Replacing Perchlorate in the M115A2 & M116A1 Simulators

Slides:



Advertisements
Similar presentations
Roadmap for Sourcing Decision Review Board (DRB)
Advertisements

Integrating an EMS Framework into the Pollution Prevention Program at Tinker AFB 30th Environmental & Energy Symposium & Exhibition April 8, 2004 San Diego,
DLA's Aviation Supply & Demand Chain Manager Defense Supply Center Richmond Aviation Engineering Reliability and Sustainment Programs Defense Logistics.
Security Functional Management 2010 Worldwide Security Conference.
Distribution Statement A – Approved for Public Release CAPT JT Elder, USN Commanding Officer NSWC Crane Dr. Adam Razavian, SES Technical Director NSWC.
Getting Your EMS Started: Policy Statements EPA Regions 9 & 10 and The Federal Network for Sustainability.
Overview of Advanced Design White Paper Farrokh Najmabadi Virtual Laboratory for Technology Meeting June 23, 1998 OFES Headquarters, Germantown.
M I S S I O N The Army SBIR program is designed to provide small, high-tech businesses the opportunity to propose innovative research and development solutions.
ISO Environmental Management System (EMS)
Army Doctrine Publication (ADP) 3-37; and Army
Performance Metrics for EMS Self Assessment & Management Review 30 th Environmental and Energy Symposium & Exhibition April 5 – 8, 2004.
Our mission ead and execute environmental programs and provide expertise that enables Army training, operations, acquisition and sustainable military communities.
Environmental Impact Assessment (EIA): Overview
SECRET Green Procurement Office of Greening Government Operations May 4, 2006.
U.S. Army Materiel Command | Army Sustainment Command U.S. Army Sustainment Command FORSCOM CDR’s Conference DOL Transition Update 2 OCT 2012 COL Dan Reilly.
Guns and Ammunition Conference Low Cost Solutions for Modern Munitions
From Research Prototype to Production
Surveillance and Proof M7 Slide 1. Definitions  Service Life: The overall life span  Storage Life: The life in specified storage conditions (part of.
Presented by: Pechanga Environmental Department Designing and Managing a Recycling Program Source Reduction Strategies for Tribal Solid Waste Programs.
APG Transformation 28 September 2007 U.S. Army Research, Development and Engineering Command Mr. David Shaffer Deputy to the Commanding General.
A N N I S T O N A R M Y D E P O T Environmental Management System Implementation at Anniston Army Depot April 8, 2004.
Using ISO and EDYS as a Framework for Creating a Sustainable Range Management System 30th Environmental & Energy Symposium & Exhibition April 5 -
DEPARTMENT OF THE NAVY THE NAVY ASN(RD&A) Acquisition and Business Management Recycled Paper SECTION 3.3 Acquisition Strategy Becomes more definitive as.
ESTCP Funding Opportunities January 15, 2009 Dr. Jeffrey Marqusee Director, ESTCP.
Hard Chrome Alternatives Team Joint Group on Pollution Prevention Propulsion Environmental Working Group PROGRAM REVIEW MEETING 1-2 April 2003 San Diego,
Phoenix Convention Center Phoenix, Arizona Overview of the ESTCP Energy & Water Program Technology Track Overview of Federal Technology Demonstration Programs.
Assistant Secretary of the Army (Installations and Environment) Army Munitions Response Topics Environmental Affairs Committee Society of Military Engineers.
1 13 Feb 2004 Army Performance Management and Integration Programs & Strategy Directorate (SAFM-CE) New Horizons in Costing and Performance.
Configuration Management Non Government Std: EIA Standard-649 “A management process for establishing and maintaining consistency of a product’s performance,
From Policies to Programs to Practices Establishing the Green Infrastructure Eric Friedman Director of State Sustainability Mass. Executive Office of Env.
1 This archive has the corrected slides. Audio for this archive references these slides. SERDP Funding Opportunities Dr. Jeffrey Marqusee SERDP Executive.
