Signal Feedthrough Progress Report Pin Carrier Order Plans for Prototypes Endcap Integration Issues Schedule and Management Issues Michel Lefebvre University.
Line Efficiency     Percentage Month Today’s Date
Unit Number Oct 2011 Nov 2011 Dec 2011 Jan 2012 Feb 2012 Mar 2012 Apr 2012 May 2012 Jun 2012 Jul 2012 Aug 2012 Sep (3/4 Unit) 7 8 Units.
Lab5 Production Status: Optics and RBX integration Pawel de Barbaro U. of Rochester.
Endcap Integration Workshop: June 11-14, CSC Commissioning Andrey Korytov.
19 May 1999 LAr WeekM. Lefebvre Endcap Signal Feedthrough Steel Order –Order fully coordinated with BNL –The order was ready to go Monday May 10th to lowest.
RP detectors CTS Sensors now in production, full delivery between February and June 07 Production GUI and DB being finalised Test Procedure being defined.
ATLAS Endcap Signal Feedthrough Project Status Report Pin carrier Procurement Summary Feedthrough Production QA/QC Shipment to CERN Reception Tests at.
Signal Feedthrough Progress Report New FEA Results on Pin Carriers Vacuum Cable Development in Canada Leak Test Station and Assembly Station in Victoria.
LAV construction status – M. Moulson (Frascati) – Photon Veto WG – CERN – 12 Jul 2011 LAV construction status: a snapshot 2 A1 Arrived at CERN 29 Jun.
Endcap Signal Feedthrough Overview Endcap Signal Feedthroughs are constructed and tested in Victoria by Victoria and TRIUMF staff. Each feedthrough unit.
LAV construction: Status and overview Matthew Moulson (Frascati) for the LAV Working Group NA62 Photon-Veto Working Group Meeting Brussels, 8 September.
LAr Week Feb 2000 M. Lefebvre Milestones and Schedule General Production Readiness Review  Passed in Jan 99 Leak Test Station and Electric Test.
ProjectImpactResourcesDeadlineResourcesDeadline Forecast Plan Time Resources Risk 001xx 002xx 003xx 004xx 005xx 006xx 007xx TotalXX Example 1: Portfolio.
Dec
21 Mar 2007ALICE - Paul Dauncey1 ALICE CR07: Installation and Commissioning Paul Dauncey Material from: L. Leistam: “ALICE Status” W. Riegler: “Commissioning.
ELENA installation progress F. Butin / ELENA collaboration.
12 GeV Project Status Glenn R. Young 12 GeV Project Status
Jan 2016 Solar Lunar Data.
Production at Victoria University of Victoria

SCHEDULE Nov 1st - Assembly Table Complete
Q1 Jan Feb Mar ENTER TEXT HERE Notes

Project timeline # 3 Step # 3 is about x, y and z # 2
Average Monthly Temperature and Rainfall


Mammoth Caves National Park, Kentucky
2017 Jan Sun Mon Tue Wed Thu Fri Sat

This Presentation Pack is brought to you by
Gantt Chart Enter Year Here Activities Jan Feb Mar Apr May Jun Jul Aug
Q1 Q2 Q3 Q4 PRODUCT ROADMAP TITLE Roadmap Tagline MILESTONE MILESTONE
Free PPT Diagrams : ALLPPT.com


FY 2019 Close Schedule Bi-Weekly Payroll governs close schedule

Step 3 Step 2 Step 1 Put your text here Put your text here
MONTH CYCLE BEGINS CYCLE ENDS DUE TO FINANCE JUL /2/2015
Jan Sun Mon Tue Wed Thu Fri Sat

©G Dear 2008 – Not to be sold/Free to use
Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec ITEM 1 ITEM 2 ITEM 3
Electricity Cost and Use – FY 2016 and FY 2017

Safety Group Program Timeline
Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
Q1 Q2 Q3 Q4 PRODUCT ROADMAP TITLE Roadmap Tagline MILESTONE MILESTONE
Free PPT Diagrams : ALLPPT.com


Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
Teleconference ACS – FREIA 19th June 2017
Text for section 1 1 Text for section 2 2 Text for section 3 3
Project timeline # 3 Step # 3 is about x, y and z # 2
ANCHORAGE POLICE DEPARTMENT DATA COLLECTION
TIMELINE NAME OF PROJECT Today 2016 Jan Feb Mar Apr May Jun
Safety Group Program Timeline

