader EMI SA2 QA Activity Leader.
EGI: SA1 Operations John Gordon EGEE09 Barcelona September 2009.
EGI-InSPIRE RI EGI-InSPIRE EGI-InSPIRE RI EG recent developments T. Ferrari/EGI.eu ADC Weekly Meeting 15/05/
EGI-InSPIRE Steven Newhouse Interim EGI.eu Director EGI-InSPIRE Project Director.
EMI INFSO-RI SA2 - Quality Assurance Alberto Aimar (CERN) SA2 Leader EMI First EC Review 22 June 2011, Brussels.
EGI-InSPIRE RI EGI-InSPIRE EGI-InSPIRE RI SA2 services evolution (after the end of EGI-InSPIRE) Peter Solagna, Michel.
CERN – Roberta Faggian Marque, Jan Fiete Grosse-Oetringhaus GRACE General Meeting, September 2004, Brussels 1 D6.1 Integration with the European DataGrid.
EGEE-III INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks Steven Newhouse EGEE’s plans for transition.
European Middleware Initiative (EMI) – Release Process Doina Cristina Aiftimiei (INFN) EGI Technical Forum, Amsterdam 17. Sept.2010.
EGI-InSPIRE RI EGI-InSPIRE EGI-InSPIRE RI EGI Report Mario Reale NGI IT / GARR HEPiX f2f meeting.
RI EGI-InSPIRE RI EGI Future activities Peter Solagna – EGI.eu.
EGEE-III INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks SA1: Grid Operations Maite Barroso (CERN)
EGI-InSPIRE RI EGI-InSPIRE EGI-InSPIRE RI (Present and) Future of the EGI Services for WLCG Peter Solagna – EGI.eu.
EMI INFSO-RI Guidelines and SQA Process Maria Alandes Pradillo (CERN) SA2.2 Task Leader.
EMI INFSO-RI SA1 – Maintenance and Support Francesco Giacomini (INFN) SA1 Leader 1 st EMI Periodic Review Brussels, 22 June 2011.
Storage Accounting John Gordon, STFC GDB March 2013.
EGEE-III INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks EGI Operations Tiziana Ferrari EGEE User.
EMI INFSO-RI SA1 Session Report Francesco Giacomini (INFN) EMI Kick-off Meeting CERN, May 2010.
European Middleware Initiative (EMI) The Software Engineering Model Alberto Di Meglio (CERN) Interim Project Director.
EGI-InSPIRE RI EGI-InSPIRE EGI-InSPIRE RI EGI and MeDIA Steven Newhouse EGI.eu MeDIA - April
SA2.6 Task: EMI Testbeds Danilo Dongiovanni INFN-CNAF.
AEGIS Academic and Educational Grid Initiative of Serbia Antun Balaz (NGI_AEGIS Technical Manager) Dusan Vudragovic (NGI_AEGIS Deputy.
EGI-InSPIRE RI EGI-InSPIRE EGI-InSPIRE RI SA2 – Software Provisioning Michel Drescher Technical Manager EGI.eu SA2.
EGI-InSPIRE RI EGI-InSPIRE EGI-InSPIRE RI Supporting Distributed Computing Infrastructures Torsten Antoni, KIT
RI EGI-InSPIRE RI UMD 2 Decommissioning Status Cristina Aiftimiei EGI.eu.
EMI INFSO-RI SA1 – Maintenance and Support Francesco Giacomini (INFN) EMI First EC Review Brussels, 22 June 2011.
EGI-InSPIRE RI EGI-InSPIRE EGI-InSPIRE RI Requirements Status EGI.eu UCB
EGI-InSPIRE RI EGI-InSPIRE EGI-InSPIRE RI Accounting Requirements Stuart Pullinger STFC 09/04/2013 EGI CF – Accounting.
EGI-InSPIRE RI EGI-InSPIRE EGI-InSPIRE RI WP5 Review Michel Drescher EGI.eu SA2 – Michel Drescher - EGI-InSPIRE EC.
Ian Bird LCG Project Leader Status of EGEE  EGI transition WLCG LHCC Referees’ meeting 21 st September 2009.
EGI-InSPIRE RI EGI-InSPIRE EGI-InSPIRE RI WP5 Review Michel Drescher EGI.eu SA2 – Michel Drescher - EGI-InSPIRE EC.
EGI-InSPIRE RI EGI-InSPIRE EGI-InSPIRE RI UMD Roadmap Steven Newhouse 14/09/2010.
EMI INFSO-RI SA2: Quality Assurance Status Report Alberto Aimar(SA2) SA2 Leader EMI First EC Review 22 June 2011, Brussels.
