F O U R T H E D I T I O N Work Performance Measurement © The McGraw-Hill Companies, Inc., 2003 supplement 10 DAVIS AQUILANO CHASE PowerPoint Presentation.

Slides:



Advertisements
Similar presentations
QUALITY CONTROL TOOLS FOR PROCESS IMPROVEMENT
Advertisements

Copyright © 2003 Pearson Education, Inc. Slide 1 Computer Systems Organization & Architecture Chapters 8-12 John D. Carpinelli.
Process Measurement and Analysis
Inventory Systems for Dependent Demand
PowerPoint Presentation
Standard Costs and Variances
Chapter 1 The Study of Body Function Image PowerPoint
Copyright © 2011, Elsevier Inc. All rights reserved. Chapter 5 Author: Julia Richards and R. Scott Hawley.
1 Copyright © 2010, Elsevier Inc. All rights Reserved Fig 2.1 Chapter 2.
Chapter 1 Image Slides Copyright © The McGraw-Hill Companies, Inc. Permission required for reproduction or display.
© 2011, the Book Industry Study Group, Inc Book Industry Study Group Supporting an Industry in Transformation BISG Annual Meeting of Members September.
Business Transaction Management Software for Application Coordination 1 Business Processes and Coordination.
Describing Data: Measures of Dispersion
Jeopardy Q 1 Q 6 Q 11 Q 16 Q 21 Q 2 Q 7 Q 12 Q 17 Q 22 Q 3 Q 8 Q 13
Jeopardy Q 1 Q 6 Q 11 Q 16 Q 21 Q 2 Q 7 Q 12 Q 17 Q 22 Q 3 Q 8 Q 13
Title Subtitle.
0 - 0.
DIVIDING INTEGERS 1. IF THE SIGNS ARE THE SAME THE ANSWER IS POSITIVE 2. IF THE SIGNS ARE DIFFERENT THE ANSWER IS NEGATIVE.
ADDING INTEGERS 1. POS. + POS. = POS. 2. NEG. + NEG. = NEG. 3. POS. + NEG. OR NEG. + POS. SUBTRACT TAKE SIGN OF BIGGER ABSOLUTE VALUE.
Addition Facts
Year 6 mental test 5 second questions
ZMQS ZMQS
STATISTICAL INFERENCE ABOUT MEANS AND PROPORTIONS WITH TWO POPULATIONS
Slides prepared by Joe Rosagrata
Fundamentals of Controlling
Department of Engineering Management, Information and Systems
Secondary Data, Literature Reviews, and Hypotheses
(This presentation may be used for instructional purposes)
ABC Technology Project
Project Management 6e..
Where We Are Now Copyright © 2011 The McGraw-Hill Companies, All Rights Reserved.
© Charles van Marrewijk, An Introduction to Geographical Economics Brakman, Garretsen, and Van Marrewijk.
VOORBLAD.
3/2003 Rev 1 I.2.12 – slide 1 of 18 Part I Review of Fundamentals Module 2Basic Physics and Mathematics Used in Radiation Protection Session 12Statistics.
Target Costing If you cannot find the time to do it right, how will you find the time to do it over?
Squares and Square Root WALK. Solve each problem REVIEW:
© 2012 National Heart Foundation of Australia. Slide 2.
Chapter 5 Test Review Sections 5-1 through 5-4.
GG Consulting, LLC I-SUITE. Source: TEA SHARS Frequently asked questions 2.
Addition 1’s to 20.
25 seconds left…...
Week 1.
Statistical Inferences Based on Two Samples
Flexible Budgets and Performance Analysis
We will resume in: 25 Minutes.
Copyright © The McGraw-Hill Companies, Inc. Permission required for reproduction or display. Chemistry Seventh Edition Raymond Chang Chapter 7 PowerPoint.
PSSA Preparation.
Retail Organization and Human Resource Management
Experimental Design and Analysis of Variance
Retail Organization and Human Resource Management
Chapter 20 Personal Selling And Sales Promotion0
PowerPoint Presentation
McGraw-Hill©The McGraw-Hill Companies, Inc., 2001 Chapter 16 Integrated Services Digital Network (ISDN)
Copyright © 2010 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin Management Accounting: A Business Partner Chapter 16.
F O U R T H E D I T I O N Project Management © The McGraw-Hill Companies, Inc., 2003 supplement 3 DAVIS AQUILANO CHASE PowerPoint Presentation by Charlie.
PowerPoint presentation to accompany Operations Management, 6E (Heizer & Render) © 2001 by Prentice Hall, Inc., Upper Saddle River, N.J S10-1 Operations.
McGraw-Hill/Irwin Copyright © 2007 by The McGraw-Hill Companies, Inc. All rights reserved. 7 Design of Work Systems.
Maintenance Work Measurement
McGraw-Hill/Irwin Copyright © 2007 by The McGraw-Hill Companies, Inc. All rights reserved. 7 Design of Work Systems.
1 EI441 Work Analysis and Design Text book: Motion and Time Study by R.M. Barnes, 7 th ed. (1980). Topics: 1.Introduction, Productivity, Definition and.
Copyright 2006 John Wiley & Sons, Inc. Beni Asllani University of Tennessee at Chattanooga Operations Management - 5 th Edition Chapter 8 Supplement Roberta.
OPERATIONS MANAGEMENT INTEGRATING MANUFACTURING AND SERVICES FIFTH EDITION Mark M. Davis Janelle Heineke Copyright ©2005, The McGraw-Hill Companies, Inc.
7 Design of Work Systems.
Operations and Supply Chain Management, 8th Edition
Work Design and Measurement McGraw-Hill/Irwin Copyright © 2012 by The McGraw-Hill Companies, Inc. All rights reserved.
- For 6 th Semester Job Design, Production and Operations Standards, and Work Measurement.
ENG M 501 Production and Operations Management Chapter 6A Job Design and Work Measurement Lecture 04a: 27 January 2009 John Doucette Dept. of Mechanical.
Operations Management Work Measurement Supplement 10
Presentation transcript:

