Rocky Mountain Power Sub Transmission Five Year Study Findings and Kick Off Attachment K Meeting September 10, 2015.

Slides:



Advertisements
Similar presentations
Southwest Rhode Island Transmission Supply Study Long Term Needs and Solutions.
Advertisements

1 Entergy Gulf States, Inc. (Louisiana) Proposed Transmission Reliability Projects Entergy Transmission Planning Summit New Orleans, LA July 8, 2004.
The Power Grid ELEC 403 The Citadel Mark McKinney.
Goshen Area Bus Reconfiguration
La Crosse 161 kV Capacitor Addition Northern MAPP Subregional Planning Group April 3, 2007 Daniel Kline.
2013 Summer Overview Jeffrey S McDonald Power System Operator CUEA San Diego, CA June 6, 2013.
1 Entergy Louisiana, Inc. (North) Proposed Transmission Reliability Projects Entergy Transmission Planning Summit New Orleans, LA July 8, 2004.
1 Local Area Planning Update to TRANSAC – December 16, 2014.
1 Pacific Gas & Electric Company MTS: Evolution of the Electric Distribution System Manho Yeung, Senior Director, System Planning and Reliability PG&E.
Twin Cities Minnesota Zone Meeting Xcel Energy October 27, 2004 St. Paul, MN.
1 1 Substation Asset Strategy Kevin Dasso, Senior Director Engineering and Operations IEEE/PES Annual Substations Committee Meeting April 7, 2008.
Midwest Energy, Inc. Transmission Planning and Expansion
IMPACTS OF LARGE DISTRIBUTED GENERATORS ON CENTERPOINT ENERGY’S DISTRIBUTION SYSTEM 1 Presented by Ed Briggs, P.E. Manager of Electric Distribution Planning.
1 Local Area Planning Update to TRANSAC – July 29, 2015 Mitigation Update, Uncertainty Scenarios, and Next Steps.
© 2000 PACIFICORP | PAGE 1 WYOMING WEST AREA STUDY DECEMBER 2013 Seongtae Kim/Jeremy Viula.
1 Green River Utah Area Transmission and Distribution System – January 16, 2009.
Xcel Energy Smaller Scale Transmission Projects Northern MAPP Subregional Planning Group April 3, 2007 Srinivas Vemuri, Jason Standing, and Daniel Kline.
5/17/2000Summer Preparedness /17/2000Summer Preparedness SRP SUMMER PREPAREDNESS 2000 Presented to the Arizona Corporation Commission May.
New Richmond Load Serving Study Northern MAPP Subregional Planning Group August 16, 2006 Daniel Kline.
1 Local Area Planning Update to TRANSAC – September 18, 2014.
Jan 13, 2012 RPG Meeting El Campo – Vanderbilt 69 kV Project – Status report Ehsan Ur Rehman Planning Engineer ERCOT.
1 Entergy Mississippi, Inc. Proposed Transmission Reliability Projects Entergy Transmission Planning Summit New Orleans, LA July 8, 2004.
Report on the NCTPC 2006 Collaborative Transmission Plan Mark Byrd, Manager – Transmission Planning Progress Energy Carolinas, Inc January 25, 2007.
Increasing Access to the Grid NIPPC September 8, 2005 Brian Silverstein VP, Operations and Planning Bonneville Power Administration.
JACKSBORO TO WEST DENTON 345-kV PROJECT Presentation to Technical Advisory Committee April 8, 2004 Transmission Services Operations.
1 The following are the planned transmission project at SCL for the next ten year. All the projects has no major impact to the bulk transmission system.
Long Term Study Task Force Update Transmission Study Practices and Methodologies April 5th,2011 LTS.
NASHVILLE ELECTRIC SERVICE | Association for Financial Professionals March 2012.
APPA RELIABILITY STANDARDS & COMPLIANCE SYMPOSIUM Case Study: City Utilities of Springfield, MO January 11, 2007.
1 Entergy Mississippi, Inc. Proposed Transmission Reliability Projects Transmission Planning Summit.
Lyndonville Electric Department Feasibility Analysis Review December 2,
Rocky Mountain Power Five Year Study Kick Off Meeting.
Rocky Mountain Power Five Year Study Findings and Kick Off Meeting December 2013.
Aug 17, 2012 RPG Meeting KEC & MEC – Load Addition Project – ERCOT Independent Review Ehsan Ur Rehman Planning Engineer ERCOT.
