Guidelines for the Exploration and Development of Geo Power Paul Morgan Colorado Geological Survey for the Colorado Geothermal Working Group Final 2011.

Slides:



Advertisements
Similar presentations
Siskiyou County Land Development Manual 2006 Update Planning Commission Hearing Land Development Manual Update.
Advertisements

Proposed Des Moines Airport Authority Council Workshop – October 25, 2010.
Agency Drafts Statement of Scope Governor Approves (2) No Agency Drafts: Special Report for rules impacting housing Fiscal Estimate.
General Information Name: GRR Test Geothermal Area County: AnyCounty, NV Technology: Geothermal Federal Funding: Yes (Exploration) Project Status Current.
Oil and Gas Leasing Jim Albano – Lead Natural Resource Specialist Reservoir Management and Operations Section Montana State Office – (406)
Geothermal - Utah Program - General Program - General Areas of Geothermal Potential – Prospectively Valuable and Known Geothermal Resource Areas (KGRA)
National Pollutant Discharge Elimination System -NPDES Permit Process-
National Geothermal Policy and Regulation R. Gordon Bloomquist, Ph.D. Washington State University Energy Program Salt Lake City, Utah 20 January 2004.
It’s not my Fracking Problem! Regulations, Liability, and the Process of Hydraulic Fracturing Katie Heath November 30, 2010.
GAS DRILLING & HYDRAULIC FRACTURING In the Tidewater Region Photo credit: R.W. Dawson.
EVOLUTION OF SPACING AND POOLING IN COLORADO Denver Association of Division Order Analysts July 21, 2014 Denver, Colorado Steve Sullivan Welborn Sullivan.
FORM 1000 – APPLICATION TO DRILL, RECOMPLETE OR REENTER.
Western States Energy & Environment Symposium October 27, 2009.
Mining Lease Application Assessment: Processes within the Minerals and Energy Division PIRSA.
DOE OFFICE OF INDIAN ENERGY Renewable Energy Project Development and Finance Framework: The 5 Step Process 1.
NUNAVUT TUNNGAVIK INCORPORATED Lands Policy Advisory Committee Draft Uranium Policy.
Business Ownerships MARKETING DYNAMICS UNIT 1 LESSON 2 Copyright © Texas Education Agency, All rights reserved.
Bureau of Land Management Solid Minerals Programs June 12, 2013.
Part 1.3 Mineral Rights & Leasing. Objectives After reading the chapter and reviewing the materials presented the students will be able to: Understand.
U. S. Department of the Interior Bureau of Land Management Division of Fluid Minerals, 1.
Joe Vieira Project Manager BLM Colorado Renewable Energy Team 6/28/2011.
UTAH GEOTHERMAL Dr. R. Gordon Bloomquist, Ph.D Washington State University Energy Program Salt Lake City, Utah 20 January 2004.
Final Rule Setting Federal Standards for Conducting All Appropriate Inquiries U.S. EPA Brownfields Program.
Introduction to Public Hospital Districts April 25, 2002 Association of Washington Public Hospital Districts.
North Eastham Wind Feasibility Study Results Brian Eastman Eastham Energy Committee Kristen Burke Massachusetts Technology Collaborative Ric O’Connell.
E&P STORM WATER OVERVIEW Domestic Onshore Energy E&P STORM WATER OVERVIEW Domestic Onshore Energy May 10, 2005.
1 October, 2005 Activities and Activity Director Guidance Training (F248) §483.15(f)(l), and (F249) §483.15(f)(2)
PETROLEUM LAND ADMINISTRATION OVERVIEW PRESENTATION BY CAPLA Regulatory Committee.
How 1041 Regulations are Impacting Geothermal Development A discussion of how counties are applying 1041 regulations to geothermal development and the.
Planning Processes/Permits “From Pre-application meeting to Board of Aldermen Approval.” “From Pre-application meeting to Board of Aldermen Approval.”
Overview of Regulatory Changes, Policy and Implementation Colleen Brisnehan Colorado Department of Public Health And Environment Hazardous Materials and.
Agency Drafts Statement of Scope Governor Approves Statement of Scope (2) No Agency Drafts: Special Report for rules impacting housing
