Cooling: CEDAR PMT & Electronics Tim Jones Liverpool Group.

Slides:



Advertisements
Similar presentations
Heat Transfer to Solids in a Flowing Fluid
Advertisements

1 Ann Van Lysebetten CO 2 cooling experience in the LHCb Vertex Locator Vertex 2007 Lake Placid 24/09/2007.
April 7, 2010D.R. Lynch 1 PHENIX Shutdown 2010 April 7,2010 Don Lynch.
31/03/11FV 1 CEDAR from flammable gas safety point of view.
Mike Fitton Engineering Analysis Group Design and Computational Fluid Dynamic analysis of the T2K Target Neutrino Beams and Instrumentation 6th September.
CEDAR MECHANICS Liverpool Conceptual Design (Subject to funding from STFC) 1 CEDAR Mechanics Conceptual Design.
1 Dept. of Energy Technology, Div. of Applied Thermodynamics and Refrigeration Tube diameter influence on heat exchanger performance and design. Single.
18th March Richard Hawkings Humidity control in the ATLAS ID Richard Hawkings (CERN) JCOV meeting 18/3/04  Overview of humidity and associated gas.
First Wall Thermal Hydraulics Analysis El-Sayed Mogahed Fusion Technology Institute The University of Wisconsin With input from S. Malang, M. Sawan, I.
Safety Review: RF Issues Derun Li Absorber Safety Review December 9-10, 2003 Lawrence Berkeley National Laboratory Berkeley, CA
MICE Hydrogen System Implementation Tom Bradshaw Elwyn Baynham Iouri Ivaniouchenkov Jim Rochford.
Heat Exchangers with Cross Flow past Cylinders P M V Subbarao Professor Mechanical Engineering Department I I T Delhi Another Common Industrial Application!!!
Daya Bay Muon Subsystem Review, 7/28-29/2007, IHEP, Beijing Daya Bay RPC Gas System: Design Report & Budget Estimate Changguo Lu, Kirk McDonald Princeton.
CEDAR MECHANICS Liverpool Conceptual Design (Subject to funding from STFC) 1 CEDAR Mechanics Conceptual Design.
Cooling Update (May 2011) Tim. Overview From last time – Estimate Power Loads Active components Extraneous heat sources – Develop methodology for exploring.
CEDAR Cooling (CEDAR Meeting 23 rd May 2011) Tim Jones.
CO2 cooling pressure drop measurements R. Bates, R. French, G. Viehhauser, S. McMahon.
Week 1 Unit Conversions Mass and Volume Flow Ideal Gas Newtonian Fluids, Reynolds No. Week 2 Pressure Loss in Pipe Flow Pressure Loss Examples Flow Measurement.
CASIPP Design of Cryogenic Distribution System for CFETR CS model coil Division of Cryogenic Engineering and Technical Institute of Plasma Physics Chinese.
Fcal upgrade for sLHC: Cryogenics modifications – TE-CRG/ C.Fabre 1 ATLAS FCal Upgrade for sLHC: Modifications to the Calorimeter Cryogenic.
1 CO 2 cooling of an endplate with Timepix readout Bart Verlaat, Nikhef LCTPC collaboration meeting DESY, 22 September
23 Jan 2007 LASA Cryogenics Global Group 1 ILC Cryomodule piping L. Tavian for the cryogenics global group.
DCS TCSG November 10th 1999, H.J.Burckhart1 Status of the general purpose I/O system LMB u DCS Architecture u LMB u Local Monitor Box (LMB) u Concept u.
13th April 2005R.Bates, QM Measurements of Barrel and EC HEX R. Bates, M. Olcese, B. Gorski, QM for prototype builds.
Status overview of the cooling 31 August 2015 Bart Verlaat, Raphael Dumps 1.
CMS CO2 Test Stand Specifications and Installation Status Erik Voirin Fermilab PPD - Process Engineering Group CMS CO2 Cooling Test Stand1.
Pixel Support Tube Requirements and Interfaces M.Olcese PST CDR: CERN Oct. 17th 2001.
Hydraulic Kit (pump and tank) Pictures from prototype.
Utilities 14 October 2008 Martin Nordby, Gordon Bowden.
NA62 – GTK Cooling Station 1 Main characteristics Fluid: C 6 F 14 (fluorocarbon) Operating temperature: -30 °C ÷ -10°C Temperature precision: ±1 K Temperature.
CEDAR PMT Array DCS (Tim). Summary Summary of DCS monitored parameters based on original scheme – Major part of heat dissipation in electronics / PMTs.
CRYOGENICS FOR MLC Cryogenic Piping in the Module Eric Smith External Review of MLC October 03, October 2012Cryogenics for MLC1.