EMI INFSO-RI Testbed for project continuous Integration Danilo Dongiovanni (INFN-CNAF) -SA2.6 Task Leader Jozef Cernak(UPJŠ, Kosice, Slovakia)
EGI-InSPIRE RI EGI-InSPIRE EGI-InSPIRE RI Funding Global Tasks.
EGI Process Assessment and Improvement Plan – EGI core services – Tiziana Ferrari FedSM project 1EGI Process Assessment and Improvement Plan (Core Services)
EGI-InSPIRE Project Overview1 EGI-InSPIRE Overview Activities and operations boards Tiziana Ferrari, EGI.eu Operations Unit Tiziana.Ferrari at egi.eu 1.
EGI-InSPIRE RI EGI-InSPIRE EGI-InSPIRE RI User Services Advisory Group Gergely Sipos EGI.eu User Community Support.
EGI-InSPIRE RI EGI-InSPIRE EGI-InSPIRE RI Storage Accounting John Gordon, STFC OMB August 2013.
EGI-InSPIRE RI EGI-InSPIRE EGI-InSPIRE RI GGUS Report Generator Günter Grein, KIT Helmut Dres, KIT Torsten Antoni,
EGI-InSPIRE RI EGI-InSPIRE EGI-InSPIRE RI Accounting Requirements Stuart Pullinger STFC 09/04/2013 EGI CF – Accounting.
EMI is partially funded by the European Commission under Grant Agreement RI EMI Outlook and Open Source Activities Alberto DI MEGLIO, CERN Project.
EGI-InSPIRE RI EGI-InSPIRE EGI-InSPIRE RI Update on Service Availability Monitoring (SAM) Marian Babik, David Collados,
EGI-InSPIRE RI EGI-InSPIRE EGI-InSPIRE RI EGI Services for Distributed e-Infrastructure Access Tiziana Ferrari on behalf.
EGI-InSPIRE RI EGI-InSPIRE EGI-InSPIRE RI Regional tools use cases overview Peter Solagna – EGI.eu On behalf of the.
EGI-InSPIRE RI EGI-InSPIRE EGI-InSPIRE RI Evaluation of Liferay modules EGI-InSPIRE mini-project Gergely Sipos EGI.eu.
EGI-InSPIRE RI EGI-InSPIRE EGI-InSPIRE RI UMD Platform Documentation Álvaro Simón CESGA 02/12/2011 SA2 TF2011, Amsterdam1.
EGI-InSPIRE RI EGI-InSPIRE EGI-InSPIRE RI Usage and future support for the deployed software Survey results TCB April.
EGI-InSPIRE RI EGI-InSPIRE EGI-InSPIRE RI EGI Software Repository Progress Report Kostas Koumantaros et al, GRNET 7/3/2016.
EGI-InSPIRE RI EGI-InSPIRE EGI-InSPIRE RI EGI Release Process Michel Drescher, EGI Kostas Koumantaros, GRNET 7/5/2016.
WLCG Operations Coordination Andrea Sciabà IT/SDC GDB 11 th September 2013.
EGI-InSPIRE RI EGI-InSPIRE RI EGI-InSPIRE Software provisioning and HTC Solution Peter Solagna Senior Operations Manager.
EGI-InSPIRE RI EGI-InSPIRE EGI-InSPIRE RI EGI IPv6 Report for HEPiX CERN October 5, 2012 CERN 1
EGI-InSPIRE RI EGI-InSPIRE EGI-InSPIRE RI GGUS – the EGI Helpdesk Status and Plans T. Antoni Karlsruhe Institute of.
IGTF, WLCG, EGI and SHA-2 (and RFC proxies) David Kelsey (STFC-RAL and WLCG) TAGPMA meeting, Panama City Aug 2012.
EGI-InSPIRE RI EGI-InSPIRE EGI-InSPIRE RI EGI.eu Service Portfolio - EGI CF’13 - Apr 2013 EGI.eu Service Portfolio.
EGI-InSPIRE RI EGI-InSPIRE EGI-InSPIRE RI MPI VT report OMB Meeting 28 th February 2012.
SA2 Steven Newhouse EGI-InSPIRE (INFSO RI ).
EGI-InSPIRE RI EGI-InSPIRE EGI-InSPIRE RI Middleware-related EGI and WLCG activities.
EGI-InSPIRE RI EGI-InSPIRE EGI-InSPIRE RI SA1.2 Plans 2013 Security Operations David Kelsey (STFC) 26/02/2013 Operations.
EGI-InSPIRE RI EGI-InSPIRE EGI-InSPIRE RI Middleware updates Peter Solagna – EGI.eu OMB – 16/07/ /3/
TSA2.2 QC Change Management
gLite->EMI2/UMD2 transition
EGI UMD Storage Software Repository (Mostly former EMI Software)
EMI: dal Produttore al Consumatore
Presentation transcript:

EGI-InSPIRE RI EGI-InSPIRE EGI-InSPIRE RI Unified Middleware Distribution (UMD): SW provisioning to EGI Mario David EGI-TSA1.3 Workshop LCG France, November 2011, Lyon, France 1

EGI-InSPIRE RI Outline Introduction EGI tasks SW provisioning to EGI. Early Adopters UMD: releases, contents, upcoming Some metrics and statistics. Issues and comments: “Facts of Life” References Workshop LCG France, November 2011, Lyon, France 2

EGI-InSPIRE RI Introduction Workshop LCG France, November 2011, Lyon, France3

EGI-InSPIRE RI EGI tasks (SA2 and SA1) Workshop LCG France, November 2011, Lyon, France4 TSA2.2: Definition of UMD Quality Criteria Technology Unit (SA2) TSA2.3: Verification of Conformance Criteria TSA2.4: Provision of a Software Repository and Support Tools TSA2.5: Deployed Middleware Support Unit (DMSU) Operations Unit (SA1) TSA1.3: Service Deployment (Staged Rollout) TSA1.2 TSA1.4 TSA1.5 TSA1.6 TSA1.7 TSA1.8

EGI-InSPIRE RI SW Provisioning: High level view Workshop LCG France, November 2011, Lyon, France TSA2. 3 TSA1. 3 GGUS RT Repos Wiki JRA1 Technology Providers Infrastructure Users Applications UMD JRA1: Operational Tools IGTF: Trustanchors (CAs) JRA1: Operational Tools IGTF: Trustanchors (CAs) Software Provisioning SA1 TSA2.3: Verification of conformance criteria TSA1.3: Service Deployment (Staged Rollout) TSA2.3: Verification of conformance criteria TSA1.3: Service Deployment (Staged Rollout) SA1: Operations 5

EGI-InSPIRE RI SW Provisioning: Implementation 6Workshop LCG France, November 2011, Lyon, France One release  set of components Product: solution delivered by Technology Providers which offer the functionality for one or more capabilities as one single and indivisible unit. Product per Platform and Architecture  PPA Examples of products: CREAM-CE, DPM, LFC, etc.

EGI-InSPIRE RI SW Provisioning: Verification Workshop LCG France, November 2011, Lyon, France 7

EGI-InSPIRE RI SW Provisioning: Staged Rollout 8Workshop LCG France, November 2011, Lyon, France

EGI-InSPIRE RI SW Provisioning: Into UMD/production 9Workshop LCG France, November 2011, Lyon, France

EGI-InSPIRE RI WorkFlow: Detailed description I Workshop LCG France, November 2011, Lyon, France10

EGI-InSPIRE RI WorkFlow: Detailed description II Workshop LCG France, November 2011, Lyon, France11

EGI-InSPIRE RI Early Adopters EA teams: Site administrators that committed to do Staged Rollout tests of certain components. First to deploy/expose new versions of the middleware in production/heterogeneous environment. The deployment layout is always a final decision of the site managers and depends on the specificity of the service at the site. SW reaching this state is assumed to have production quality, and no disruption to the service is expected. – (Well not always true!!) Requested to report back about the overall process outcome Currently: 50 EA teams (sites)  ~80 people EA teams: Site administrators that committed to do Staged Rollout tests of certain components. First to deploy/expose new versions of the middleware in production/heterogeneous environment. The deployment layout is always a final decision of the site managers and depends on the specificity of the service at the site. SW reaching this state is assumed to have production quality, and no disruption to the service is expected. – (Well not always true!!) Requested to report back about the overall process outcome Currently: 50 EA teams (sites)  ~80 people Workshop LCG France, November 2011, Lyon, France12

EGI-InSPIRE RI Early Adopters: management portal 13Workshop LCG France, November 2011, Lyon, France