F O U R T H E D I T I O N Work Performance Measurement © The McGraw-Hill Companies, Inc., 2003 supplement 10 DAVIS AQUILANO CHASE PowerPoint Presentation by Charlie Cook

Fundamentals of Operations Management 4e© The McGraw-Hill Companies, Inc., 2003S10–2 Supplement Objectives Introduce the more common types of work methods that are practiced in the workplace. Understand the fundamental issues involved in developing work measurements. Identify the basic elements associated with conducting a time study. Determine how to design a work sampling study and apply it to an actual operation.

Fundamentals of Operations Management 4e© The McGraw-Hill Companies, Inc., 2003S10–3 Work Methods Studying the production system to: –Identify non-valued-added time delays, transport distances, process and processing time requirements –Simplify the entire operation by eliminating any step that does not add value to the product.

Fundamentals of Operations Management 4e© The McGraw-Hill Companies, Inc., 2003S10–4 Work Methods and Design Aids Exhibit S10.1

Fundamentals of Operations Management 4e© The McGraw-Hill Companies, Inc., 2003S10–5 Flow Diagram and Process Chart of an Office ProcedurePresent Method* Exhibit S10.2a Source: Ralph M. Barnes, Motion and Time Study, 8th ed. (New York: John Wiley & Sons, 1980), pp. 76–79. Reprinted by permission of John Wiley & Sons, Inc. *Requisition is written by supervisor, typed by secretary, approved by superintendent, and approved by purchasing agent; then order is prepared by a stenographer.

Fundamentals of Operations Management 4e© The McGraw-Hill Companies, Inc., 2003S10–6 Flow Diagram and Process Chart of an Office Procedure Present Method* Exhibit S10.2b Source: Ralph M. Barnes, Motion and Time Study, 8th ed. (New York: John Wiley & Sons, 1980), pp. 76–79. Reprinted by permission of John Wiley & Sons, Inc. *Requisition is written by supervisor, typed by secretary, approved by superintendent, and approved by purchasing agent; then order is prepared by a stenographer.

Fundamentals of Operations Management 4e© The McGraw-Hill Companies, Inc., 2003S10–7 Common Notation in Process Charting Exhibit S10.3

Fundamentals of Operations Management 4e© The McGraw-Hill Companies, Inc., 2003S10–8 Gilbreths Principles of Motion Economy Exhibit S10.4a Source: Frank C. Barnes, Principles of Motion Economy: Revisited, Reviewed, and Restored, Proceedings of the Southern Management Association Annual Meeting, Atlanta, GA, 1983, p. 298.

Fundamentals of Operations Management 4e© The McGraw-Hill Companies, Inc., 2003S10–9 Gilbreths Principles of Motion Economy (contd) Exhibit S10.4b Source: Frank C. Barnes, Principles of Motion Economy: Revisited, Reviewed, and Restored, Proceedings of the Southern Management Association Annual Meeting, Atlanta, GA, 1983, p. 298.