JCOV, 25 OCT 2001Thermal screens in ATLAS Inner Detector J.Godlewski EP/ATI  ATLAS Inner Detector layout  Specifications for thermal screens  ANSYS.
NA62 CEDAR PMT Cooling Update Tim. Chiller Investigations Web search identified Huber as one possible supplier – Europe-wide – Popular at CERN UK sales.
Convection: Internal Flow ( )
Equipment Design Designed by Eman A. Khajah. Outline Design of Heater. Design of Stripper.
Full Scale Thermosyphon Design Parameters and Technical Description Jose Botelho Direito EN/CV/DC 19 November, th Thermosyphon Workshop.
Alice DCS workshop S.Popescu 1 1. News from TPC DCS cooling prototype Project overview: Aim of the prototype: investigating and developing standard.
Week 1 Unit Conversions Conservation of Mass Ideal Gas Newtonian Fluids, Reynolds No. Pressure Loss in Pipe Flow Week 2 Pressure Loss Examples Flow Measurement.
LHC CMS Detector Upgrade Project FPIX Cooling Update Stefan Grünendahl, Fermilab For the FPIX Mechanical Group, 29 January 2015 Stefan Grünendahl,
Overview WG4 Meeting - 16th October 20121M. Gomez Marzoa, E. Da Riva Maximum ΔT admissible at cooling system T_1 T_2 T_1+0.5*ΔT Stave  If T_2 – T_1 =
UT cooling discussion 3 december 2014
1 Monophase Measurements on Prototype Pixel Structures D. Bintinger, M. Gilchriese, J. Taylor and J. Wirth and contributions from D. Cragg, E. Perrin and.
Simple CFD Estimate of End Flange Tuner Finger Cooling.
Update on Micro Channel Cooling Collaboration Meeting , G. Nüßle.
Mitglied der Helmholtz-Gemeinschaft Jörg Wolters, Michael Butzek Focused Cross Flow LBE Target for ESS 4th HPTW, Malmö, 3 May 2011.
KTAG Mechanics, Optics and Cooling Progress and Schedule NA62 CEDAR Meeting 3May20121.
CRYOGENICS FOR MLC Cryogenic Principle of the Module Eric Smith External Review of MLC October 03, October 2012Cryogenics for MLC1.
A.Henriques (JCOV meeting 31/5/2001) ATLAS Calorimeter cooling project Goal: u Definition of a common frame work for the cooling of the ATLAS calorimeter.
CEDAR MECHANICS Liverpool Conceptual Design (Subject to funding from STFC) 1 CEDAR Mechanics Conceptual Design.
ATLAS DCS ELMB PRR, March 4th 2002, H.J.Burckhart1 Embedded Local Monitor Board ELMB  Context  Aim  Requirements  Add-ons  Our aims of PRR.
EUROPEAN ORGANIZATION FOR NUCLEAR RESEARCH Design of the thermosiphon Test Facilities Thermosiphon Cooling Review A. MORAUX PH Dpt / DT Group CERN SEPTEMBER.
Table of Content Introduction of heat exchanger. Design of Coolers. Introduction of fixed bed reactors. Design of reactors.
KTAG Mechanics, Optics and Cooling Progress and Schedule NA62 CEDAR Meeting 26March20121.
ATLAS DCS Workshop on PLCs and Fieldbusses, November 26th 1999, H.J.Burckhart1 CAN and LMB in ATLAS u Controls in ATLAS u CAN u Local Monitor Box u Concept.
Status of the Marco chiller and Marco capacity analyses Bart Verlaat, Lukas Zwalinski, Maciej Osterga, Jan Godlewski MPI Munich,1 March.
The complete flow monitoring solution Measure – Display – Switch – Transmit.
A two-stage system for the future cooling system.
Proportional and Servo Valves
7 February 2012 Annekathrin Frankenberger (HEPHY Vienna) Open CO 2 Cooling System at the beam test Belle II SVD-PXD Meeting.
MVD COOLING STATUS-PAST AND UPDATES PIXEL COOLING PROJECT: -STUDIES and TEST on MATERIALS (Carbon Foam) -THERMAL FEM ANALYSES and TEST on DISKS and STAVES.
CO 2 Cooling Plants for the LHCb upgrade LHCb infrastructure workshop February Burkhard Schmidt With input from Bart Verlaat, Paolo Petagna and Lukasz.
MVD COOLING STATUS MVD COOLING PROJECT: CHOICE of COOLING FLUID,
Feedback on transfer line sizing and flow calculations for UT
DESIGN OF SHELL AND TUBE HEAT EXCHANGER
Design of the thermosiphon Test Facilities 2nd Thermosiphon Workshop
ARAC/H/F Air-cooled water chillers, free-cooling chillers and heat pumps Range: kW.
Pixel cooling specifications
Pixel CO2 Cooling Status
Presentation transcript:

Cooling: CEDAR PMT & Electronics Tim Jones Liverpool Group

Overview Cooling System Parameters – Estimate Power Loads Active components Extraneous heat sources – Develop methodology for exploring cooling system parameter space Flow rate Pressure drop Pipe bores Control and Monitoring – Strategies – Implementation 15/03/20112PMT Array Cooling

Cooling System Parameters Working document - “Specifications for the Cooling System for the NA62 CEDAR Kaon Tagger” Considers 2 sides as being separate sub-systems – Chiller/Heater – Interconnect pipe-work – Internal pipe-work, etc.. System specification driven from a desired inlet- to-outlet bulk temperature rise 15/03/20113PMT Array Cooling

Considerations Desired temperature rise and total power defines the mass-flow; – 1g/s cools 4.2W for 1  C Mass flow, density and tube bore defines volume flow and velocity. Velocity defines Reynolds Number. Reynolds Number defines pressure drop and HTC HTC defines tube wall temperature 15/03/20114PMT Array Cooling

Power Estimate (half unit) FE – 32 PMTs per array – 4 arrays per cooling circuit connected in series – 0.5W per PMT – 16W per PMT array, 64W for four arrays on one side Environment – Box dimensions 1.2(h) x 0.6(w) x 0.3(d). Area of 5 sides = 2.16sq.m – Box insulation k=0.05 W.m -1.K -1 – Wall thickness 50mm – Assume external wall is at 30  C and internal wall is at 20  C – Power = 0.05 x 2.16 x 10 / 0.05 = 22W Total Power – 64 (FE) + 22(env) = 86W[Round this to 100W cooling power] 15/03/20115PMT Array Cooling

Pipe-work Geometry External Interconnect – Flow and return lines 7m long with a bore of 12mm Internal – Heat exchanger: heated length 0.5m per array – Interconnect: 4m in total – Bore: sensible choices might be 4, 6, or 8mm 15/03/20116PMT Array Cooling

System Properties Volume Flow – Inversely proportional to desired temperature rise – Independent of tube bore – Flow = 1.54/  T lpm 15/03/20117PMT Array Cooling

System Properties Pressure Drop – Depends on fluid velocity (strong dependence on tube bore) 15/03/20118PMT Array Cooling

Draft Chiller Requirements T rise0.5deg C0.25deg C0.10 deg C Bore4mm6mm8mm4mm6mm8mm4mm6mm8mm Flow Pressure Tabulate Flow and pressure for different bores of the internal pipe work and desired temperature rise Chiller Specifications (preliminary web-trawl) ModelPowerFlow 0 bar)Pressure (bar) Fryka DLK  C Grant RC350G 20  C lpm) Neslab Thermoflex 900/P2 40  C 12.5 bar)7 bar Jubalo FC600S 20  C Cole-parmer WU  C Lauda WK 20  C10 15/03/20119PMT Array Cooling

Chiller Parameters Cooling Specification – Cooling Power (W) – Flow Rate (lpm) – Maximum Pressure (bar) Control – Set-point stability – Heater Power (W) – PID / remote control – Control Temperature (internal / external) Alarm signal (low flow, low level, ….) 15/03/201110PMT Array Cooling

Monitoring DCS Monitoring – ELMB (ATLAS) – quote from ELMB128 User Guide “It should be usable in USA15 outside of the calorimeter in the area of the MDTs and further out. This implies tolerance (with safety factors) to radiation up to about 5 Gy and 3·10 10 neutrons/cm2 for a period of 10 years and to a magnetic field up to 1.5 T.” Automated reading, archival & presentation in central DCS – Inputs 128 floating input (2 wire) channels Can be configured for DCV, Ohms… Can be used in pairs for 4-wire RTD (PT100) DSS – Detector Safety System High level alarms relating to safety ONLY Independent of DCS 15/03/201111PMT Array Cooling

Control Issues – Maintain the PMT arrays at a given temperature – Minimise the heat transfer between the box and the CEDAR Options 1.Monitor the temperature of the PMT array and manually adjust the set point of the cooling unit so that the global temperature of the electronics box is close to the CEDAR (hydrogen). Provide sufficient thermal insulation to minimise coupling between box and CEDAR. 2.Additionally, control the temperature of the cooling fluid using a feedback loop such that the temperature difference between the electronics box and the CEDAR is minimised. Provide sufficient thermal insulation to minimise coupling between box and CEDAR (hydrogen). 15/03/201112PMT Array Cooling

Thermal Interfaces Heat Paths – Nitrogen enclosure/beam pipe/CEDAR – Environment/Support Tube/CEDAR – Environment/beam pipe/CEDAR 15/03/201113PMT Array Cooling

Option 1 15/03/201114PMT Array Cooling

Option 2 15/03/201115PMT Array Cooling

Comments Option 1: – Likely to need greatest number of interventions to adjust Chiller PID controller – Needs Chiller with in-built heater – Needs high precision chiller set-point & stability Option 2: – Highest cooling power requirement – Need to develop fault tolerant PLC /heater sub-system We would most likely implement option 1 first as a prototype system before moving to option 2 15/03/2011PMT Array Cooling16

Further Thoughts about the Nitrogen Enclosure We want to optimise the nitrogen enclosure as follows: – Separate the 8 octants to enable the electronics in each to be accessed without compromising the nitrogen environment of the others; – Separate nitrogen feeds to each to enable faster flushing; – Minimise outlets to reduce sealing and gas-leakage problems by routing cooling pipe-work externally; – Assure a nitrogen atmosphere close to the quartz windows. We envisage a cylinder, coaxial with the beampipe, as part of the support structure, with gas flow to the enclosures surrounding electronics in each octant. All will be enclosed within an insulated, protective cover. 15/03/2011PMT Array Cooling17

15/03/2011PMT Array Cooling18