EGI-InSPIRE RI Early Adopters: SW components table 14Workshop LCG France, November 2011, Lyon, France

EGI-InSPIRE RI Products Table Workshop LCG France, November 2011, Lyon, France15 HYDRA: not yet in EMI AMGA: in verification All “1’s” and “2’s” need EAs

EGI-InSPIRE RI UMD releases Workshop LCG France, November 2011, Lyon, France16

EGI-InSPIRE RI Products in UMD (as of 1.3): From EMI 17 Workshop LCG France, November 2011, Lyon, France

EGI-InSPIRE RI Products in UMD (as of 1.3): From IGE 18Workshop LCG France, November 2011, Lyon, France

EGI-InSPIRE RI Candidates for next releases Workshop LCG France, November 2011, Lyon, France19 UMD1.4 (19 Dec. 2011) Now under verification or staged rollout UMD1.5 (30 Jan. 2012)

EGI-InSPIRE RI Metrics: # of Staged Rollout tests 20Workshop LCG France, November 2011, Lyon, France # of Staged Rollout tests per NGI and per Project Quarter: May 2010-Oct 2011 # of EAs doing the tests = 39 # of Staged Rollouts = 214

EGI-InSPIRE RI Metrics: # of SW components accepted, rejected… 21Workshop LCG France, November 2011, Lyon, France Number of products: Accepted, Rejected and Not tested in Staged Rollout. Includes: gLite 3.1 and 3.2, EMI1, IGE1, Ops tools (SAM/Nagios) and CAs # of Products accepted = 133 (most products more than 1 version) # of Products rejected = 14

EGI-InSPIRE RI Stats: EMI products in UMD # NGIs in GOCDB = 38 # of sites = 411 (yesterday in my topbdii) 22Workshop LCG France, November 2011, Lyon, France Active: #NGIs = 10 # of EAs = 23 # of Staged Rollouts = 105 # of Products = 60 (some products more than 1 version) # of Products rejected = 5

EGI-InSPIRE RI EMI products “Not” in UMD Workshop LCG France, November 2011, Lyon, France23

EGI-InSPIRE RI Experience from UMD SW provisioning 24Workshop LCG France, November 2011, Lyon, France

EGI-InSPIRE RI Issues and comments: “Facts of Life” I 25Workshop LCG France, November 2011, Lyon, France

EGI-InSPIRE RI Issues and comments: “Facts of Life” II Huge load: large number of EMI products to be verified and staged rollout: –1 st Major release. –Several updates followed: more than 1 version of a product in the SW provisioning almost in parallel or close in time. dCache is taken by sites from dcache.org: –Release in EMI/UMD has somewhat outdated versions. –2 sites did the staged rollout based on versions they had in the past or presently in production. ARC is taken by most sites from nordugrid.org. Similar reasons to dCache. Also, ARC sites deploy some variety of Linux flavours (not just SL5). 26Workshop LCG France, November 2011, Lyon, France

EGI-InSPIRE RI Issues and comments: “Facts of Life” III EMI release rate is every 3 weeks. UMD release rate around 1.5 month interval – planned to be “Quarterly” after update 1.5. –Except for urgent updates or security vulnerabilities. Verification and staged rollout have detected and open a quite large number of GGUS tickets (50+) –Some of those issues appeared only in the production environment (i.e. staged rollout) –Depending on the criticality/priority: GGUS tickets are closely scrutinized by both EMI and EGI and bound by Service Level Agreements between both parties. 27Workshop LCG France, November 2011, Lyon, France

EGI-InSPIRE RI Issues and comments: “Facts of Life” IV 28Workshop LCG France, November 2011, Lyon, France

EGI-InSPIRE RI Issues and comments: “Facts of Life” V A quotation from one of my previous presentations: “Need to be involved earlier (much earlier) in beta testing, so that any issues that are discovered can be solved before the actual certification in EMI, and thus make it the next round of updates”. –As far/much as possible the beta testing should be done in “almost” production instances. –(There is an EMI certification testbed that interested sites can participate, but this is a limited and controlled environment.) Recently some EA sites have been involved in close collaboration with EMI, in the testing of new versions of the MW, such as: –WMS. –StoRM. –CREAM (S)GE module. 29Workshop LCG France, November 2011, Lyon, France

EGI-InSPIRE RI References WIKI – – – EA portal – RT: – EGI/UMD repository: – EGI Milestones: –About the staged rollout –About the SW provisioning Workshop LCG France, November 2011, Lyon, France30 Questions ??