Management of Change ► The health, safety, security, environmental, technical and other impacts of temporary and permanent changes are formally assessed,
Brownfields: Real Property, the expansion or redevelopment, or reuse of which may be complicated by the presence or potential presence of contamination.
SERDP- ESTCP- ITRC A PARTNERSHIP Dr. Jeffrey Marqusee ESTCP, Director SERDP, Technical Director.
Non-Metallic Training Hand Grenade (Environmentally Friendly) (Model number: M69G) IT&T 6619 Ivy Hill Dr.., McLean, VA *
SERDP Funding Opportunities Dr. Jeffrey Marqusee SERDP Executive Director.
U.S. ARMY 1 Sustainable Painting Operations for the Total Army Mr. Patrick Taylor Dr. Daniel Verdonik Hughes Associates, Inc. Presented at Joint Services.
KINETIC INITIATED CORE MUNITIONS (KICM™) 0.50 Caliber
Area I Burn Pit Santa Susana Field Laboratory RCRA Facility Investigation Work Plan February 19, 2008 Laura Rainey, P.G. Senior Engineering Geologist California.
I n t e g r i t y - S e r v i c e - E x c e l l e n c e Headquarters U.S. Air Force 1 AFCEE BAA Program – Funding Opportunities Adria Bodour, Ph.D. Technology.
Navy DLMS Transition Planning 9/10 March 2004 Brief for: DLMS Workshop Presented by: Matt Weden Navy Logistics & Readiness Functional Data Manager (FDM)
Earned Value Management Update Nancy L. Spruill Director, Acquisition Resources and Analysis Office of the Under Secretary of Defense (Acquisition, Technology.
Insensitive Munitions S&T Roadmap Robert Maline
24b - 1 NASA’s Goddard Space Flight Center LRO Safety Dave Bogart Code 302 August 16-17, 2005.
1 Program For Results Financing OP/BP 9.00 Agi Kiss WB Safeguards Training Workshop Almaty, December 2012.
DoD Comments to NRC Committee on Improvements to EPA Risk Analysis Yvonne P. Walker, MS, MSE, CIH Director, Environmental Programs Navy Environmental Health.
1 Presented By: COL (P) Paul S. Izzo Program Executive Officer Ammunition Presented By: COL (P) Paul S. Izzo Program Executive Officer Ammunition Presented.
Follow-up On DOTC Discussion From October 2008 ICAP February 3 rd, Munitions Executive Summit - ICAP.
Unregulated and Emerging Contaminants JSEM August 2004.
I n t e g r i t y - S e r v i c e - E x c e l l e n c e Headquarters U.S. Air Force Integrating Air Force Environmental Programs into Core Business Practices.
Adem.alabama.gov Alabama Tier II Update Jimbo Carlson Chief, Facilities Engineering Section Governmental Hazardous Waste Branch Land Division.
SERDP Funding Opportunities Dr. Jeffrey Marqusee SERDP Executive Director 1.
I n t e g r i t y - S e r v i c e - E x c e l l e n c e Headquarters U.S. Air Force The Air Force Military Munitions Response Program For: Mr. William.
React To Unexploded Ordnance Hazards
U.S. Army Research, Development and Engineering Command UNCLASSIFIED Environmental Acquisition & Logistics Sustainment Program (EALSP) 3 June 2008 Presented.
Millennium Engineering and Integration Company A NEW DOCUMENTATION PROCESS TO STREAMLINE RANGE SAFETY PROCEDURES 0 O. “Rusty” Powell, Allan Smith, Jeff.
Principal Investigator ESTCP Selection Meeting
DOD P2 WATERSHED ADVISORY BOARD
DoD Template for Application of TLCSM and PBL
CAD/PAD Ordnance Assessment (OA) & Surveillance
CAD/PAD Development Process
U.S. Army RDE Command (Prov) - Supporting the Objective Force -
Principal Investigator ESTCP Selection Meeting
NASA Hypersonic Research
US Army CAD/PAD Program Overview CAD/PAD Industrial Summit 23 May 2017
SERDP and ESTCP Overview
Stephen P. Shelton, PhD, PE, DEE President, Dowbiggin Partners, LLC
Perchlorate Issues at the Massachusetts Military Reservation (MMR) and the Aberdeen Proving Ground (APG) 9th Annual Joint Services Environmental Management.
Principal Investigator ESTCP Selection Meeting
Principal Investigator ESTCP Selection Meeting
Presentation transcript:

Replacing Perchlorate in the M115A2 & M116A1 Simulators Presented at the 30th Environmental and Energy Symposium & Exhibition Ms. Maryalice Miller, RDECOM, Program Director Mr. William Ruppert, IV, P.E., Hughes Associates, Inc., Assistant Program Director April x, 2004

The Problem EPA: Perchlorate is a ‘contaminate of concern’ ClO4- in H20: Soluble, stable, and persistent Increased public concern about perchlorate Perchlorate detected at several Army facilities Suspected at many others. EPA and States: Proposed Standard – 1 - 4 ppb

The Military’s Response DOD Perchlorate Working Group Lead: COL Dan Rodgers, USAF Political/regulatory DOD Environmental RDTE: SERDP / ESTCP Perchlorate clean-up & replacement technologies Army: AERTA Ordnance Pollution Prevention Program Replacing perchlorate in munitions Hon. JP Woodley to California SWRCB, July 3, 2003: “The Army is taking steps to replace perchlorate in two key munitions that account for over 70% of usage in the Army”

Army AERTA P2 Ordnance Program Army Environmental Requirements and Technology Assessments (AERTA) Process DA-Level program 4 Working-Level Pillar Tech Teams (Compliance, Conservation, Restoration, P2) Requirements developed by “User” Community Technical pgm Developed by Technical Community, Approved by Tech Team AERTA: Sole Source of all Official Army Environmental Requirements Many Ordnance-Related Requirements P2 Ordnance Requirement addresses replacing perchlorates

Army AERTA P2 Ordnance Program Goals Ensuring that Army operational ranges and munitions production facilities remain available and sustainable in support of the transformation and Future forces. Pollution prevention in current processes & activities Leveraging OSD Advanced Energetics Program Army Munitions Mission Programs 7 Thrust Areas Current Non-Energetic Materials and Manufacturing Processes Energetic Materials/New Molecules Rocket/Missile Propellants Primers/Initiators/Fuses Gun Propellants Explosives Pyrotechnics

Perchlorate Usage In Munitions Perchlorate is a GREAT Oxidizer (ClO4-) Ammonium Perchlorate (AP) Rocket and Missile Propellant More sensitive than KP Potassium Perchlorate (KP) Simulator, delay, incendiary, illumination, gas generator, and tracer compositions “70%” of the Army’s Usage in 2001 was in two items: M115A2 Ground-Burst Projectile Simulator M116A1 Hand Grenade Simulator Projected to be ~36% of the usage from FY05-09 Usage and potential for contamination significant

Uncertainties: Usage vs. Purchases* Munition Type Planned Purchases Tons of Perchlorate Missiles 1,804 700 M115A2 1,551,657 64 M116A1 1,263,736 26 All Others 42,093,072 150 Non-Perchlorate Items 4,003,549,972 * Based on purchases planned in FY05-09 POM

Program Objectives Develop, demonstrate & implement perchlorate-free propellant & pyrotechnic compositions Must: Perform equally or better than current munitions Have no apparent change in function or size to the end user Present minimal/no impact on the environment or human health. A true “drop-in” replacement Initial focus on the low-hanging fruit: M115A2 Ground Burst Projectile Simulator (DODIC - L594) M116A1 Hand Grenade Simulator, (DODIC - L601) Long-term will address other high-usage, high-production items

What is a Simulator?

HARDWARE CONFIGURATION M115A2/M116 SYSTEM HARDWARE CONFIGURATION M115A2 Ground Burst Simulator Hand-thrown device Simulate battle noises and effects (shells in flight & ground explosions) during troop maneuvers (on land only) Produce whistling, flash, and loud report M116A1 Hand Grenade Simulator Hand-thrown device Simulate battle noises and effects during troop maneuvers (on land only) Produce flash and loud report

Project Scope Flash-bang compositions in both simulators will be replaced 40.0 grams per M115A2 20.0 grams per M116A1 Whistle composition in the M115A2 may be replaced Depends on performance of new composition Additional 2.0 grams per item