Fundamentals of Operations Management 4e© The McGraw-Hill Companies, Inc., 2003S10–10 Worker- Machine Chart for a Gourmet Coffee House Exhibit S10.5a

Fundamentals of Operations Management 4e© The McGraw-Hill Companies, Inc., 2003S10–11 Worker-Machine Chart for a Gourmet Coffee House (contd) Exhibit S10.5b The customer, the clerk, and the coffee grinder (machine) are involved in this operation. It required 1 minute and 10 seconds for the customer to purchase a pound of coffee in this particular store. During this time the customer spent 22 seconds, or 31% of the time giving the clerk his order. He was idle during the remaining 69% of the time. The clerk worked 49 seconds, or 30% of the time. The machine was in operation 21 seconds, or 30% of the time.

Fundamentals of Operations Management 4e© The McGraw-Hill Companies, Inc., 2003S10–12 Activity Chart of an Emergency Tracheotomy Exhibit S10.6 Source: Data taken from Harold E. Smalley and John Freeman, Hospital Industrial Engineering (New York: Reinhold, 1966), p. 490.

Fundamentals of Operations Management 4e© The McGraw-Hill Companies, Inc., 2003S10–13 Work Measurement –The methodology used for establishing time standards. Basic Industrial Engineering Methods –Time study –Elemental standard time data –Predetermined motion-time data –Work sampling

Fundamentals of Operations Management 4e© The McGraw-Hill Companies, Inc., 2003S10–14 Types of Work Measurement Applied to Different Tasks Exhibit S10.7

Fundamentals of Operations Management 4e© The McGraw-Hill Companies, Inc., 2003S10–15 Time Study –The determination, with the use of a stopwatch, of how long it takes to complete a task or set of tasks. –Normal time = Observed performance time per unit x Performance rating –Piece rate is the rate paid for work completed. –Break down tasks by: Defining each work element. Separating human work from machine work. Defining operator and machine delays separately.

Fundamentals of Operations Management 4e© The McGraw-Hill Companies, Inc., 2003S10–16 Elemental Standard-Time Data Time Standard –The established time for completing a job, used in determining labor costs associated with making a product. –Steps Breakdown the new job into its elements Match elements to the time for similar job-specific elements in the elemental table. Adjust elements for special characteristics of the new job. Add element times together and add delay and fatigue allowances.

Fundamentals of Operations Management 4e© The McGraw-Hill Companies, Inc., 2003S10–17 Predetermined Motion-Time Data Predetermined Motion-Time Tables –Create a time standard for a job or task based on standard times for basic motions (therbligs). –Can be applied to a wide-variety of tasks.

Fundamentals of Operations Management 4e© The McGraw-Hill Companies, Inc., 2003S10–18 Work Sampling –A statistical technique for estimating how workers allocate their time among various activities throughout a workday. –Issues involved: What level of statistical confidence is desired in the results? How many observations are necessary? When should the observations be made?

Fundamentals of Operations Management 4e© The McGraw-Hill Companies, Inc., 2003S10–19 Work Sampling (contd) Determining the Required Number of Samples: N =Number of observations to be made Z =Number of standard deviations associated with a given confidence level p =Estimated proportion of time that the activity being measured occurs E =Absolute error that is desired

Fundamentals of Operations Management 4e© The McGraw-Hill Companies, Inc., 2003S10–20 Work Sampling (contd) Steps in Conducting a Work Sampling Study: –Identify the activities for study. –Estimate the proportion of time of the activity of interest to the total time. –State the desired accuracy in the study results. –Determine the specific time when each observation is to be made. –If using an estimated time, recompute the required samples size at intervals during the study and adjust the number of observations.

Fundamentals of Operations Management 4e© The McGraw-Hill Companies, Inc., 2003S10–21 Assignment of Numbers to Corresponding Minutes Exhibit S10.8

Fundamentals of Operations Management 4e© The McGraw-Hill Companies, Inc., 2003S10–22 Determination of Observation Times Exhibit S10.9

Fundamentals of Operations Management 4e© The McGraw-Hill Companies, Inc., 2003S10–23 Observation Schedule Exhibit S10.10

Fundamentals of Operations Management 4e© The McGraw-Hill Companies, Inc., 2003S10–24 Financial Incentive Plans Basic Compensation Systems –Hourly pay –Straight salary –Piece rate –Commissions Individual or Small-Group Plans Organizational Plans –Profit sharing –Gainsharing