P roblem S olving I nnovator Solving Tomorrows Problems Today Current Situation Prevention / Detection Current Situation Prevention / Detection Analyzing.

Slides:



Advertisements
Similar presentations
P roblem S olving I nnovator Solving Tomorrows Problems Today IS - IS NOT / COMPARITIVE ANALYSIS motivates deliberate thinking about the Boundaries of.
Advertisements

RCM-Tool v1.0 Demo Performing Welcome to the RCM-Tool RCM-Tool
P roblem S olving I nnovator Solving Tomorrows Problems Today Electronic Brainstorm Database Electronic Brainstorm Database Brainstorming stimulates new.
P roblem S olving I nnovator Solving Tomorrows Problems Today 4 th Why / Root Cause Cause & Effect (Fishbone) 4 th Why / Root Cause Cause & Effect (Fishbone)
P roblem S olving I nnovator Solving Tomorrows Problems Today Primary function is to identify and organize possible causes of a specific effect and then.
P roblem S olving I nnovator Solving Tomorrows Problems Today To prevent any potential defects reaching the customer, define and implement containment.
P roblem S olving I nnovator Team problem solving in a production Environment.
P roblem S olving I nnovator Solving Tomorrows Problems Today Overview of how the 5 why automatically generates an FMEA & Control Plans 5 Why - FMEA Relationship.
P roblem S olving I nnovator Solving Tomorrows Problems Today Manual Prioritisation of 1 st Why / Functions. Manual Prioritisation of 1 st Why / Functions.
P roblem S olving I nnovator Solving Tomorrows Problems Today User Help The help feature is found through out the PSI.This enables the user to gain a.
P roblem S olving I nnovator Solving Tomorrows Problems Today 3 rd Why / Failure Effect Development 3 rd Why / Failure Effect Development 3 rd Why / Failure.
once the Team has Completed the 4th Why
P roblem S olving I nnovator Solving Tomorrows Problems Today Warnings Clear All prepares the PSI for the next problem. Clearing of D1-D3.
P roblem S olving I nnovator Solving Tomorrows Problems Today Potential Failure Mode DBS & Chart Root Cause DBS Reviewing/Updating the Databases and Analysing.
Ch 7.2 – Solving Equations with Grouping Symbols
P roblem S olving I nnovator Solving Tomorrows Problems Today Identify the need and reason for the PSI. Clearly document the Opportunity Description Identify.
P roblem S olving I nnovator Solving Tomorrows Problems Today 2 nd Why/Voting Techniques Automatic Ranking 2 nd Why/Voting Techniques Automatic Ranking.
P roblem S olving I nnovator Solving Tomorrows Problems Today 1 st Why / Function Pareto Chart 1 st Why / Function Pareto Chart Overview of Percentage.
P roblem S olving I nnovator Solving Tomorrows Problems Today 2 nd Why / Requirements Cause & Effect (Fishbone) 2 nd Why / Requirements Cause & Effect.
P roblem S olving I nnovator Solving Tomorrows Problems Today Potential Benefit Description Force Field Analysis will identify the viability of Recommended.
P roblem S olving I nnovator Solving Tomorrows Problems Today The Team should Accept the PSI Innovation and develop the Team Structure & Logistics The.
P roblem S olving I nnovator Solving Tomorrows Problems Today Potential Causes of a Problem can be Arranged into Independent Groups and each Group can.
Popcorn Sample PFMEA: Process Flow
Complex Numbers Section 2.1. Objectives Rewrite the square root of a negative number as a complex number. Write the complex conjugate of a complex number.
Lucas Phillips Anurag Nanajipuram FAILURE MODE AND EFFECT ANALYSIS.
Algebra 2 Friday Today, we will be able to… Define new vocabulary: radical equation; extraneous solution; radical inequality Solve equations containing.
P roblem S olving I nnovator Solving Tomorrows Problems Today Once the Problem Profile is determined, the Process Control can be implemented correctly.
P roblem S olving I nnovator Solving Tomorrows Problems Today Problem / Improvement Confirmation Problem / Improvement Confirmation Management should.
8D Report provides a summary of the PSI
P roblem S olving I nnovator Solving Tomorrows Problems Today The Fault Tree will automatically be generated once the Team has Completed the 5 th Why.
Solving Quadratic Equations by Completing the Square
P roblem S olving I nnovator Solving Tomorrows Problems Today Databases for Improvements Prevention/ Lessons Learned Prevention/ Lessons Learned Potential.
Partial Sums An Addition Algorithm.
Chapter 7 – Solving Systems of Linear Equations
P roblem S olving I nnovator Solving Tomorrows Problems Today Before beginning, establish the parameters of the opportunity. Do this by completing the.
Chapter 27 Additional Analysis Methods. Objectives Use various tools and techniques to compare current and future states in terms of pre defined metrics.
Day 1 agenda Return/go over chapter 4 test- 15 min Notes- 40 min Practice- 25 min Group assignment with graph paper Start homework- 10 min.
CHAPTER SOLVING FOR A VARIABLE. OBJECTIVES STUDENTS WILL BE ABLE: Solve a formula for a given variable. Solve an equation in two or more variables.
BEHAVIOR BASED SAFETY….PART II. THE INVENTORY  What observable “incorrect” behaviors result in unsafe acts??  What observable “correct” behaviors result.
P roblem S olving I nnovator Solving Tomorrows Problems Today Analysis to minimize all future negative unforeseen effects of stated PSI subject Risk Analysis.
CHAPTER 1 Section 1-5 solving equations with variables on both sides.
Using square roots to solve quadratic equations. 2x² = 8 22 x² = 4 The opposite of squaring a number is taking its square root √ 4= ± 2.
Solving Word Problems In Algebra County Write H eading Write E quation S olve Equation Write S olution asked for.
Developing an Algorithm. Simple Program Design, Fourth Edition Chapter 3 2 Objectives In this chapter you will be able to: Introduce methods of analyzing.
Warm up Today we will review the properties of exponents. You may have learned this before, but hopefully today you will have a better understanding as.
INFORMATION MANAGEMENT Module INFORMATION MANAGEMENT Module
By the end of this section, you will be able to: 1. Determine the number and type of roots for a polynomial equation; 2. Find the zeros of a polynomial.
Objective: 1d Textbooks pages: 199 – 210 Units: 4.5, 4.6.
Honors Algebra II Please take out your homework and check on your solution sheet 1-46 to 1-52 and methods and meanings for section Please record.
Warm Up 04/01 Practice CRCT Problem: Solve the following system of equations using the substitution method: 2x − 3y = − 1 y = x − 1.
P roblem S olving I nnovator Solving Tomorrows Problems Today Saving with a Backup insures that the work that has been done in the PSI can be recovered.
PreCalculus Section 1.6 Solve quadratic equations by: a. Factoring b. Completing the square c. Quadratic formula d. Programmed calculator Any equation.
P roblem S olving I nnovator Solving Tomorrows Problems Today Actions taken refers to the actual action taken as described in the FMEA Prevention & Detection.
Easysite Champions: The Basics *Insert Date Here*.
Addition. Mental Maths Learning Objective I am able to count in 2’s, 5’s, 7s, 10s, and ½’s.
6.1b Adding And subtracting polynomials
PreCalculus Section 1. 6 Solve quadratic equations by: a. Factoring b
Solving Systems of Linear Equations
Section 3.3 Solving Equations with Variables on Both Sides
Warm Up: Who Has? Squares and Roots Edition.
Analyze Fishbone Diagram
Writing the First Draft
FMEA تجزيه و تحليل خطا و آثار آن
Suggestions for Preparation
The Square Root Property and Completing the Square
Potential Failure Mode Analysis 4th Edition
Completing the Square pages 544–546 Exercises , – , –2
Double-Angle Formulas
Equations and Exponents
Q: How do I view and upload a document?
Presentation transcript:

P roblem S olving I nnovator Solving Tomorrows Problems Today Current Situation Prevention / Detection Current Situation Prevention / Detection Analyzing Potential Improvements Improvement Potential (SOD) (RPN) Improvement Potential (SOD) (RPN) Recommended Improvement Actions Recommended Improvement Actions Editing Recommended Improvement Actions

COVER PAGE Analyzing the Potential Improvements

View a summary of120 Root Causes & Preventive Actions 60 Detection Actions together with currentSOD & RPN Values Current Situation Prevention / Detection

Analyze/ View all by RPN VALUES Current RPN Value Potential RPN Value Function :--:Requirement :--: Failure Mode Potential RPN Value Improvement Improvement Potential (SOD) (RPN)

120Preventive Actions potential Prevention Improvements 60Detection Controls + 60 potential Detection Improvements Here you are able to input your Recommended Improvement Actions in the white fields and re-rate them accordingly. EDIT or ADD Recommended Prevention/Detection Improvements Recommended Improvement Actions

Recommended Prevention/Detection Improvements which are added here will be reflected in the 5Why Prevention and Detection Sections. EDIT or ADD Recommended Prevention/Detection Improvements Editing can be done on the Recommended Improvements Actions, 4 th Why-Root Cause, 5 th Why Detection and on the Fault Tree Analysis sheets Editing Recommended Improvement Actions

P roblem S olving I nnovator Solving Tomorrows Problems Today This completes the Prevention/Detection Risk(PRN)Index Recommended Improvement Actions Solutions/ Short List -15 Now start the Solutions /Short list - 15