1 Local Area Planning Update to TRANSAC – Sept 16, 2015 Mitigation Update, Uncertainty Scenarios, VAR Margin Study.
1 Entergy Gulf States, Inc. (Louisiana) Proposed Transmission Reliability Projects Entergy Transmission Planning Summit New Orleans, LA July 10, 2003.
PUBLIC POWER UTILITIES IN IDAHO Presented to Legislative Generation Sub-Committee by Idaho Energy Authority (IDEA) and Idaho Consumer Owned Utilities Association.
Local Area Study Local Area Study Mitigation Plan Update and Uncertainty Scenarios
1 Entergy Gulf States Louisiana, L.L.C. Proposed Transmission Reliability Projects.
1 Entergy Louisiana, Inc. (South) & Entergy New Orleans, Inc. Proposed Transmission Reliability Projects Entergy Transmission Planning Summit New Orleans,
1 Entergy Louisiana, Inc. (South) Proposed Transmission Reliability Projects Entergy Transmission Planning Summit New Orleans, LA July 10, 2003.
Utility Engineers, PC.  Generation  Transmission  Distribution.
1 Entergy Gulf States, Inc. (Louisiana) Proposed Transmission Reliability Projects Entergy Transmission Planning Summit New Orleans, LA July 31, 2007.
1 1 1 Central Maine Power Local System Plan Presentation Planning Advisory Committee Meeting November 19, 2008.
Jeff Billo Manager, ERCOT Transmission Planning Kenedy to Nixon to Seguin Line Upgrade Project Regional Planning Group (RPG) Review; ERCOT Independent.
AEPSC Live Oak County Transmission Project – ERCOT Independent Review TAC September 24, 2015.
TRANSMISSION CONSTRAINTS KENNETH A. DONOHOO, P.E. Manager of System Planning, Technical Operations
Glades Electric Cooperative Infrastructure Miles of Line 2,213  Overhead Dist.2,180  UndergroundDist. 33  Transmission 87 16,402 meters Average 7.
Transmission Capital Project Updates. Transmission Expansion Plan Sigurd to Red Butte 345 kV line in-service May, 2015 Permitting activities continue.
© 2000 PACIFICORP | PAGE 1 SOUTHWEST UTAH AREA STUDY SEPTEMBER 2014 Nathan Wilson/Talmage Daley Need to review the LOADS before Friday.
© 2000 PACIFICORP | PAGE 1 –Main Transmission Sources  kV Transformers. Terminal, Mid Valley, 90 th South and Oquirrh –Generation: Gadsby (~350.
Jeff Billo Manager, Transmission Planning
Update on the North Carolina Transmission Planning Collaborative January 30, 2007 For the North Carolina Utilities Commission and the North Carolina Public.
1 Entergy Mississippi, Inc. Proposed Transmission Reliability Projects Entergy Transmission Planning Summit New Orleans, LA July 10, 2003.
ISO Confidential Overview of California’s Current Drought and its Effects on the Energy System Dede Subakti, P. E. Director, Operations Engineering Services.
2006 Reliability Study James Manning Bryan Guy May 12, 2006.
June 26, 2008 Technical Advisory Committee American Electric Power Service Corporation Presidio Area Reliability Improvements Project James Teixeira Manager,
LINE 69H REBUILD AND CONVERSION PROJECT ERCOT Regional Planning Group April 21,2016.
1 Entergy Arkansas, Inc. Proposed Transmission Projects Entergy Transmission Planning Summit New Orleans, LA July 31, 2007.
Resiliency and Reliability
Local Area Planning Update to TRANSAC – December 21, 2016
Local Area Planning Update to TRANSAC – September 15, 2016
Rocky Mountain Power Five Year Study Findings & Kick Off Meeting
Electric Utility Master Plan Update
Local Area Planning Update to TRANSAC – June 29, 2017
Local Transmission Planning Process: Local Transmission Plan Update Meeting December 15, 2016.
Pacific Power Seismic Preparedness Update
PacifiCorp Overview Choose from three different title slide designs by selecting “New Slide.” These slides are suitable for business and community presentations.
Montpelier & Powder River 5-year Studies
Presentation transcript:

Rocky Mountain Power Sub Transmission Five Year Study Findings and Kick Off Attachment K Meeting September 10, 2015

© 2000 PACIFICORP | PAGE 2 Rocky Mountain Power Area Transmission Planning Area Transmission Planning Manager: Mark Adams Area Transmission Engineers: Planning Engineers Bhavana Katyal Talmage Daley Jeremy Viula Nathan Wilson Studies Engineers Scott Murdock Nicole DeGiulio

© 2000 PACIFICORP | PAGE 3 Why Prepare the Studies? –FERC/WECC required –Provides a good round map for future –Provides justification for new system additions

© 2000 PACIFICORP | PAGE 4 Who is invited? –Any individual is welcome –City and Municipal officials –Generation producers –Large industrial users –Equipment producers

© 2000 PACIFICORP | PAGE 5 Third Party Contributions –Load and Forecast Projects –New Points of Delivery –System Power Flow Model –Anticipated Future System Upgrades  Including block load increases

© 2000 PACIFICORP | PAGE 6 Basic Understanding of the Study –Field Study  Document equipment  Verify system ratings and settings –Identify System Problems & Future Recommendations –Generate a Report  Brief Understanding of the Area  List Equipment ratings  Fault duties, operation schemes  Lists system “Problems and Future Recommendations”

© 2000 PACIFICORP | PAGE 7 Study Restrictions –CIPS  The reliability of the energy grid depends not only on physical assets, but cyber assets. The North American Electric Reliability Corporation (NERC) realized that, along with protecting the physical assets, Critical Cyber Assets also need to be protected to keep the energy grid secure. –Confidentiality

© 2000 PACIFICORP | PAGE 8 Study Areas for 2015 Findings Reports Goshen – Scott Murdock

© 2000 PACIFICORP | PAGE 9 GOSHEN AREA STUDY Bhavana Katyal / Scott Murdock/ Need to review the LOADS before Friday

© 2000 PACIFICORP | PAGE 10 Goshen STUDY The Goshen service area encompasses approximately 5600 square miles spanning portions of nine counties in East Idaho. The Rocky Mountain Power (RMP) portion of this area is serviced by 56 transmission and distribution substations

© 2000 PACIFICORP | PAGE 11 Goshen Study Map

© 2000 PACIFICORP | PAGE 12 Goshen STUDY –Rocky Mountain Power (RMP) –Bonneville Power Administration (BPA) –PacifiCorp Energy Supply Management (ESM) –PacifiCorp Transmission (PT) –Idaho Power Company (IPC) –Utah Associated Municipal Systems (UAMPS) Municipalities/REAs: –Idaho Falls City –Fall River, Lost River, Salmon River and Lower Valley Energy

© 2000 PACIFICORP | PAGE 13 Goshen Study –There are 10 transmission subs: Amps, Antelope, Big Grassy, Bonneville, Goshen, Rigby, Jefferson, St. Anthony, Scoville, and Sugarmill –Transmission voltages studied include 230, 161, 138, 69 and 46 kV. –There are 11 transmission line that go in/out of the area at voltage levels of 345, 230, 161 and 115 kV