UNDERSTANDING and PROTECTING the THERMAL RESOURCE by Chuck Pettee, Water Resources Division, National Park Service.
1 Federal Oil and Gas Planning, NEPA, and Development Scott F. Archer USDI - Bureau of Land Management April 8, 2009.
Los Osos Community Services District Basin Management Planning and Proposed Work Program June 5, 2008.
B r a z o s R i v e r A u t h o r i t y FERC Encroachments.
Board of County Commissioners PUBLIC HEARING December 2, 2008.
Energy Exploration & Development On National Forest System Lands Barry Burkhardt
Chapter 2 Fresh Water Section 5 Water Underground
1 BLM’s Hydraulic Fracturing Revised Proposed Rule 2013 Virginia Governor’s Conference on Energy Richmond, VA October 16, 2013 Presented by: Luke D. Johnson,
Main Requirements on Different Stages of the Licensing Process for New Nuclear Facilities Module 4.1 Steps in the Licensing Process Geoff Vaughan University.
NATURAL GAS LEASES Understanding Your Rights Protecting Your Interests Agricultural Law Resource and Reference Center Ross H. Pifer, J.D., LL.M., Director.
The Role Of Geothermal In Reaching Future Electricity Targets For The UK Stevie Spencer 24 th February 2005.
Colorado Water Law By Travis Hoesli. Colorado Water Law Unit Objectives 1. Understand who makes water laws in Colorado. 2. Recognize the general laws.
© NERC All rights reserved Potential geothermal opportunities in Scotland Martin Gillespie British Geological Survey.
Geothermal Leasing on Federal Lands (I’ve looked at life from both sides now) Paul Morgan Colorado Geological Survey for the Denver Meeting of the Colorado.
Tier I: Module 5 CERCLA 128(a): Tribal Response Program Element 4: Verification & Certification.
Guide for Rural Local Officials Evaluating Your Input into the Statewide Transportation Planning Process Developed by the National Association of Development.
Current state of regulation of shale gas regulation in the UK Dr Sanna 12 March
Revisions to Primacy State Underground Injection Control Programs Primacy State Implementation of the New Class V Rule.
Kilarc-Cow Creek Hydroelectric Project Decommissioning FERC Project No. 606 Shasta County Board of Supervisors March 4, 2008.
Surface Rights in Nunavut
Let’s Make a Deal Buying and Selling a Practice. Presented by Denise Robertson, Mills & Mills LLP Denise joined Mills & Mills LLP as an Associate in 2005.
Professor Charles Davis Department of Political Science Colorado State University Ft. Collins, CO 80523
PLANNING AND DECISION- MAKING IN AN ORGANIZATION Business Management Copyright © Texas Education Agency, All rights reserved.
Reclamation of Abandoned Mine Lands: EPA Perspective.
Think safe. Act safe. Be safe. LEHR Site Annual Soil Management Plan Training Sue Fields, Environmental Health & Safety Sept,
Overview of Legal Issues in Marcellus Shale Development Penn State Ag Council Membership Meeting October 12, 2009 Agricultural Law Resource and Reference.
Created by Way Development Ventures as a public service The following presentation provides background information to assist voters in gaining an understanding.
Regulation of Geothermal Resources in Colorado
Oregon Water Resources Department April 14, 2011 HB 2134: Umatilla Basin Water Exchange.
Federal Aviation Administration ARP SOP No SOP for CATEX Determinations Effective Date: Oct. 01, 2014 February 2016.
1 Sahtu Land Use Planning Board Public Hearing on the Draft 3 Sahtu Land Use Plan May 2011 INAC Presentation.
RICK COOPER DIRECTOR OF THE DIVISION OF GAS AND OIL VIRGINIA DEPARTMENT OF MINES, MINERALS AND ENERGY Gas and Oil Well Drilling Requirements for the Tidewater.
Department of Environmental Quality
Pre-Close Rules of Engagement
Department of Environmental Quality
Groundwater and Waste Management Committee November 9, 2016
Julie Woosley, Division of Waste Management
Andrea Sundstrand Associate Professor
Presentation transcript:

Guidelines for the Exploration and Development of Geo Power Paul Morgan Colorado Geological Survey for the Colorado Geothermal Working Group Final 2011 Meeting Loveland 20 th October, 2011

General Guide to the Rules and Regulations Controlling the Exploration and Development of Geothermal Resources of Electrical Power Generation in Colorado “Rather than illuminate, regulatory documents generally highlight the darkness 1 ” 1 Paraphrased from Terry Pratchet, 2008, Guards,! Guards!

Where to Start: Who Owns the Land? Private Ownership: Private permission for access; state drilling permitting & generally state resources regulation. State Ownership: State Land Board access and resource regulation; state drilling permitting. Federal Ownership (USFS/BLM): Federal access and resource regulation; state and federal drilling permitting. Spilt Estate – Federal Subsurface: Private agreement for reasonable access required (with reasonable compensation); federal resource regulation; state and federal drilling permitting. All Ownerships: Local government regulations, Neighbors, Local water districts, CDPHE, EPA, PUC, etc.

What is / Who Owns the Resource? Private Land: Resource is Water; associated water appropriated by State Engineer and Colorado Ground Water Commission –Tributary water; hydrothermal resource; Owner - People of Colorado –Confined aquifer; and/or hot-dry-rock (HDR) resource; Owner - Land Owner (resource may be severed) –Designated basin; hydrothermal or HDR resource; Owner - Land Owner (resource may be severed) State Land: Resource is Mineral; “Owner” - State of Colorado –Resources managed by State Land Board; royalties may be charged. Associated water appropriated by State Engineer. Federal Land/ Split Estate, Federal Subsurface: Resource is Mineral; “Owner” – Federal Government –Resources is managed by BLM; royalties will be charged. Associated water appropriated by State Engineer.

Colorado Designated Basins and Management Districts (Water) Source: Colorado Division of Water Resources/Ground Water/Designated Basins (CGWC): /Pages/default.aspx

Potential Train Wreck – Hot Dry Rock Colorado Revised Statute Definitions –‘(4) "Hot dry rock" means a geothermal resource which lacks sufficient geothermal fluid to transport commercial amounts of energy to the surface and which is not in association with an economically useful groundwater resource.’ (My emphasis) How are these economic conditions known before drilling? Permitting requires designation of the owner, which changes if the resource is tributary or HDR. All rocks below the water table may be considered to be saturated. Lack of geothermal fluid is theoretically not a problem: permeability is commonly a problem.

Surface Exploration (No Surface Disturbance) Private Land: Permission of Land Owner State Land: Geothermal Exploration Lease – may include geothermal gradient wells and deep test wells and flow tests Federal Land: Approved Notice of Intent to conduct specified geothermal resource exploration. If split estate – permission of owner of surface estate. If Surface Exploration is positive, suggest consider first PUBLIC INFORMATION MEETING, prior to any drilling.

Geothermal Gradient Test Wells & Other Surface Disturbing Exploration Activity Private Land: Permission of land owner and agreement on drill sites. Type A well permits required from State Division of Water Resources. State Land: Exploration lease already required. Type A well permits required from State Division of Water Resources. Federal Land: Approved Notice of Intent for land disturbing activities, federally approved drilling permits and type A well permits required from State Division of Water Resources. Check regulations of local government.