Q1 Q2 Q3 Q4 PRODUCT ROADMAP TITLE Roadmap Tagline MILESTONE MILESTONE
Presentation transcript:

LARG week 07/01 Paul Poffenberger University of Victoria Endcap Feedthrough Production at Victoria Status Summary

LARG week 07/01 Paul Poffenberger University of Victoria All flanges, funnels, bellows, and VCR T-glands in stock, cleaned, and tested. Heater parts ready for assembly; still waiting for final word from BNL on connectors for power and RTD’s. All vacuum cables in stock (232 still to be tested). Pigtails / 1725 received to date; arriving at steady pace. Pincarriers - 96 received to date, 24 more expected this week. Five feedthroughs completed since last LARG week; total of nine feedthroughs completed (three feedthroughs presently under construction). Component Status

LARG week 07/01 Paul Poffenberger University of Victoria typereceivedtotal expected orsay + uvic - returned T T (1) T T T T LV (1) - returned to Axon for repair Pigtail Inventory Vacuum Cable Inventory typereceivedreturned expected Signal LV (not all tested yet)

LARG week 07/01 Paul Poffenberger University of Victoria Integrated Victoria pincarrier receptions

LARG week 07/01 Paul Poffenberger University of Victoria FeedThrough Production Rate Batch of 24 pincarriers arrived in May 3 FeedThroughs built in 23 day period

LARG week 07/01 Paul Poffenberger University of Victoria Date Build (total) Type At CERN 30-jun-2001 ( 9) (9 STD built to date) 31-jul (11) (1 HEC, 1 SPCL) 31-aug (13) (1 HEC, 1 SPCL) 30-sep (16) (1 HEC, 2 SPCL) 31-oct (19) (1 HEC, 2 STD) 4 30-nov (22) (2 STD, 1 FCAL) dec (24) (2 STD) jan (28) (4 STD) feb (31) (1 HEC, 1 SPCL, 1 STD) mar (34) (2 STD, 1 FCAL) apr (37) (2 HEC, 1 SPCL) may (40) (1 HEC, 2 SPCL) jun (44) (4 STD) jul (47) (3 STD) aug (49) (2 STD) sep (53) (4 STD) oct (55) (1 HEC, 1 SPCL) nov Projected Production Rate assumes continued supply of pincarriers

LARG week 07/01 Paul Poffenberger University of Victoria Projected Integrated Production Rate

LARG week 07/01 Paul Poffenberger University of Victoria First HEC EndCap FeedThrough built in Victoria at end of June ATL-AE-AN-0002

LARG week 07/01 Paul Poffenberger University of Victoria Plan to ship 4 feedthroughs to CERN in September, followed by electrical and vacuum reception test equipment Shock test: FeedThrough dropped from 20.5 cm – no damage to bellows convolutions – bellows volume still leak tight

LARG week 07/01 Paul Poffenberger University of Victoria Electrical tests at CERN Tests O n Reception: – Crosstalk plus precision resistance – Require 1 long day per feedthrough Tests After installation: –Crosstalk plus precision resistance –Require 1 long day per feedthrough –Requires close access to feedthroughs from scaffolding Most electrical test equipment has now been purchased or built. Some software development still remains to be done.

LARG week 07/01 Paul Poffenberger University of Victoria Vacuum tests on reception at CERN CERN provides: – Helium leak checker – Vacuum pump

LARG week 07/01 Paul Poffenberger University of Victoria 12.5 Ohm equivalent Two 4-wire RTD’s EndCap Feedthrough Ambient Flange Heaters

LARG week 07/01 Paul Poffenberger University of Victoria EndCap Feedthrough Ambient Flange Heater Power Supply Recommendations STD, SPCL, FCAL (good vacuum): * heat leakage = Watts  power supply = Watts HCAL (good vacuum): * heat leakage = Watts  power supply > Watts STD, SPCL, FCAL (1 bar in bellows): * heat leakage ~ 75 Watts STD, SPCL, FCAL (1.5 bar in bellows): * heat leakage ~ Watts

LARG week 07/01 Paul Poffenberger University of Victoria Site Visit by Chris Oram 29 May Overall impressions — clean, well organized assembly site Safety issues — no safety hazards found Additional check list items — implemented Traveler summary sheets — implemented

LARG week 07/01 Paul Poffenberger University of Victoria Pedestal Mockup Alberta (Jan Soukup): pedestal mockup Victoria: prototype feedthroughs and stand