WEST DELTA WATER CONSERVATION AND IRRIGATION REHABILITATION (WDWCIR) PROJECT ByA.M.Farahat.

Slides:



Advertisements
Similar presentations
Mozambique Sustainable Irrigation Development Project (PROIRRI) Early Stage Steps to a Future Impact Evaluation Herminia Pedro, MINAG - DE Paulino Balate.
Advertisements

Farmer Water User Community (FWUC)
PPP International Best Practice and Regional Application Tegucigalpa, Honduras April , 2008 Sponsored by the Spanish Trust Fund.
Flaxbourne Community Irrigation Scheme
AN OVERVIEW OF PROJECT FINANCE IN PRIVATE-PUBLIC PARTNERSHIPS FINANCE 101 T ERRI S MALINSKY Managing Director B.C.
By: Saddam Qahtan Waheed B. Sc. in Water Resources Engineering (2007) M. Sc. in Hydrological Engineering and Remote Sensing Techniques (2010) SWLRI \ NCWRM.
Company LOGO Performance- or Output-Based Procurement (PBP): Basics and Applications in Bank Projects Patricia Baquero
Kindred North Motton Irrigation Scheme Landholder water sale 2 February 2012.
Business Angels & Venture Capital Northwest Business Angels 5 th September 2007.
v1 The Future of PPPs in Hong Kong Project Chambers Forum 28 May 2010 Presented by Sam Farrands.
Novel Procurement Options ARBE121 – PFI  Variants, additions to or environments for routes  Private Finance Initiative (PFI) A funding & operational.
WATER RESOURCES DEMAND MANAGEMENT FOR IRRIGATION AT THE NATIONAL LEVEL MYANMAR.
Phases of A BOT Project Prepared By :Afaf Bu-khawa Course title: Technology Implementation,MGT 620.
Non-conventional Financing in Public Transport Francis Cheung AVV Transport Research Centre Ministry of Transport, Public Works and Water Management The.
Document 51 1 Lansdowne Partnership Plan Business Model Document 5.
Jeff Delmon FEU Financial Solutions World Bank. Why PPP? Procurement efficiency Lifecycle management Design/construction/operation management Monetizing.
2013 APEC Seminar, Strengthening Public-Private Partnership to Reduce Food Losses in the Supply Chain ADDRESSING FOOD SECURITY: THE PHILIPPINE EXPERIENCE.
M. Morshed1 Chapter:05 Financial Statement of Bank.
Financing Urban Public Infrastructure
23/08/20151 European Investment Bank EUROPEAN INVESTMENT BANK Urban Development Projects 29 th May 2009 Barbara Lemke Urban Planner Projects Directorate.
Kansas Center for Entrepreneurship Kansas Capital Multiplier Loan and Venture Funds Kansas City Lender Summit Federal Reserve Bank of Kansas City August.
Cashflow Planning. Introduction During the planning process you will have: selected your chosen (outline) system assessed the plan in terms of resources.
Water Saving Approaches on Agricultural Consumption in Iran Mehrzad Ehsani Director General on Operation of Irrigation Structures, Iran’s Water Resources.
U.S Conference of Mayors August 2004 Mayor’s ’04 Metro Agenda Bipartisan Priorities Statement Directed for candidates in Presidential and Congressional.
The story of two recent water projects…….. June 2005.
FINANCING THE VENTURE. Financing the Venture  Capital is any form of wealth employed to produce more wealth.  Three forms of capital are commonly identified:
Level 1 Business Studies
1 Agricultural Development Strategy for Andean and Caribbean Countries January 2004 Inter-American Development Bank By: Gabriel Montes (RE3EN3) Inter-American.
New Decade - New Challenges Annual Conference September 2010 Water Services Training Group 14 th Annual Conference New Decade – New Challenges 9 th September.
Stave Lake Water Supply and Treatment Project Business Case for P3 Canada Fund Funding Request AMWSC April
What is the difference between savings and investments?
IFC Advisory Services Provide for fee advisory services to governments for PSP and PPP transactionsProvide for fee advisory services to governments for.
Ruataniwha Water Scheme HB Today Public Meeting 6 August 2015 HBRIC is a subsidiary (CCO) of Hawke’s Bay Regional Council H AWKE’S B AY R EGIONAL I NVESTMENT.
INFRASTRUCTURE FINANCING. What is Infrastructure? “Infrastructure is define as the physical framework of facilities through which goods and services are.
1 Who is SCORE ? Welcome to this Seminar An Introduction to Starting & Growing a Small Business.
1 World Bank Investments in Uzbekistan Tashkent August 17, 2012 Takuya Kamata Country Manager for Uzbekistan The World Bank.
PPP International Best Practice and Regional Application Overview of Public Private Partnerships (PPPs) April, 2008 Tegucigalpa, Honduras Filip Drapak.
WVDOH Experience... thus far.  Public-Private Partnerships = PPP=3P = P3 ... Most folks in industry refer to them as P3, so that’s what I go with.
1 Cost Recovery in Jordan March 2009 Eng. Kamal Zoubi Former CEO / Jordan Water Company.
The Senegalese pro-poor approach to tackle the urban water sector affordability/viability issue 5th World Water Forum World Water – Istanbul – Thursday,
 Discuss the importance of farm credit.  Explain three fundamentals of credit.  List eight rational credit principles needed for effective decision.
Structure of the US farm economy EconS350 Fall Semester, 2010.
NATIONAL LOAN GUARANTEE FUND FOR SMEs GUARANTEES OF NLGFSME – A WAY FOR FACILITATING THE ACCESS OF SMEs TO FINANCING International Forum for Investments.
Water for a food-secure world Implementing agricultural water improvements in challenging contexts: Ghana 12 September 2012.
Promoting Financial Sustainability in the WSS Sector: The Case of the Philippines Jeremias N. Paul, Jr. Undersecretary Department of Finance World Water.
WSSB Capacity Enhancement Workshop1.  Definition: Public-Private Partnerships (PPPs) are a form of legally enforceable contracts between the public and.
MAKING IT HAPPEN. TRB 88 th Annual Meeting Risk Management in Public-Private Partnerships January 14, 2009 Statutory and Public Policy Approaches to PPP.
SEEP Annual Conference 2015 Inclusion and Resilience: The Next Challenge Insuring Farm and Family: Innovative Risk Management Strategies in Developing.
Urban water supply The privatization process in Mozambique
PPP Legal & Regulatory Framework. PPP Policy In July 2008 GOK approved the PPP policy directive through which: PPPs are identified as a method for investing.
ACBA Leasing East - Agri ACBA LEASING I.Why an initiative for leasing activities in Armenia ? Credit is too much expensive in emerging markets Leasing.
 Contract by Public Authority for provision of asset and/or services  With private entity  Private finance used to fund asset/service  Long-term in.
GOVERNMENT OF THE KINGDOM OF LESOTHO Water and Sewerage Company (WASCO) Greater Maseru Water Supply Feasibility Study & Preliminary Design Results of Financial.
DEVELOPMENT OF AN IRRIGATION SCHEME FOR THE MANJIMUP REGION 17 MARCH2016 PAUL ELLERY SENIOR PROJECT MANAGER – TASMANIAN IRRIGATION.
SBA 504 Loan Program Long Term Fixed Asset Financing For Small Businesses.
Topic 3: Finance and Accounts
DOE Presentation 12/10/03P. M. Grant, EPRI. DOE Presentation 12/10/03P. M. Grant, EPRI.
RURAL CREDIT IN ROMANIA - PRE - ACCESION PERIOD- Brussels, January 27, 2011 MINISTRY OF AGRICULTURE AND RURAL DEVELOPMENT.
Mortgage Finance Opportunities and Challenges By Taimur Afzal, Chairman ASSOCIATION OF MORTGAGE BANKERS (AMB) March 25th
PRESENTATION BY CERATH INVESTMENTS
BOT LAW (R.A. No. 6957, as amended by R.A. No. 7718)
Maximizing the returns to large scale infrastructure investments
SEWER SERVICE FEE RATE STRUCTURE ALTERNATIVE
CDN Bison Association AGM
Level 1 Business Studies
Financing Transportation Infrastructure
Nationalising Special Purpose Vehicles to end PFI
Sources of small business finance
Support for young farmers in Hungary
Presentation transcript:

WEST DELTA WATER CONSERVATION AND IRRIGATION REHABILITATION (WDWCIR) PROJECT ByA.M.Farahat

WEST DELTA Northern Area (Nubaria) Northern Area (Nubaria) Area65000 feddans Area65000 feddans Irrigationsurface Irrigationsurface Southern Area Southern Area Area feddans Area feddans Irrigation underground water Irrigation underground water

WEST DELTA Total area feddans Total area feddans (100000) hectars Agriculture annual output Agriculture annual output $ million Inhabitants Inhabitants Jobs Jobs Cultivated land47% Cultivated land47% Water extraction870 milliom cu meter Water extraction870 milliom cu meter (in year 2000) 36.2% increase over a decade

THE PROJECT Closed conduit (piped) surface water irrigation system Closed conduit (piped) surface water irrigation system In southern area only, i.e feddans In southern area only, i.e feddans Threshold area feddans Threshold area feddans Private Public Partnership Private Public Partnership Private operator (local or foreign, individual or consortium) Private operator (local or foreign, individual or consortium) 30 years concession basis 30 years concession basis Full cost borne by farmers Full cost borne by farmers Design-Build-Operate scheme Design-Build-Operate scheme Contractual interest of farmers to “ Connect and Pay ” Contractual interest of farmers to “ Connect and Pay ” Operator can withdraw if contracting farmers less than threshold Operator can withdraw if contracting farmers less than threshold Good potential for a growing agribusines Good potential for a growing agribusines

CONSTRUCTION (INFRASTRUCTURE) COST $ million, for feddans only $ million, for feddans only 15% to be covered by operator ’ s own contribution ( venture capital) 15% to be covered by operator ’ s own contribution ( venture capital) 85% loan from World Bank through the Egyptian Government 85% loan from World Bank through the Egyptian Government Line of credit type of lending Line of credit type of lending Repayment through annual concessional fees to the government Repayment through annual concessional fees to the government

PROJECT COST 1. Fixed (capital) cost 1. Infrastructure for feddans 2. Expansion beyond feddans (max feddans) 2. Variable Cost 1. Operating cost 2. Routine maintenance 3. Management fees

FARMERS’ TARIFF 1. Fixed component per feddan covering: 1. Annual concessional fees 2. Expansion cost ( beyond feddans)?? 3. Return on investment / profit 2. Volumetric component per cubic meter covering: 1. Operating cost 2. Routine maintenance 3. Management fees

PROJECT STAGES Prequalification ( Pass/Fail basis) Prequalification ( Pass/Fail basis) Distribution of TOR ( including technical specs and service standards) to bidders Distribution of TOR ( including technical specs and service standards) to bidders Tendering 12 April 2007 Tendering 12 April 2007 Contract Award ( minimum tariff criterion) Contract Award ( minimum tariff criterion) Subscription period ( legal contract between operator and farmers, operator verifies exact demand figure) Subscription period ( legal contract between operator and farmers, operator verifies exact demand figure) Security payment by farmers Security payment by farmers Final design by operator Final design by operator Implementation starts Implementation starts