© 2000 PACIFICORP | PAGE 14 Goshen STUDY

© 2000 PACIFICORP | PAGE 15 Goshen STUDY Transmission Lines in/out of the Goshen Area Line Name Line Voltage (kV) Line Configuration Ownership Line Conductor Size Line Length (Miles) Goshen - Kinport 345 LoopRMP ACSR41 Goshen - Three Mile KnollLoopIPC ACSR52.82 Antelope - Anaconda (Mill Creek) 230 Loop RMP/NorthWestern Energy ACSR200 Antelope - BradyIPC ACSR58 Antelope - Lost RiverRadialRMP/BPA ACSR31.42 Goshen - Blackfoot 161Loop IPC ACSR19 Goshen - DrummondBPA ACSR~60 Goshen - Fishcreek - GraceRMP HHCU57.22 Goshen - Jefferson - Big Grassy Anaconda (Mill Creek) IPC/NorthWestern Energy HHCU Goshen - Swan ValleyBPA ACSR47 Goshen - Palisades115LoopBPA ACSR51.71

© 2000 PACIFICORP | PAGE 16 Load Growth –Base System Loads  Summer 2014: 652 MW  Winter : 383 MW –Growth  Summer: 1.6%  Winter: 2.2% –Projected System Loads  Summer 2019: 716 MW  Winter : 443 MW

© 2000 PACIFICORP | PAGE 17 Goshen STUDY –System Improvements  10 items to maintain company standards  6 items of a risk management nature

© 2000 PACIFICORP | PAGE 18 Increase Capacity Remove regulators and Replace with a new 30 MVA kV LTC transformer System Improvements Sandune kV Substation Increase Capacity from 22.4 to 30 MVA 2015

© 2000 PACIFICORP | PAGE 19 –Improve Voltage Control at Arco System Improvements 2015

© 2000 PACIFICORP | PAGE System Improvements –Correct Clearance Issues (Jefferson to Big Grassy) –Increase Capacity (Goshen to Jefferson)

© 2000 PACIFICORP | PAGE 21 System Improvements Upgrade Belson regulators replace 416 kVA units with 509 kVA units 2017

© 2000 PACIFICORP | PAGE 22 System Improvements Increase capacity on Sand Creek Tap 2018

© 2000 PACIFICORP | PAGE 23 System Improvements 2018

© 2000 PACIFICORP | PAGE 24 System Improvements Mud Lake kV Substation Increase Regulator Capacity from 416 to 509 kVA 2019

© 2000 PACIFICORP | PAGE 25 System Improvements Upgrade Rexburg #2 regulators to 509 kVA 2019

© 2000 PACIFICORP | PAGE 26 System Improvements –Upgrade Ammon regulator to 509 kVA –Upgrade fuses to 175E 2019

© 2000 PACIFICORP | PAGE 27 Construction Schedule Summary Construction Schedule ~ Projects Required to Maintain Company Standards 2015 Construction - In service by end of this year 7-1Sandune Change out transformer. The existing unit has heating issues.this will also increase capacity $1,432, ArcoRemove damaged regulators: Install kVA regulators$350, Construction - In service before May 1 of this year 7-3 Jefferson-Big Grassy 161 kV line Correct clearance issues$918, Construction - In service before May 1 of this year 7-4 Goshen-Jefferson 161 kV line Rebuild 29.5 line miles with 795 ACSR conductor$15,968, BelsonReplace overloaded regulators with 509 kVA units$350, Construction - In service before May 1 of this year 7-6Sand Creek 69 kV lineIncrease capacity:Rebuild 3.2 miles with 795 ACSR$3,680, Sugar CityVoltage Improvement: Install 2 stage 24 Mvar capacitor$3,531, Construction - In service before May 1 of this year 7-8Mud Lake SubReplace overloaded regulators with 509 kVA units$350, Rexburg Bank #2Replace overloaded regulators with 509 kVA units$350, AmmonReplace overloaded regulators with 509 kVA units$350,000 Grand Total $27,279,000

© 2000 PACIFICORP | PAGE 28 Goshen STUDY