Geothermal Leasing Private Land: Suggest enter formal agreement with land owner including agreement for discovery of any non-geothermal resources. Maybe consider similar agreement for surface of split estate? State Land: A Geothermal Exploration Lease is required before this stage. Federal Land/Split Estate Land: A geothermal lease is required before any deep drilling. Land must be nominated for lease before a careful (and lengthy) review of the suitability of the land for lease can begin. If found suitable, the land may be offered for competitive bidding in a public auction, probably with stipulations on the lease. The winner of the lease gains the exclusive right in general to proceed with further exploration during the lease period, but not permission to conduct any specific activities.

Informational Meetings With leasing of federal land there is public input into the information gathering process leading to the decision whether or not to lease and the USFS/BLM is highly likely to hold one or more meetings prior to a lease sale. Entities interested in the lease may of may not be invited to these meetings. If there is a ground-swell of negative opinion based on inaccurate information, a carefully considered response is appropriate. Initiating planning meetings with local authorities at this stage is very important to apprise them of your sensitivity to the needs of the community, present an honest picture of where the likelihood of development is at this stage, and discuss the potential benefits vs. few negative aspects of development should a project reach fruition.

Deep Test Wells Private Land: Permission of land owner (you did negotiate this in lease agreement?!?). Type B drilling permit from the State Division of Water Resources (DWR) and associated construction permits. State Land: Check with State Land Board – Exploration lease included these wells if originally included. Type B drilling permit from the DWR and associated construction permits. Federal Land and Split Estate Land: Geothermal lease is required before drilling any deep test wells. However, a specific drilling permit is still required for each well from the USFS/BLM together with a type B drilling permit from the DWR and associated construction permits. On split estate lands permission of the owner of the surface estate is required. For All Lands, check regulations of local authorities.

Flow Tests – Continuation of Deep Drilling All Lands –Make necessary permit requests at same time as deep well permitting; Surface water disposal regulated by Colorado Department of Public Health and the Environment; Water Injection in Colorado regulated by the EPA; Capture and removal of geothermal fluid –Local Authority regulations; –Public information/education Opportunity for demonstration of environmental stewardship.

Final Decision Time Go or No-go –Public Information Meeting EITHER WAY! IF GO: Education –Bring in elected officials, staff and public from other communities that have had geothermal development to meet with local authorities, and public. If not already started, initiate power purchase agreement for any power to be generated.

Develop Field: Drill Production and Injection Wells Private Land: Permission of land owner; Type B well permits from DWR and associated construction permits. State Land: Need new Geothermal Lease to cover development of field from State Land Board. Type B well permits from DWR and associated construction permits. Federal Land and Split Estate Land: Drilling permits from USFS/BLM and type B well permits from DWR and associated construction permits. For split-estate land need permission of owner of surface estate. All Lands: Check regulations of local authorities.

Reinjection and Power-Plant Design All Lands: –Permit reinjection with EPA –Design in consultation with land owner where constructed, private, state, or federal land. –Design in accordance with all relevant local, state (PUC), and federal regulations and guidelines. –Design to meet all environmental standards and requirements during operation.

Illumination? Insert tab A into slot B. Open steam valve. Turn on Power. Illumination! Colorado is a patchwork of lands with different ownerships ranging from private to the federal government. Geothermal energy is old in Colorado, but also new. It is transported by Colorado’s most treasured commodity after her people: WATER. With that background, geothermal regulations in Colorado are remarkably simple.

Recommendations Geothermal permitting in Colorado for Idiots – not! Do not try this at home – what you have seen here has been performed by highly trained cheats under simulated conditions If lawyers only spoke English I am sure that we would all be able to understand the law (that goes for science too). Hire a lawyer, but I hope that you now know what you are paying for.

THANK YOU  Acknowledgements:  Matt Sares, Colorado Department of Water Resources  Many others who have patiently corrected my misunderstandings of geothermal rules and regulations. However, any remaining errors remain my own!  For Further Information   Programs & Projects  Minerals & Energy Resources  Geothermal 