The Team OSD – policy guidelines HQDA – policy, funding, and implementation DASA(ESOH) ASA(ALT) (ESO) AMC / PMs – Integration, LCCA, Item Management, and Demilitarization AEC – AERTA / Functional and Operational Analysis RDECOM – Program Management ECBC / ARDEC - Lead Technologists Grucci – Current Manufacturer

Project Approach: Phase I Development of a Replacement Composition Two teams developing candidate replacements Edgewood Chemical Biological Command Lead: Mr. Joseph Domanico Searching for an Organic-based composition Armaments Research, Development, and Engineering Center Lead: Mr. James Wejsa Searching for an metallic-based composition Sponsored by PM Close Combat Support Product Improvement Program

Project Approach: Phase I (Cont.) Proof of Principal Demonstration Candidate compositions evaluated/screened for Size, weight, flash, noise, environmental impacts, and safety. Manufacturability and transparency to the user Downselect: July 2004 Final candidates selected and initial hazard classification performed (IHC)

Project Approach: Phase II Demonstration, Validation, and Testing 2 candidates will go through Phase II New composition must Meet system baseline and functional requirements Mil-S-10057H, MIL-S-10058H Associated drawings Meet subjective requirements Size, weight, shape, fragmentation and feel Not require a change in manufacturing process Energetic Material Qualification Board (EQMB) tests

Project Approach: Phase II (cont.) Demonstration, Validation, and Testing (cont.) Final Hazard Classification (FHC) tests Environmental and Health Assessments ECBC Coordinates with CHPPM Downselect: 3rd Quarter FY05 Final Composition

SYSTEM BASELINE & FUNCTIONAL REQUIREMENTS Performance Requirements Current Composition M115A2 Simulator Projectile, Ground Burst DODAC: 1370-L594 DOT: Explosive B (PN: 7549246) Delay after Ignition Whistle: 6-10 sec Burst: 8-14 sec Burning Time Photo Flash: Instantaneous Whistle: 2-4 sec Sound Level 138 decibels min at 75 feet (Mil-S-10058H) Whistle Composition(2 gm) (PN:7549227) Sodium Salicylate (28%) Potassium Perchlorate (69%) Red Gum (3%) Flash Composition (40 grams) (PN: 12972326) Aluminum (flaked) 42.5% Potassium Perchlorate (57.5%) Ignition System Fuse Igniter Charge (41 mg)-M3A1 (PN:8833721) Potassium Chlorate (88%) Charcoal (10%) Dextrin (2%) Fuse End Primer –9256477 Safety Fuse (3 1/4” by 3”)-9345154 Quick Match (1 ½”, Type 2, Cl A, Mil-G-378) M116A1 Simulator Hand Grenade DODAC: 1370-L601 DOT: Explosive B (PN: 9256467) Delay after Ignition Burst, 6 to 12 sec (acceptance 8.5 sec min) Burning Time Photo Flash: Instantaneous Sound Level 125 decibels min at 75 feet (Mil-S-10057H) Flash Composition (20 grams) (PN: 12972326) Aluminum (flaked) 42.5% Potassium Perchlorate (57.5%) Ignition System Fuse Igniter Charge (41 mg)-M3A1 (PN:8833721) See above composition Fuse End Primer –9256477 Safety Fuse ( ” by ”)-9345154

Project Approach: Phase III Document Changes Engineering Change Proposal (ECP) for Specification/Drawings Change Technical Data Package for Manufacturing Final Implementation Incorporate now composition into production Monitor production Conduct acceptance testing Transition to the field.

The Risks Cost Performance characteristics Manufacturability Testing Schedule Manufacturer’s Availability Balance between PIP and Production Schedules ‘Green Bullet’ syndrome Risks reduced by developing two candidates

Good News: We are ahead of schedule! The Timeframe Good News: We are ahead of schedule!

Summary Will replace the #1 sources of perchlorate contamination risk on ranges On track to finish 5 months ahead of original schedule Army Ordnance P2 program is working to replace perchlorate in higher volume, life-cycle risk items Results, lessons learned of this program will be leveraged on other projects